Summary

The Department of Infrastructure responded to a request for accident statistics by providing a priority assessment table of highway schemes from 2011 to 2013. The document details 11 specific road improvement projects, including their costs, accident rates, and safety scores.

Key Facts

  • The response contains a 'Priority Assessment of Highway Schemes' covering projects from March 2011 to April 2013.
  • Eleven specific road schemes were listed with associated costs ranging from £10,000 to £100,000.
  • The assessment includes accident statistics measured as the number of accidents per 100 meters of road.
  • Schemes were ranked based on a total score derived from factors including safety audit, environmental impact, and public perception.
  • The highest-ranked scheme was 'Port Erin Prom - Phase 2' with a total score of 53.

Data Disclosed

  • 2017-04-05
  • 2017-04-10
  • 2013
  • 2011
  • £100,000
  • £35,000
  • £60,000
  • £10,000
  • £20,000
  • £50,000
  • 53
  • 92
  • 86
  • 83
  • 82
  • 49
  • 66
  • 63
  • 62
  • 51
  • 48
  • 43
  • 11
  • 4

Data Tables (1)

DEPARTMENT OF INFRAST NETWO PRIORITY ASSESSMENT OF RUCTU RK PLA HIIGH RE - HIGHWAYS DIVISION NNING WAY SCHEMES - April 2013
Scheme Name Assessment Date Network Planning Length of scheme Accident Stats Safety Audit Local Considerations Road Classificn Capacity Mngmnt Development Impact Existing Highway Envrnmntal Impact Public Transport Strategic Importance TOTAL SCORE COST FACTOR E R R SCORE Schemes Priority Assessment
TT Road Political Public
Estimate Impact Closures Input Perception Condition Impact £00,000 League Table E R R
metres No max Max 20 Max 10 Max 10 Max 10 Max 10 Max 20 Max 40 Max 20 Max 20 Max +/- 20 Max 20 Max 20 per 100m RANK Score
Port Erin Prom - Phase 2 Apr-13 £100,000 100 0 3 0 5 8 3 5 4 0 10 15 0 0 53 10 43 1 2 3 4 5 6 7 8 Hillberry Bend superelevation 92 86 83 82 66 63 62 51 49 48
Hillberry Bend superelevation Apr-13 £35,000 70 16 12 10 10 3 6 20 0 0 5 0 0 15 97 5 92 Waterworks Bend superelevation
Waterworks Bend superelevation Apr-13 £35,000 70 9 12 10 10 2 7 20 0 0 6 0 0 15 91 5 86 Bath Place roundabout left lane
Mount Murray Back Road Mar-11 £60,000 140 3 15 3 3 0 8 15 0 0 5 -10 0 10 52 4 48 Bemahague Road right turn lane
Ballavale Road, Santon visibility Apr-13 £10,000 70 2 10 0 0 0 3 20 0 0 5 -5 0 15 50 1 49 Old Abbatoir Road visibility
Old Abbatoir Road visibility Apr-13 £10,000 70 5 12 0 0 0 5 15 0 15 10 -5 0 10 67 1 66 Carr's Lane, Tromode visibility
Carr's Lane, Tromode visibility Apr-13 £20,000 70 5 12 0 10 7 7 15 0 0 10 -5 0 5 66 3 63 Lhergy Cripperty visibility
Clock Tower, Foxdale footway Apr-11 £50,000 50 0 12 3 0 0 8 20 0 0 18 -5 0 5 61 10 51 Clock Tower, Foxdale footway
Lhergy Cripperty visibility Apr-13 £10,000 140 17 10 3 5 1 7 10 0 0 10 0 0 0 63 1 62 9 Ballavale Road, Santon visibility
Bemahague Road right turn lane Apr-13 £50,000 60 2 5 5 5 8 5 15 25 5 5 -5 5 10 90 8 82 10 Mount Murray Back Road
Bath Place roundabout left lane Apr-13 £20,000 30 0 5 5 0 2 3 20 25 5 5 0 10 10 90 7 83 11 Port Erin Prom - Phase 2

Full Response Text

APPENDIX 1 11:45 07/04/2017 DEPARTMENT OF INFRASTRUCTURE - HIGHWAYS DIVISION NETWORK PLANNING PRIORITY ASSESSMENT OF HIIGHWAY SCHEMES - April 2013 Scheme Name Assessment Network Length of Accident Safety Local Considerations Road Capacity Development Existing Envrnmntal Public Strategic TOTAL COST E R R Schemes Date Planning scheme Stats Audit TT Road Political Public Classificn Mngmnt Impact Highway Impact Transport Importance SCORE FACTOR SCORE Priority Assessment Estimate Impact Closures Input Perception Condition Impact £00,000 League Table E R R No. metres No max Max 20 Max 10 Max 10 Max 10 Max 10 Max 20 Max 40 Max 20 Max 20 Max +/- 20 Max 20 Max 20 per 100m RANK Score 1 Port Erin Prom - Phase 2 Apr-13 £100,000 100 0 3 0 5 8 3 5 4 0 10 15 0 0 53 10 43 1 Hillberry Bend superelevation 92 2 Hillberry Bend superelevation Apr-13 £35,000 70 16 12 10 10 3 6 20 0 0 5 0 0 15 97 5 92 2 Waterworks Bend superelevation 86 3 Waterworks Bend superelevation Apr-13 £35,000 70 9 12 10 10 2 7 20 0 0 6 0 0 15 91 5 86 3 Bath Place roundabout left lane 83 4 Mount Murray Back Road Mar-11 £60,000 140 3 15 3 3 0 8 15 0 0 5 -10 0 10 52 4 48 4 Bemahague Road right turn lane 82 5 Ballavale Road, Santon visibility Apr-13 £10,000 70 2 10 0 0 0 3 20 0 0 5 -5 0 15 50 1 49 5 Old Abbatoir Road visibility 66 6 Old Abbatoir Road visibility Apr-13 £10,000 70 5 12 0 0 0 5 15 0 15 10 -5 0 10 67 1 66 6 Carr's Lane, Tromode visibility 63 7 Carr's Lane, Tromode visibility Apr-13 £20,000 70 5 12 0 10 7 7 15 0 0 10 -5 0 5 66 3 63 7 Lhergy Cripperty visibility 62 8 Clock Tower, Foxdale footway Apr-11 £50,000 50 0 12 3 0 0 8 20 0 0 18 -5 0 5 61 10 51 8 Clock Tower, Foxdale footway 51 9 Lhergy Cripperty visibility Apr-13 £10,000 140 17 10 3 5 1 7 10 0 0 10 0 0 0 63 1 62 9 Ballavale Road, Santon visibility 49 10 Bemahague Road right turn lane Apr-13 £50,000 60 2 5 5 5 8 5 15 25 5 5 -5 5 10 90 8 82 10 Mount Murray Back Road 48 11 Bath Place roundabout left lane Apr-13 £20,000 30 0 5 5 0 2 3 20 25 5 5 0 10 10 90 7 83 11 Port Erin Prom - Phase 2 43 12 13 14