Summary

The request inquired about the completion status of artwork, lighting, and a sea wall at Harris and Loch Promenades. The Department of Infrastructure disclosed that artwork design is ongoing with no final date, lighting infrastructure is ready for installation, and the Loch Promenade wall construction is likely to commence in late 2026.

Key Facts

  • Artwork panel designs for Harris Promenade are currently being completed.
  • A specific date for the installation of artwork and lighting at Harris Promenade is not yet finalised.
  • All necessary infrastructure and electric cabling for under-head lighting at Harris Promenade are installed.
  • Lighting strips will be fitted in partnership with Douglas City Council prior to artwork installation.
  • Construction of the Phase 2 sea wall at Loch Promenade is likely to commence in the final quarter of 2026.

Data Disclosed

  • 2026-01-27
  • 2026-02-03
  • 24/00743/B
  • 22/01264/B
  • 5252665
  • final quarter of 2026

Original Request

The recently constructed overtopping wall on Harris Promenade appears to be incomplete in accordance with planning application 24/00743/B. When will the following be completed: * The installation of information/artwork in the wall recess. * Under-head lighting in the recess. When will the overtopping wall at Loch Promenade, adjacent to the Bottleneck Car Park, be completed? Planning reference 22/01264/B.

Data Tables (1)

Full Response Text

Department of Infrastructure Sea Terminal Building, Douglas, Isle of Man, IM1 2RF

Contact: FOI Response Team Telephone: (01624) 686785 Email: dpo-doi@gov.im

Our ref: 5252665 2 February 2026

Dear ###

We write further to your request, received 27 January 2026, which states:

"The recently constructed overtopping wall on Harris Promenade appears to be incomplete in accordance with planning application 24/00743/B. When will the following be completed:

  • The installation of information/artwork in the wall recess.

  • Under-head lighting in the recess.

When will the overtopping wall at Loch Promenade, adjacent to the Bottleneck Car Park, be completed? Planning reference 22/01264/B."

Our response to your request is as follows: I have detailed below the information that is being released to you.

The installation of information/artwork in the wall recess. The design of the artwork panels is currently being completed. It is the Departments intention once the designs are complete, to have the artwork manufactured and installed. A date for this is not yet finalised.

Under-head lighting in the recess. All necessary infrastructure and electric cabling is installed to the base of the sea wall at the location where each art panel will reside. Working in partnership with Douglas City Council, the lighting strips will be fitted prior to the installation of the artwork panels.

When will the overtopping wall at Loch Promenade, adjacent to the Bottleneck Car Park, be completed? Planning reference 22/01264/B. An invitation for contractors to tender for the construction of the Phase 2 sea wall works will be notified in the next few weeks. Following a successful outcome, construction of the sea wall is likely to commence in the final quarter of 2026.

Please quote the reference number 5252665 in any future communications.

Your right to request a review

If you are unhappy with this response to your freedom of information request, you may ask us to carry out an internal review of the response, by completing a complaint form and submitting it electronically or by delivery/post.

An electronic version of our complaint form can be found by going to our website at https://services.gov.im/freedom-of-information/Review . If you would like a paper version of our complaint form to be sent to you by post, please contact me and I will be happy to arrange for this. Your review request should explain why you are dissatisfied with this response, and should be made as soon as practicable. We will respond as soon as the review has been concluded.

If you are not satisfied with the result of the review, you then have the right to appeal to the Information Commissioner for a decision on; 1. Whether we have responded to your request for information in accordance with Part 2 of the Freedom of Information Act 2015; or 2. Whether we are justified in refusing to give you the information requested.
In response to an application for review, the Information Commissioner may, at any time, attempt to resolve a matter by negotiation, conciliation, mediation or another form of alternative dispute resolution and will have regard to any outcome of this in making any subsequent decision. More detailed information on your right to a review can be found on the Information Commissioner’s website at www.inforights.im. Should you have any queries concerning this letter, please do not hesitate to contact me. Further information about freedom of information requests can be found at www.gov.im/foi.

I will now close your request as of this date.