The request sought a status report, correspondence, and restoration timeline for locomotive 16 'Mannin' from the Department of Infrastructure. The authority released partial correspondence regarding work progress and purchase orders but withheld specific costs and details under exemptions.
Key Facts
- Locomotive 16 'Mannin' is undergoing restoration work by Severn Valley Railway Holdings Ltd.
- Correspondence indicates that Section A of the worklist is complete, while the boiler is expected to finish before the chassis.
- Mike Szender of the Isle of Man Railways issued Purchase Order MSz_1033898 to cover ongoing frame work.
- Specific monetary values and detailed cost estimates were redacted from the released emails.
- The response included 52 pages across 4 documents with a final outcome date of 2026-01-20.
Data Disclosed
- 2025-12-17
- 2026-01-20
- 15/01/2026
- 02 August 2024
- 28 June 2024
- 26 June 2024
- 24 June 2024
- MSz_1033898
- MSz_1033876
- 5.5 man days
- 12 1/2 days labour
- 2024 rate
- 52 pages
- 4 documents
Exemptions Cited
- Section 25
- Section 30
Original Request
I seek the publication of the following information: Status report of locomotive 16 "Mannin" received from Severn Valley Railway Holdings Ltd along with any and all correspondence with Severn Valley regarding 16 "Mannin". Additionally, I also seek a timeline of the restoration along with a proposed deadline for the Locomotive to be operational again. Thank you.
Data Tables (37)
| Section 25 | |
|---|---|
| Section 25 |
| Section 25 |
|---|
| Section 25 |
| ection 30 |
|---|
| ection 30 |
| Section A trial fit, section B 1,2,3,4 & 8 of repairs to frames from scope of work | 12.50 | 20.0 % | Section 30 | ||
|---|---|---|---|---|---|
| Section 30 Total of 12.5 man days at 2024 Daily Rate of Our Reference. CE92 01685 Any queries to be advised within 14 days to: Section 25 |
| Section 30 | |
|---|---|
| Section 30 | |
| Section 30 |
| ection 30 |
|---|
| ection 30 |
| Section B 3,5,7 & 9 of repairs to frames from scope of work | 5.50 | 20.0 % | Section 30 | ||
|---|---|---|---|---|---|
| Section 30 Total of 5.5 man days at 2024 Daily Rate of Our Reference. CE92 01700 Any queries to be advised within 14 days to: Section 25 |
| Section 30 | |
|---|---|
| Section 30 | |
| Section 30 |
| Section 30 |
|---|
| Section 30 |
| Section B 5, 10 of repairs to frames from scope of work | 2.50 | 20.0 % | Section 30 | ||
|---|---|---|---|---|---|
| Section 30 Total of 2.5 man days at 2024 Daily Rate of Our Reference. CE92 01726 Any queries to be advised within 14 days to: Section 25 |
| Section 30 |
|---|
| Section 30 |
| Section 30 |
| ection 30 |
|---|
| ection 30 |
| Section B5, B11, C3 of repairs to frames from scope of work | 3.50 | 20.0 % | Section 30 | |||
|---|---|---|---|---|---|---|
| Material test required, mechanical (tensile), hardness & chemical OES | 1.00 | 20.0 % | Section 30 | |||
| Section 30 Total of 3.5 man days at 2024 Daily Rate of £ Our Reference. CE92 01736 Any queries to be advised within 14 days to: Section 25 |
| Section 30 | |
|---|---|
| Section 30 | |
| Section 30 |
| All boiler work undertaken on IOMR No 16 Mannin from w/c 4th Nov 24 - 31st Dec 2024 | |||||
|---|---|---|---|---|---|
| mark out for Firehole in copper door plate, fitting throat plate and ready to rivet, turn firebox, install Firehole spacer, fitting & riveting of foundation ring, machine girder links | 24.00 | 20.0 % | Section 30 | ||
| Material purchased - Long & Short girder stays, rear long girder, rear short stay | 1.00 | 20.0 % | Section 30 | ||
| Total of 24 man days at 2024 Boilersmith Daily Rate of Section 30 Next Invoice w/c 6th Jan 25 Our Reference CE93 00522 Any queries to be advised within 14 days to: Section 25 | |||||
| Section 25 | |||||
| Section 30 |
|---|
| Section 30 |
| Section 30 |
| Section B5, No 5 Pony Truck Anchor Plate & Fit Bush of repairs to frames from scope of work by Section 30 | 1.00 | 20.0 % | Section 30 |
|---|---|---|---|
| Total of 1 man days at 2024 Daily Rate of Section 30 Our Reference. CE92 01793 Any queries to be advised within 14 days to: Section 25 | |||
| Section 25 | |||
| Section 30 | |
|---|---|
| Section 30 | |
| Section 30 |
| ection 30 |
|---|
| ection 30 |
| All boiler work undertaken on IOMR No 16 'Mannin' from w/c 19th May 25 - 22nd June 25 | |||||
|---|---|---|---|---|---|
| Caulk of barrel to firebox & foundation ring, making & turning of centre longitundial stays, rivet & fitting of palm stays | 16.00 | 20.0 % | Section 30 | ||
| Consumables purchased | 1.00 | 20.0 % | Section 30 | ||
| Total of 16 man days at 2024 Boilersmith Daily Rate of Section 30 Next Invoice w/c 23rd June 25 Our Reference CE93 00548 Any queries to be advised within 14 days to: Section 25 |
| Section 30 |
|---|
| Section 30 |
| Section 30 |
| ection 30 |
|---|
| ection 30 |
| All chassis work undertaken on IOMR No 16 'Mannin' from w/c 14th July 25 - 10th Aug 25 | |||||
|---|---|---|---|---|---|
| Straightening of chassis | 3.00 | 20.0 % | Section 30 | ||
| Total of 3 man days at 2025 Boilersmith Daily Rate of Section 30 Next Invoice w/c 11th August 25 Our Reference CE92 01873 Any queries to be advised within 14 days to: Section 25 |
| Section 30 | |
|---|---|
| Section 30 | |
| Section 30 |
| Section 30 |
|---|
| Section 30 |
| All chassis work undertaken on IOMR No 16 'Mannin' from w/c 11th August 25 - 7th September 25 | |||||
|---|---|---|---|---|---|
| Straightening of chassis, rivet heads on frame | 2.00 | 20.0 % | Section 30 | ||
| Total of 2 man days at 2025 Boilersmith Daily Rate of Section 30 Next Invoice w/c 8th September 25 Our Reference CE92 01886 Any queries to be advised within 14 days to: Section 25 |
| Section 30 |
|---|
| Section 30 |
| Section 30 |
| ection 30 |
|---|
| ection 30 |
| All Frame work undertaken on IOMR No 16 'Mannin' from w/c 7 Sept 25 - 12th Oct 25 | |||
|---|---|---|---|
| Turning frames over, marking out rivets, modify length on fusible plugs and riveting | 4.00 | 20.0 % | Section 30 |
| Total of 4 man days at 2025 Boilersmith Daily Rate of Section 30 Next Invoice w/c 13th October 25 Our Reference CE93 00613 Any queries to be advised within 14 days to: Section 25 |
| Section 30 | |
|---|---|
| Section 30 | |
| Section 30 |
| Section 30 |
|---|
| Section 30 |
| All Frame work undertaken on IOMR No 16 'Mannin' from w/c 13th Oct 25 - 16th Nov 25 | |||||
|---|---|---|---|---|---|
| Prep & rivet front end of frames | 2.00 | 20.0 % | Section 30 | ||
| Total of 2 man days at 2025 Boilersmith Daily Rate of Section 30 Next Invoice w/c 16th November 25 Our Reference CE93 00615 Any queries to be advised within 14 days to: Section 25 |
| Section 30 |
|---|
| Section 30 |
| Section 30 |
| ection 30 |
|---|
| ection 30 |
| All Frame work undertaken on IOMR No 16 'Mannin' from w/c 17th Nov 25 - 31st Dec 25 | |||
|---|---|---|---|
| Rivet front end, the fitting of brake hanger brackets, clean & paint & removal of rusty areas, tidy of the frames ready for lifting | 5.50 | 20.0 % | Section 30 |
| Total of 5.5 man days at 2025 Boilersmith Daily Rate of Section 30 Next Invoice w/c 5th January 2026 Our Reference CE93 00620 Any queries to be advised within 14 days to: Section 25 |
| Section 30 | |
|---|---|
| Section 30 | |
| Section 30 |
Full Response Text
file:///C/...op/Email%20from%20duncan.ballard@svrlive.com%20-%20RE_%20Mannin%20Worklist%20(download%20from%205175545).txt[15/01/2026 14:42:40] Caution: This email is from an external sender. Please take care before opening any attachments or following any links. Mike, Thank you for the PO. We will use this number and keep an over view when invoicing to the amount remaining on it. I think that is the fair and correct assumption currently as a typical month work on the chassis with the manpower I have available to me. At the moment I imagine the boiler will be completed long before the chassis so some timing will need to be considered on both elements. Kind regards Head of Steam Engineering Severn Valley Railway (Holdings) PLC -----Original Message----- From: Szender, Mike Sent: 02 August 2024 14:03 To: Subject: RE: 'Mannin' Worklist Duncan Have treated the price given as a typical month and have written a P.O. MSz_1033898 to cover hopefully a number of months activities. Please invoice the frame work against this P.O. Best Regards Mike Szender T&RS Manager Isle of Man Railways Public Transport Division - Department of Infrastructure Mobile : (+44) -----Original Message----- From: Szender, Mike Sent: 02 August 2024 13:06 To: Subject: RE: 'Mannin' Worklist Hi Am tempted to raise a P.O. for more than just the month's work. I don't have an estimate of the expected costs for the overall scope being worked out with . But how long do you anticipate the frames of Mannin will take? Best Regards Mike Szender Section 25 Section 25 Section 25 Section 25 Section 25 Section 25 Section 25 Section 25 Section 25 file:///C/...op/Email%20from%20duncan.ballard@svrlive.com%20-%20RE_%20Mannin%20Worklist%20(download%20from%205175545).txt[15/01/2026 14:42:40] T&RS Manager Isle of Man Railways Public Transport Division - Department of Infrastructure Mobile : (+44) -----Original Message----- From: Sent: 02 August 2024 11:09 To: Szender, Mike Subject: RE: 'Mannin' Worklist Caution: This email is from an external sender. Please take care before opening any attachments or following any links. Good morning Mike, I hope all is well with you? Is it possible for a further PO to cover the recent work on No 16's frames please? This is for 5.5 man days to the value of £ excluding VAT. If I have this we can ensure that we send the invoice and the costs are largely up to date. Kind regards Head of Steam Engineering Severn Valley Railway (Holdings) PLC -----Original Message----- From: Szender, Mike Mike.Szender@gov.im Sent: 28 June 2024 10:59 To: Duncan Ballard duncan.ballard@svrlive.com Cc: Subject: RE: 'Mannin' Worklist Hi Attached is the P.O. MSz_1033876 for the work completed on Mannin's frames. Best Regards Mike Szender T&RS Manager Isle of Man Railways Public Transport Division - Department of Infrastructure Mobile : (+44) -----Original Message----- From: Sent: 26 June 2024 11:19 To: Mike Szender < Cc: Szender, Mike Subject: RE: 'Mannin' Worklist Caution: This email is from an external sender. Please take care before opening any attachments or following any links. Section 25 Section 25 Section 25 Section 25 Section 25 Section 25 Section 25 Section 25 Section 25 Section 25 Section 25 Section 25 Section 30 file:///C/...op/Email%20from%20duncan.ballard@svrlive.com%20-%20RE_%20Mannin%20Worklist%20(download%20from%205175545).txt[15/01/2026 14:42:40] Good morning Thank you for the job scope for the further work identified on 'Mannin' - the mechanical phase. Note your request, if you can bear with me as I'm just dealing with another couple of jobs I'm currently pricing and costing. As Sections E and F are for replacement Smokebox and Ashpan I take it the tank riveting and other items are covered under the day rate principle? Mike, Is it possible for a purchase order to cover the items completed as per notes on Section A and parts of Section B. This for 12 1/2 days labour, which at the 2024 rate is for + vat. I can then raise a sales invoice for this which will keep the finance team happy, and keep the mechanical stage of the project up to date. Kind regards Head of Steam Engineering Severn Valley Railway (Holdings) PLC -----Original Message----- From: Sent: 24 June 2024 11:44 To: Mike Szender < ;
Subject: 'Mannin' Worklist Hello Mike and Attached is the work list for 'Mannin'. Section 'A' has been completed. Section B items 1, 2, 3, 4 and 8 have been completed. could you provide an approximate estimate please for sections E and F. Regards [https://static.wixstatic.com/media/acbe94_76cfea3488ea4c1b95fabf3045fb0424~mv2.png] Sent by: This email and any attachments to it may be confidential and are intended solely for the use of the individual to whom it is addressed. This email is also subject to copyright. No part of it should be reproduced, adapted or transmitted without the written consent of the SVR. Any views or opinions expressed are solely those of the author and do not necessarily represent those of the Severn Valley Railway. If you are not the intended recipient of this email, you must neither take any action based upon its contents, nor copy or show it to anyone. Please contact support@svrlive.com if you believe you have received this email in error. Section 25 Section 25 Section 25 Section 25 Section 25 Section 25 Section 25 Section 25 Section 25 Section 25 Section 25 Section 25 Section 25 Section 30 Isle of Man Locomotive No 16
Notes of Discussions at SVR 8th July 2025
Updated 24/10/25
Present:
-
Frames Adjustment and Repairs ALL COMPLEDED EXCEPT ITEM 8
-
Fit rear axle hornguides.
-
Set frames level in longitudinal and transverse directions at all points forward of the rear axle using laser and spirit levels.
-
It will be observed that the rear of the LH frame plate is approximately 5/16” higher than the RH frame plate and that both plates lean top towards the right when viewed from the rear.
-
Make a vertical cut in LH frame plate directly above the rear axle, from the top of the plate down to the washout plug access hole.
-
Manipulate the frames such that the top of the LH frame plate is the same height as the RH frame plate. Check that the rear axle hornguides are approximately vertical (small errors can be corrected by machining later).
-
Apply further correction to the frames to allow for shrinkage in the weld, fit rear hornstays or similar to restrict movement and weld the full length of the cut, in stages and with further correction as required.
-
Check the frames for transverse level at all points and particularly at the rear tank support brackets.
-
Complete remaining work in Sections B to F of document dated 24/06/24
-
Regulator
to ask whether SVR could overhaul of the regulator and if so at what cost.
- J Pipe
It is agreed that a new casting is required. Initial investigation suggests that the existing pattern should be suitable. has retrieved the patterns from IoM Pattern Store and will arrange for modification if required and then arrange for a casting to be made and machined.
- Blower Valve
Only the mounting flange exists so the boiler will need to be blanked for the hydraulic test. ( will arrange for a replacement valve before the loco enters service). Section 25 Section 25 Section 25 Section 2 Section 25 5. Cladding Brackets
Two new brackets IMR 01067 have been given to
- Water Gauge Lamp Brackets
A batch of new brackets are overdue from the foundry. will check on delivery date. As the brackets are vulnerable to being bent when handling the boiler, they will not be fitted until the boiler is in the frames, the holes being temporarily plugged for the hydraulic test as required.
- Hydraulic Test
The boiler will be hydraulically tested following completion of the work by SVR reasonably imminently. But as the locomotive is unlikely to re-enter service just yet a further hydraulic test is likely at a future date. The initial hydraulic test will therefore be witnessed by to save cost and the final one by BES, possibly at Douglas.
- Steam Test
If the boiler is steamed at SVR it will be necessary to subsequently remove the dome and add preservative to the regulator components prior to being stored. It will then have to be opened up again to clean the preservative off before being used. Hence it would be better to delay the initial steam test until the loco is nearer to being ready, or for it to perhaps be done at Douglas. to discuss this with IMR.
- Smokebox Door
Appears to be in usable condition.
- Cladding
SVR to renovate, or where necessary renew, the boiler cladding and crinoline rings with reference to Beyer Peacock drawings 99511, 99531 and 99533. The backhead and smokebox bezels, safety valve bonnet and steam turret bonnet are all at Douglas and will be fitted when the loco returns there.
- Safety Valve Branch
to examine the safety valve branch when next at SVR to determine whether serviceable and whether the safety valve mountings have the latest stud layout.
- Hornguides
to discuss with the possibility of SVR being able to fit and machine the hornguides.
Section 25 Section 25 Section 2 Section 25 Section 25 Section 25 Section Section 25 Isle of Man Locomotive No 16
List of work to be undertaken by the Severn Valley Railway
04/11/25: All completed except sections in bold red
Section A, Trial fit of Boiler
-
Set frames level in longitudinal and transverse directions using laser and spirit levels
-
Fit boiler shell to frames (inner firebox not fitted)
-
Adjust smokebox tubeplate cut outs and expansion bracket positions on boiler such that boiler stands vertically when checked with the laser projected at the backhead.
-
Remove boiler and permanently attach expansion brackets.
Section B, Frame Repairs, Cylinder Area.
All rivets to be have shallow heads to match existing rivets rather that full snap heads.
-
Set frames level in longitudinal and transverse directions using laser and spirit levels.
-
Unbolt and remove from the front of the frames the new and refurbished frame stretchers etc that were fitted on the IoM.
-
Prepare front section of frames for riveting of the frame stretchers. Restore worn faces with weld. Paint mating surfaces with primer.
-
Bolt frame stretchers in position.
-
Machine Pony Truck Anchor Plate and fit bush as shown on drawing IMR 02012.
-
Thread the two ½” dia oil holes in the Pony Truck Bearer Plate 3/8 BSP for a depth of ½” from the top face.
-
Machine Pont Truck Bearer Plate and fit bush as shown on drawing IMR 02011.
-
Rivet coupling housing to the buffer plate
-
Rivet the transverse length of angle iron to the Frame Stiffener Plate (ie the horizontal plate below the cylinders)
-
Rivet Frame Stiffener Plate to the frames. Note: sides to be hot riveted not cold riveted as shown on drawing 99298. Refer also to the same drawing for details of which holes take bolts not rivets and which rivet holes are countersunk.
-
Rivet Pony Truck Anchor and Bearer plates to frames. Note: all to be hot riveted not cold riveted as shown on drawing 99298. Note also that the anchor plate should have the two ½” studs at the rear.
-
Remaining components are to be left bolted until the new cylinders are available, ie two pieces of 1.25” x 1.5” steel bar which support the front cylinder plates, the pair of front cylinder plates and the frame stretcher immediately to the rear of the cylinder.
-
Paint all bare metal with primer.
Section C, Frame Repairs, Rear
-
Rivet the two new frame stiffener angle irons, one each side, below the expansion bracket supports, 8 rivets each, hot riveted
-
Establish the reason for the rear RH tank support not being horizontal and make the necessary corrections.
-
Enlarge 4 sets of spring hanger holes to 1 ¼” dia and fit free issue tension bushes
Section D, Water Tanks
- Subject to satisfactory survey, rivet the water tank components together as shown on drawing 99326
Section E, Smokebox
-
Make a new smokebox with reference to the original item and drawing 99302. (ie front plate set on the wrapper and all rivets countersunk outside) Leave sides and front over length initially.
-
Fit boiler to frames
-
Fit smokebox to boiler, trimming sides and front as required
Note: Omit holes for vacuum ejector exhaust pipe and chimney until vacuum pipe and blastpipe are available.
Section F, Ashpan
- Make and fit a new ashpan. This to be a welded stainless steel version of the original design with external dimensions as shown on drawings 99303 and 99509. However the access door in the floor is to be rectangular and similar to drawing IMR 01057, and the front and rear damper doors are to be similar in construction to IMR 01055 and IMR
- An internal water sprinkler system with a hose connection is to be included. More information about the above details will be provided later.
Section 25
From:
To:
Sent: Fri Jun 19 2020 09:06:42 BST Subject: IoM Railways - Boiler No5 & Mannin (Attachments:) Photo3 PSM 18062020.jpg
However Mannin has now been stripped of asbestos and within weeks I am hoping to
have the boiler lifted from the frames. This boiler is the original 1925, copper firebox
design (B05-1925). I need to have the boiler placed in a suitable environment to allow
inspection and assessment, there is a desire to save as much of the original boiler as is
practical.
has been contracted to create the necessary new or repaired
boiler design as we conclude is appropriate, based of course on the existing heavy
repair of Loch’s boiler (1922, our ref. B08-1922) and the new build boilers. As such
the new/repaired boiler is likely to be the fifth of the boilers constructed.
Could you make a proposal for the receipt, inspection and storage of the boiler to
allow it to be assessed and costed as needed.
Best Regards
Mike Szender
Traction & Rolling Stock Manager
Isle of Man Railways
Public Transport Division - Department of Infrastructure
Transport Headquarters
Banks Circus
Douglas
Isle of Man
IM1 5PT
Section 25 Section 25 Section 25 Section 25 Section 25
Sent: Thu Sep 23 2021 08:49:03 BST Subject: RE: Boiler for IMR loco no 16 Hi
We have an specific contract for the new boilers as that was seen to be something
over and above the routine boilers inspections. The routine inspections are covered by
British Engineering Services policy TNN393817. We have told BES that the 5th boiler
will be different to that original envisaged.
For the inspection of Mannin’s existing boiler or parts thereof this should be covered by
TNN393817.
When we are certifying the design of a Mannin’s new boiler, ordering material
[Response truncated — full text is 63,780 characters]