The request sought correspondence regarding commissioning problems with horse tram points on the Douglas Promenade, and the authority disclosed all relevant information including design disputes and contract instructions.
Key Facts
The proposed tram alignment was initially deemed unsuitable from a highway perspective in December 2018.
A compensation event was notified in October 2021 regarding the instruction to send motor points to TSUK for factory fit testing.
In November 2021, a Project Manager's Instruction removed tram rail works between chainage 1060m and 1150m from the scope.
Technical discussions in early 2019 revealed that achieving a 1 in 7 gradient for all points was not practical for locations HS2 and HS3.
Burroughs Stewart Associates proposed standardizing the problematic points to a 1 in 4.5 gradient.
Data Disclosed
2022-01-26
2022-02-18
17-Dec-2018
22-Oct-2021
29-Nov-2021
01 February 2019
31 January 2019
CE-CNTFD-791
PMI-1133
CE-817
1 in 7
1.6
1 in 4.5
1060m
1150m
94 pages
5 documents
Original Request
Dear DOI
Please supply all correspondence between the railway inspectorate, Department of Infrastructure, Auldyn Construction and any other parties involved with the point work adjacent to Castle Mona Avenue on Douglas Promenade.
In particular in relation to the problems in commissioning it.
Thank you
Data Tables (79)
Redacted
Redacted
Redacted
1710 Douglas Promenade Refurbishments S&C
DETAIL C
LATERAL TIE BARS
SCALE 1 : 5
DETAIL B
MACHINED CROSSING
WELDED TO BASEPLATE
SCALE 1 : 10
DETAIL D
BASEPLATE WITH PAIR OF LINDAPTERS
APPROX 750mm SPACING
SCALE 1 : 5
UNLESS OTHERWISE SPECIFED: NAME DATE
DIMENSIONS ARE IN mm
DRAWN JDG 05/08/19
LINEAR TOLERANCES:
X 0 . 5
X . X 0 . 1 5 CHECKED BW 05/08/19
X . X X 0 . 0 5
ANGULAR TO L E R A N C E S:
DETAIL E X X. X 0 0 . . 5 2 ENG APPR. - - TITLE:
TURNOUT GA - HS1
CURVED BLADE LONGITUDINAL BASEPLATE INTERNAL RADII R0.3 MAX
DOUGLAS TRAMWAY S & C
(BLADE BOX SIDE WALL HIDDEN) INTERPRET GEOMETRIC
TOLERANCING PER: BS8888
COMMENTS:
SCALE 1 : 25 MATERIAL SIZE DWG. NO. REV
SEE NOTES
FNISH THIRD ANGLE PROJECTION A2 1918-HS1-01 P4
SEE NOTES
DO NOT SCALE DRAWING SCALE: 150 Wt CALC: SHEET 2 OF 2
UNLESS OTHERWISE SPECIFED:
DIMENSIONS ARE IN mm
LINEAR TOLERANCES:
X 0 . 5
X . X 0 . 1 5
X . X X 0 . 0 5
ANGULAR TO L E R A N C E S:
X 0 . 5
X. X 0 . 2
INTERNAL RADII R0.3 MAX
NAME
DATE
DRAWN
JDG
05/08/19
CHECKED
BW
05/08/19
ENG APPR.
-
-
TITLE:
TURNOUT GA - HS1
DOUGLAS TRAMWAY S & C
INTERPRET GEOMETRIC
TOLERANCING PER: BS8888
COMMENTS:
MATERIAL
SEE NOTES
SIZE
A2
DWG. NO.
1918-HS1-01
REV
P4
FNISH
SEE NOTES
THIRD ANGLE PROJECTION
DO NOT SCALE DRAWING
SCALE: 150
Wt CALC:
SHEET 2 OF 2
B
C
D
E
F
G
B
C
D
E
F
G
DETAIL C
LATERAL TIE BARS
SCALE 1 : 5
DETAIL B
MACHINED CROSSING
WELDED TO BASEPLATE
SCALE 1 : 10
DETAIL D
BASEPLATE WITH PAIR OF LINDAPTERS
APPROX 750mm SPACING
SCALE 1 : 5
UNLESS OTHERWISE SPECIFED: NAME DATE TRACK SYSTEMS UK LTD
DIMENSIONS ARE IN mm ENGINEERING DEPT: SAREDON WORKS
DRAWN JDG 05/08/19 MALTHOUSE LANE, GREAT SAREDON
LI N E AR T O L X E R A N C E 0 S . 5 : S H A R E S H LL
X . X 0 . 1 5 CHECKED BW 05/08/19 W O L V E R HA MPTON, UK
X . X X 0 . 0 5 W V 1 0 7 L N
A N G U LA R T O L E R A N C E S:
DETAIL E X X. X 0 0 . . 5 2 ENG APPR. - - TITLE:
TURNOUT GA - HS1
CURVED BLADE LONGITUDINAL BASEPLATE INTERNAL RADII R0.3 MAX
DOUGLAS TRAMWAY S & C
(BLADE BOX SIDE WALL HIDDEN) INTERPRET GEOMETRIC
TOLERANCING PER: BS8888
COMMENTS:
SCALE 1 : 25 MATERIAL SIZE DWG. NO. REV
SEE NOTES
FNISH THIRD ANGLE PROJECTION A2 1918-HS1-01 P7
SEE NOTES
DO NOT SCALE DRAWING SCALE: 150 Wt CALC: SHEET 2 OF 2
B
C
D
E
F
G
UNLESS OTHERWISE SPECIFED:
DIMENSIONS ARE IN mm
LINEAR TOLERANCES:
X 0 . 5
X . X 0 . 1 5
X . X X 0 . 0 5
ANGULAR TO L E R A N C E S:
X 0 . 5
X. X 0 . 2
INTERNAL RADII R0.3 MAX
NAME
DATE
TRACK SYSTEMS UK LTD
ENGINEERING DEPT: SAREDON WORKS
MALTHOUSE LANE, GREAT SAREDON
SHARESHLL
WOLVERHAMPTON, UK
WV10 7LN
DRAWN
JDG
05/08/19
CHECKED
BW
05/08/19
ENG APPR.
-
-
TITLE:
TURNOUT GA - HS1
DOUGLAS TRAMWAY S & C
INTERPRET GEOMETRIC
TOLERANCING PER: BS8888
COMMENTS:
MATERIAL
SEE NOTES
SIZE
A2
DWG. NO.
1918-HS1-01
REV
P7
FNISH
SEE NOTES
THIRD ANGLE PROJECTION
DO NOT SCALE DRAWING
SCALE: 150
Wt CALC:
SHEET 2 OF 2
B
C
D
E
F
G
1
ISO VIEW
785 672 (TO SUIT)
230
52
054
111 335
622
SWITCH MACHINE
SCALE 1:10
DETAIL 1
GENERAL NOTES:
SCALE 1:10
BLADE TRAVEL AT TIP 60mm
DRAWN RD 11/10/19 Project Registered Office:
1918 DBHT TURNOUT HS1
UNLESS SPECIFIED OTHERWISE: Brewood Lodge, Weston Park, Weston Under Lizard, Telford TF11 8NA
1. SPECIFED DIMENSIONS ARE IN MILLIMETERS CHECKED BW 14/10/19 0121 794 9855
2. LINEAR TOLERANCES:
Title
X ±0.5 APPROVED POINT MACHINE LAYOUT Design Office:
X.X ±015 TRACK SYSTEMS UK Ltd. Horton House, 8 Ditton Street, Ilminster TA19 0BQ
X.XX ±0.05 Comments: 0121 794 9856
3. ANGULAR TOLERANCES: www.track-systems-uk.co.uk
X X .X ± ± 0 0 . . 2 5° ° I b n y t e H g a r n a n t i i n o g n & of K p a o h i l n . t machine to be approved Drawing Number: 1918-HS1-01-500 S S c h a e l e e t 1 1 : 1 O 0 F 0 2 S R i e z v e P A 1 3 o de ff s i i c g e n @ @ t t r r a a c c k k - - s s y y s s t t e e m m s s - - u u k k . . c c o o . . u u k k W Ma o l r t k h s o : use Lane, Great Saredon, Nr Wolverhampton WV10 7LN
0121 794 9857
AWN RD
11/10/19
Project
1918 DBHT TURNOUT HS1
Title
POINT MACHINE LAYOUT
TRACK SYSTEMS UK Ltd.
www.track-systems-uk.co.uk
office@track-systems-uk.co.uk
design@track-systems-uk.co.uk
Registered Office:
Brewood Lodge, Weston Park, Weston Under Lizard, Telford TF11 8NA
0121 794 9855
Design Office:
Horton House, 8 Ditton Street, Ilminster TA19 0BQ
0121 794 9856
Works:
Malthouse Lane, Great Saredon, Nr Wolverhampton WV10 7LN
0121 794 9857
ECKED BW
14/10/19
PROVED
ments:
ration of point machine to be approved
anning & Kahl.
Drawing Number:
1918-HS1-01-500
Sheet 1 OF 2 RevP1
Scale 1:100 Size A3
230
52
1 335
11
A
B
400 TO BLADE TIP
C C
B
230
A
692
692
41 47
14,5
6,301 001 57
391
523
86
23 21
494
622
642
SECTION C-C
SECTION B-B SECTION A-A
SCALE 1:20
SCALE 1:20 SCALE 1:20
DRAWN RD 11/10/19 Project Registered Office:
1918 DBHT TURNOUT HS1
UNLESS SPECIFIED OTHERWISE: Brewood Lodge, Weston Park, Weston Under Lizard, Telford TF11 8NA
1. SPECIFED DIMENSIONS ARE IN MILLIMETERS CHECKED BW 14/10/19 0121 794 9855
2. LINEAR TOLERANCES:
Title
X ±0.5 APPROVED POINT MACHINE LAYOUT Design Office:
X.X ±015 TRACK SYSTEMS UK Ltd. Horton House, 8 Ditton Street, Ilminster TA19 0BQ
X.XX ±0.05 Comments: 0121 794 9856
3. ANGULAR TOLERANCES: www.track-systems-uk.co.uk
X X .X ± ± 0 0 . . 2 5° ° I b n y t e H g a r n a n t i i n o g n & of K p a o h i l n . t machine to be approved Drawing Number: 1918-HS1-01-500 S S c h a ee le t 1 2 :5 O 0 F 2 S R i e z v e P A 1 3 o de ff s i i c g e n @ @ t t r r a a c c k k - - s s y y s s t t e e m m s s - - u u k k . . c c o o . . u u k k W Ma o l r t k h s o : use Lane, Great Saredon, Nr Wolverhampton WV10 7LN
0121 794 9857
RD
11/10/19
Project
1918 DBHT TURNOUT HS1
Title
POINT MACHINE LAYOUT
Drawing Number: Sheet 2 OF 2 RevP1
1918-HS1-01-500
Scale 1:50 Size A3
TRACK SYSTEMS UK Ltd.
www.track-systems-uk.co.uk
office@track-systems-uk.co.uk
design@track-systems-uk.co.uk
Registered Office:
Brewood Lodge, Weston Park, Weston Under Lizard, Telford TF11 8NA
0121 794 9855
Design Office:
Horton House, 8 Ditton Street, Ilminster TA19 0BQ
0121 794 9856
Works:
Malthouse Lane, Great Saredon, Nr Wolverhampton WV10 7LN
0121 794 9857
KED
BW
14/10/19
OVED
Drawing Number: She
1918-HS1-01-500
Sca
523
86
86
GENERAL NOTES:
1. ALL UNITS MILLIMETRES mm U.N.O.
2. SWITCH TOE OPENING 45mm
COVER PLATE - EXISTING HEEL BLOCK
3. MINIMUM SWITCH HEEL OPENING 26mm
4. REMOVEABLE FALSE FLOOR WITHIN BLADE BOX
5. BLADE BOX DESIGN TO SUIT INTEGRATION WITH HANNING & KAHL SWITCH MACHINE HW500 O-Z, SEE DRAWING
NEW SOLID HEEL BLOCK
D00304183
FLUSH WITH RAIL TOP
6. CONNECTION BETWEEN BLADES AND SWITCH MACHINE TO BE FINALISED
7. BLADE BOX DRAINAGE ARRANGEMENT TO BE FINALISED
DETAIL ON BLADES
PARTIAL SECTION ON STRAIGHT STOCK RAIL & BLADE
BLADE BOX TOP FLANGE
MAINTAINS GUTTER CLEARANCE
RETAINED GREY
WITH BLADES IN CLOSED POS.
MODIFIED RED
BLADES BLUE
HANNING & KAHL SWITCH MACHINE - HW500 O-Z
LID TO SUIT OPEN BLADE POSITION
CURVED CUT ON STRAIGHT STOCK RAIL
TO FOLLOW BLADE BACK IN CLOSED POS.
FALSE FLOOR
BLADE FROM 60 x 60mm BAR
SLIDE CHAIRS FITTED TO FALSE FLOOR
SWITCH MACHINE SEALING PLATE
BOLTED BETWEEN STOCK RAILS
DRAWN RD 25/10/2021 Projec I t oM DBHT - TURNOUT MODIFICATIONS Client Registered Office:
Brewood Lodge, Weston Park, Weston Under Lizard, Telford TF11 8NA
CHECKED DE 25/10/21 0121 794 9855
Title
APPROVED CP 27/10/21 HS2 GENERAL ARRANGEMENT TRACK SYSTEMS UK Ltd. Design Office:
Horton House, 8 Ditton Street, Ilminster TA19 0BQ
0121 794 9856
Comments:
www.track-systems-uk.co.uk
Drawing Number: Sheet 1 OF 2 Rev A Works:
office@track-systems-uk.co.uk
2123-01-01 Malthouse Lane, Great Saredon, Nr Wolverhampton WV10 7LN
NOT TO SCALE Size A2 AULDYN CONSTRUCTION Ltd. design@track-systems-uk.co.uk 0121 794 9857
DRAWN
RD
25/10/2021
Project C
IoM DBHT - TURNOUT MODIFICATIONS
Title
HS2 GENERAL ARRANGEMENT
Drawing Number: Sheet 1 OF 2 Rev A
2123-01-01
NOT TO SCALE Size A2 A
lient
ULDYN CONSTRUCTION Ltd.
Registered Office:
Brewood Lodge, Weston Park, Weston Under Lizard, Telford TF11 8NA
0121 794 9855
Design Office:
TRACK SYSTEMS UK Ltd.
Horton House, 8 Ditton Street, Ilminster TA19 0BQ
0121 794 9856
www.track-systems-uk.co.uk
Works:
office@track-systems-uk.co.uk
Malthouse Lane, Great Saredon, Nr Wolverhampton WV10 7LN
design@track-systems-uk.co.uk
0121 794 9857
CHECKED
DE
25/10/21
APPROVED
CP
27/10/21
Comments:
Drawing Number:
2123-01-01
A B C
C
A B
16627
PLAN VIEW
45
61 REF.
60 60
SECTION A-A SECTION B-B SECTION C-C
DAEH
BLADE TOE OPENING FALSE FLOOR HEIGHT HEEL BLOCK
LIAR
GUTTER CLEARANCE
WOLEB
HTPED
ROOLF
ESLAF
27
DRAWN RD 25/10/2021 Projec I t oM DBHT - TURNOUT MODIFICATIONS Client Registered Office:
Brewood Lodge, Weston Park, Weston Under Lizard, Telford TF11 8NA
CHECKED 0121 794 9855 DE 25/10/21
Title
APPROVED HS2 GENERAL ARRANGEMENT Design Office: TRACK SYSTEMS UK Ltd. CP 27/10/21
Horton House, 8 Ditton Street, Ilminster TA19 0BQ
0121 794 9856
Comments:
www.track-systems-uk.co.uk
Drawing Number: Sheet 2 OF 2 Rev A Works:
office@track-systems-uk.co.uk
2123-01-01 Malthouse Lane, Great Saredon, Nr Wolverhampton WV10 7LN
NOT TO SCALE Size A2 AULDYN CONSTRUCTION Ltd. design@track-systems-uk.co.uk 0121 794 9857
DRAWN
RD
25/10/2021
Project
IoM DBHT - TURNOUT MODIFICATIONS
Title
HS2 GENERAL ARRANGEMENT
Client
AULDYN CONSTRUCTION Ltd.
Registered Office:
Brewood Lodge, Weston Park, Weston Under Lizard, Telford TF11 8NA
0121 794 9855
Design Office:
TRACK SYSTEMS UK Ltd.
Horton House, 8 Ditton Street, Ilminster TA19 0BQ
0121 794 9856
www.track-systems-uk.co.uk
Works:
office@track-systems-uk.co.uk
Malthouse Lane, Great Saredon, Nr Wolverhampton WV10 7LN
design@track-systems-uk.co.uk
0121 794 9857
CHECKED
DE
25/10/21
APPROVED
CP
27/10/21
Comments:
Drawing Number:
2123-01-01
Sheet 2 OF 2 Rev A
NOT TO SCALE Size A2
Saunders, Gary; Mike Davies; Redacted Redacted ); Red
acte
d
41991-00 - Douglas Promenade, Isle of Man
Redacted
);
Redacted
);
Redacted
)
Douglas Promenade - Changes to the S&C Units
This email contains information which is confidential and may also be privileged. It is for the exclusive use of the addressee. If you are not the
addressee, please note that any distribution, dissemination, copying or use of this communication or the information in it is prohibited. If you have
received this email in error, please notify the author by replying to this email or telephone us immediately.
Auldyn Construction Limited is incorporated in the Isle of Man Company No: 12207 - Registered Office: Broom House, Foxdale Road, Malew, Isle
of Man, IM9 3DW
Redacted
on behalf of Longworth, Ian
16 November 2021 17:31
Redacted
Redacted
>; Saunders, Gary
Redacted
Redacted
on behalf of Longworth, Ian
01 June 2021 14:49
, Andrew (DOI);
Redacted
(DOI)
FW: 1710 Horse Tram Track and Signals - Douglas Promenade Refurbishment
Longworth, Ian; David Keay
)
Robinson, Jeffrey; Podmore, Keith; Mike Davies;
, Tadhg (AULDYN)
Redacted
Redacted
)
Redacted
This email contains information which is confidential and may also be privileged. It is for the exclusive use of the addressee. If you are not the
addressee, please note that any distribution, dissemination, copying or use of this communication or the information in it is prohibited. If you have
received this email in error, please notify the author by replying to this email or telephone us immediately.
Auldyn Construction Limited is incorporated in the Isle of Man Company No: 12207 - Registered Office: Broom House, Foxdale Road, Malew, Isle
of Man, IM9 3DW
Mobile (
www.track‐systems‐uk.co.uk
Redacted
)
Redacted
>
22 November 2019 09:20
, Tadhg (AULDYN);
Redacted
FW: Amended drawings
This email contains information which is confidential and may also be privileged. It is for the exclusive use of the addressee. If you are not the
addressee, please note that any distribution, dissemination, copying or use of this communication or the information in it is prohibited. If you have
received this email in error, please notify the author by replying to this email or telephone us immediately.
Auldyn Construction Limited is incorporated in the Isle of Man Company No: 12207 - Registered Office: Broom House, Foxdale Road, Malew, Isle
of Man, IM9 3DW
This email contains information which is confidential and may also be privileged. It is for the exclusive use of the addressee. If you are not the
addressee, please note that any distribution, dissemination, copying or use of this communication or the information in it is prohibited. If you have
received this email in error, please notify the author by replying to this email or telephone us immediately.
Auldyn Construction Limited is incorporated in the Isle of Man Company No: 12207 - Registered Office: Broom House, Foxdale Road, Malew, Isle
of Man, IM9 3DW
Redacted
Redacted
This email contains information which is confidential and may also be privileged. It is for the exclusive use of the addressee. If you are not the
addressee, please note that any distribution, dissemination, copying or use of this communication or the information in it is prohibited. If you have
received this email in error, please notify the author by replying to this email or telephone us immediately.
Auldyn Construction Limited is incorporated in the Isle of Man Company No: 12207 - Registered Office: Broom House, Foxdale Road, Malew, Isle
of Man, IM9 3DW
This email contains information which is confidential and may also be privileged. It is for the exclusive use of the addressee. If you are not the
addressee, please note that any distribution, dissemination, copying or use of this communication or the information in it is prohibited. If you have
received this email in error, please notify the author by replying to this email or telephone us immediately.
Auldyn Construction Limited is incorporated in the Isle of Man Company No: 12207 - Registered Office: Broom House, Foxdale Road, Malew, Isle
of Man, IM9 3DW
Redacted
23 November 2020 17:01
, Andrew (DOI)
FW: Data sheets hydraulic units / HSK projecting notes
Redacted
Redacted
Redacted
Redacted
Mobile (UK)
www.track‐systems‐uk.co.uk
Redacted
Redacted
Redacted
Redacted
>;
Redacted
Redacted
Redac
ted
Redacted
Redacted
Redacted
Redacted
Redacted
Redacted
Redacted
, Tadhg (AULDYN)
24 January 2022 15:46
Redacted
);
Redacted
)
Fwd: TSUK 2123 IoM Switch Modifications
Keith
For info
Regards
Redacted
Redacted
Red
a cte
Thanks for that, but the other questions are of greater concern. I await a response to those.
Thanks
Redacted
07 September 2021 20:26
Robinson, Jeffrey; Saunders, Gary; Podmore, Keith; Alistair Burroughs; Reda
cted
RE: 1710 Douglas Promenade Refurbishment - Tramway Signalling
; Mike Davies
Reda
Redacted
This email contains information which is confidential and may also be privileged. It is for the exclusive use of the addressee. If you are not the
addressee, please note that any distribution, dissemination, copying or use of this communication or the information in it is prohibited. If you have
received this email in error, please notify the author by replying to this email or telephone us immediately.
We need to urgently order the rods, as per the attached H&K quote. Can we progress this today.
Thanks
Redacted
Redacte
Redac
ted
, Tadhg (AULDYN)
13 September 2021 15:36
Redacted
);
Redacted
Redacted
)
Douglas Promenade - Changes to the S&C Units
This email contains information which is confidential and may also be privileged. It is for the exclusive use of the addressee. If you are not the
addressee, please note that any distribution, dissemination, copying or use of this communication or the information in it is prohibited. If you have
received this email in error, please notify the author by replying to this email or telephone us immediately.
Auldyn Construction Limited is incorporated in the Isle of Man Company No: 12207 - Registered Office: Broom House, Foxdale Road, Malew, Isle
of Man, IM9 3DW
Full Response Text
Appendix 1
Mon, 17-Dec-2018
Balthane Industrial Estate
Ballasalla
Isle of Man
IM9 2AQ
Isle of Man Government
Ellerslie Depot
Crosby
Isle of Man
IM4 2HA
Please ask for:
Ref:
Keith Podmore
Phone
Email
Date
Auldyn Construction Ltd
Douglas Promenade Refurbishment
General Communication: GC-43
Re: Further to GC-42 (S&C Unit Design)
With reference to 21.2 or 23.1; PM reply to C design submission
Thank you for the draft details. After initial consideration, it is apparent that the proposed alignment is
unsuitable, specifically from a highway perspective.
To take this forward,
is going to arrange for a meeting between Bonner Rail, BSA and
Highways to confirm constraints and allow the design to be progressed.
Any queries, please let me know.
Kind regards,
Keith Podmore
Project Manager
1 of 2
Mon, 17-Dec-2018 15:32
Redacted
Redacted
Reda
Redacted
Reda
cted
Redacted
Fri, 22-Oct-2021
Ellerslie Depot
Crosby
Isle of Man
IM4 2HA
Auldyn Construction Ltd
Balthane Industrial Estate
Ballasalla
Isle of Man
IM9 2AQ
Please ask for:
Cross Ref:
Phone
Email
Date
Isle of Man Government
Dear Keith Podmore
Douglas Promenade Refurbishment
Notification of compensation event CE-CNTFD-791
Forward of Motor Points to TSUK
In accordance with clause 61.3 of the conditions of contract, I notify you of a compensation event.
We consider the compensation event type is:
(1) PM instruction changing the Scope
The detail of this matter is:
Following Rail meeting 20/10/21 it was instructed that the motor points located on Island are to be
issued to TSUK for factory fit test.
Yours sincerely,
on behalf of
Contractor
1 of 1
Fri, 22-Oct-2021 11:35
Redacted
Redacted
Redacted
Redacted
Redacted
Redacted
Mon, 29-Nov-2021
Balthane Industrial Estate
Ballasalla
Isle of Man
IM9 2AQ
Isle of Man Government
Ellerslie Depot
Crosby
Isle of Man
IM4 2HA
Please ask for:
Cross Ref:
Keith Podmore
Phone
Email
Date
Auldyn Construction Ltd
Dear Sir/Madam,
Douglas Promenade Refurbishment
Project Manager's Instruction PMI-1133
Tram Rail Ch.1060 to 1150m (CE-817)
In accordance with clause 14.3 of the conditions of contract I instruct the following:
The section of tram rail and associated finishing works (coloured concrete infill, adjacent footway and
guidance paving) between chainage 1060m and circa 1150m is to be removed from the Scope of
work.
The Contractor is to provide a quotation for reduced Prices and confirmation of the earlier Planned
Completion Date.
These elements of work are to be completed outside of the Scope and following Completion. The
Contractor and Client shall agree a seperate programme of work for these elements and the
Contractor should account for this in the above submission. The area in question will be left secure
following Completion.
Yours faithfully,
Keith Podmore
Project Manager
1 of 1
Mon, 29-Nov-2021 07:57
Redacted
Redacted
Redacted
1
From:
Alistair Burroughs Alistair@burroughs.co.uk
Sent:
01 February 2019 15:55
To:
Longworth, Ian
Cc:
Subject:
1710 Douglas Promenade Refurbishments S&C
Attachments:
AUL001-BNR-DRG-TRK-00002- A01-1.pdf; AUL001-BNR-DRG-TRK-00003-
A01-3.pdf
Categories:
me
Dear Ian,
I’m aware that you are not around until Tuesday of next week, when hopefully we may touch base with each other.
As you know as a follow on from our meeting
liaised with team and has managed to achieve 1 in 7 for all but
two of the sets of points.
Please scroll down to
email, which summarises the subsequent discussion between you and
on the
points for the Horse Tram.
On the basis of it, I have instructed that the 1 in 7 points (as you requested similar MER) may be manufactured, as
may the points for the interlaced section.
This leaves HS2 and HS3 outstanding.
At this stage in the scheme it is not practical or possible to achieve 1 in 7, It is only possible to achieve 1.6 at HS2 and
1in 4.5 at HS3. What I would suggest is we make them both the same at 1 in 4.5.
I appreciate that this is disappointing from your perspective. We could make all the Horse Tram Points the same, but
then I accept they would not align with the points on the MER.
I look forward to hearing from you.
Kind regards
Alistair Burroughs MPhil C.WEM MCIWEM FConsE
Managing Director
BURROUGHS STEWART ASSOCIATES
Telephone:
+44 (0)1624 662 155 / +44 (0)29 2064 7484 (Cardiff Office)
Fax:
+44 (0)1624 662 141 / +44 (0)29 2064 7499 (Cardiff Office)
Mobile:
Website:
www.bsa.co.im
Email:
alistair.burroughs@bsa.co.im
Registered Office: 17A Victoria Street, DOUGLAS, Isle of Man, IM1 2LW
Registration No: 059958C
Associated
Offices:
Cardiff
Redacted
Redacted
Red
t
Redac
t d
Red
t
2
THINK SUSTAINABILITY: Do you really need to print this email
Email signature v1.12
From:
[mailto
]
Sent: 31 January 2019 22:15
To: Alistair Burroughs
Subject: FW: 1710 Douglas prom S&C
Alistair, summary of discussions with Ian
All
Following our collective review and subsequent meeting with Ian I would confirm the following.
Strathallen – all turnouts to be 1in7, constraints advised by IOMR which will be added to drawing.
It is not envisaged that achieving this is problematic.
Interlacing CS1 & CS2 proposed identical units acceptable
HS4 1in7 to be achieved, it is envisaged that this can be achieved
HS1 1in7 to be achieved, it is envisaged that this can be achieved
HS2 This being the intended terminus, IOMR advised that achieving a 1in7 must be achieved at this point. Currently
a 1in6 is proposed and achievable in this location. 1in7 required to avoid premature wear of turnout
To achieve a 1in7 would require one of the following
Demolish and rebuild end of garden wall 6 (approx. 5m long and relocating seaward by <0.5m)
Seek dispensation to reduce clearance requirement and sign area as limited clearance
Move alignment into highway, redesign highway/ reduce platform area
Reduce length/width between foul points significantly
HS3 This being the intended terminus, IOMR advised that achieving a 1in7 must be achieved at this point. Currently
a 1in4.5 is proposed and achievable in this location.
To achieve a 1in7 would require one of the following
Significant highway realignment
Encroachment onto walkway
Installation of long lead points and interlacing to move the pointwork north onto the straight section of
track
Reduce length/width between foul points significantly
My understanding is that detailed design can now progress for HS1,HS4, CS1&2 and the 4 nr units at Strathallen in
line with the above summary.
To resolve the issues surrounding HS2 & HS3 will require an evaluation of whether any of the options are acceptable
and which if any is the preference
Kind regards
Redacted
Redacted
Redacted
Red
t
1710 / ACB
18th October 2021
DOUGLAS PROMENADE REFURBISHMENT – HORSE TRAM TRACK
TIMELINE 8TH NOVEMBER 2019 TO 15TH OCTOBER 2021
The use of the 57R1 came from a report commissioned by Isle of Man Railways, from
Manchester Metropolitan University, Rail Technology Unit, March 2012. It is particularly
relevant where tight curves are required such as at the points.
8th November 20118 and 24th January 2019: Meeting held with Transport Services to
discuss the rail requirements including blade geometry, IL requested 1:7, this
resulted in the need to demolish the northern most wall to the sunken gardens, and
amendments to highway design. IL confirms that he would like the points north of the
works to be ordered at the same time, note 15, subject to a separate order.
12th February 2019, comments received from IL on the draft notes of the meeting,
which were amended and then issued.
9th April 2019, email TOM to KP and ACB raising design queries on the S&Cs,
forwarded by ACB to IL.
10th April 2019, IL responds and ACB issues response to TOM.
2nd September 2019, ACB issues drawings received from TSUK of the points to IL for
comment. Drawings comprise DBHT / MER Wheel Rail Interaction, Turnout GA –
HS1 Douglas Tramway (2 sheets), Turnout GA – HS1 Comparison Douglas
Tramways S&C, Technical Note: Douglas Bay Horse Tramway Wheelset Interface
with new S&C Design for MER Vehicles.
11th September 2019, IL replies, raising concerns, in particular about the compatibility
of Horse Tram wheels and MER tram wheels
12th September 2019,
of SCUK following a meeting with IL sends an
email to TOM, copying the mail to IL, confirming that the wheel sets will be based on
MER and that if required IL would modify the 13 Horse Tram wheel sets.
13th September 2019, IL emails TOM and confirms, “I agreed that this is the most
cost effective and practical way forward.”
16th September 2019, TOM confirms to ACB that he will “…..take Ian’s comments as
approval and proceed accordingly.”
2nd July 2021, IL to ACB advises that the point work at Castle Mona is not normal for
a street tramway.
12th July 2021, ACB responds in detail, expressing his concerns.
Redacted
13. 12th August 2021 ACB through IL coordinates a meeting held with the Rail Regulator.
At the meeting
explained why the gap should be the width of the
groove, and this was appreciated. The Rail Regulator expressed his concerns at the
width of the gap, explaining that it may result in the horse’s hoof being caught, and
asked for it to be reduced to 40mm.
24th August 2021,
issues notes of the meeting
07th September 2021, in an email
advises that there is no standard width
for points but that they would not usually less than the groove.
Redacted
Redacted
Redacted
DETAIL B
MACHINED CROSSING
WELDED TO BASEPLATE
SCALE 1 : 10
DETAIL D
BASEPLATE WITH PAIR OF LINDAPTERS
APPROX 750mm SPACING
SCALE 1 : 5
DETAIL C
LATERAL TIE BARS
SCALE 1 : 5
DETAIL E
CURVED BLADE LONGITUDINAL BASEPLATE
(BLADE BOX SIDE WALL HIDDEN)
SCALE 1 : 25
6
D
C
B
A
E
F
G
H
E
A
B
C
D
F
5
4
3
2
1
7
8
9
10
11
12
1
2
3
4
5
6
7
8
G
DO NOT SCALE DRAWING
DIMENSIONS ARE IN mm
LINEAR TOLERANCES:
X 0.5
X.X 0.15
X.XX 0.05
ANGULAR TOLERANCES:
X 0.5
X.X 0.2
INTERNAL RADII R0.3 MAX
INTERPRET GEOMETRIC
TOLERANCING PER: BS8888
MATERIAL
F NISH
SEE NOTES
SEE NOTES
DRAWN
CHECKED
ENG APPR.
COMMENTS:
DATE
NAME
TITLE:
SIZE
A2
DWG. NO.
REV
Wt CALC:
SCALE: 1 50
UNLESS OTHERWISE SPECIF ED:
JDG
BW
-
-
05/08/19
05/08/19
SHEET 2 OF 2
P4
TURNOUT GA - HS1
DOUGLAS TRAMWAY S & C
THIRD ANGLE PROJECTION
12
10
9
11
H
1918-HS1-01
DETAIL B
MACHINED CROSSING
WELDED TO BASEPLATE
SCALE 1 : 10
DETAIL D
BASEPLATE WITH PAIR OF LINDAPTERS
APPROX 750mm SPACING
SCALE 1 : 5
DETAIL C
LATERAL TIE BARS
SCALE 1 : 5
DETAIL E
CURVED BLADE LONGITUDINAL BASEPLATE
(BLADE BOX SIDE WALL HIDDEN)
SCALE 1 : 25
6
D
C
B
A
E
F
G
H
E
A
B
C
D
F
5
4
3
2
1
7
8
9
10
11
12
1
2
3
4
5
6
7
8
G
DO NOT SCALE DRAWING
DIMENSIONS ARE IN mm
LINEAR TOLERANCES:
X 0.5
X.X 0.15
X.XX 0.05
ANGULAR TOLERANCES:
X 0.5
X.X 0.2
INTERNAL RADII R0.3 MAX
INTERPRET GEOMETRIC
TOLERANCING PER: BS8888
MATERIAL
F NISH
SEE NOTES
SEE NOTES
DRAWN
CHECKED
ENG APPR.
COMMENTS:
DATE
NAME
TITLE:
SIZE
A2
DWG. NO.
REV
Wt CALC:
SCALE: 1 50
UNLESS OTHERWISE SPECIF ED:
JDG
BW
-
-
05/08/19
05/08/19
SHEET 2 OF 2
P7
TURNOUT GA - HS1
DOUGLAS TRAMWAY S & C
THIRD ANGLE PROJECTION
12
10
9
11
H
TRACK SYSTEMS UK LTD
ENGINEERING DEPT: SAREDON WORKS
MALTHOUSE LANE, GREAT SAREDON
SHARESH LL
WOLVERHAMPTON, UK
WV10 7LN
1918-HS1-01
UNLESS SPECIFIED OTHERWISE:
SPECIF ED DIMENSIONS ARE IN MILLIMETERS
LINEAR TOLERANCES:
X
±0.5
X.X ±015
X.XX ±0.05
ANGULAR TOLERANCES:
X ±0.5°
X.X ±0.2°
1.
2.
3.
DRAWN
CHECKED
RD
Project
Size A3
Drawing Number:
1918-HS1-01-500
RevP1
Sheet 1 OF 2
Registered Office:
Brewood Lodge, Weston Park, Weston Under Lizard, Telford TF11 8NA
0121 794 9855
Design Office:
Horton House, 8 Ditton Street, Ilminster TA19 0BQ
0121 794 9856
Works:
Malthouse Lane, Great Saredon, Nr Wolverhampton WV10 7LN
0121 794 9857
TRACK SYSTEMS UK Ltd.
www.track-systems-uk.co.uk
office@track-systems-uk.co.uk
design@track-systems-uk.co.uk
Title
APPROVED
Comments:
POINT MACHINE LAYOUT
Scale 1:100
1918 DBHT TURNOUT HS1
BW
11/10/19
14/10/19
Integration of point machine to be approved
by Hanning & Kahl.
ISO VIEW
DETAIL 1
SCALE 1:10
1
GENERAL NOTES:
BLADE TRAVEL AT TIP 60mm
SWITCH MACHINE
SCALE 1:10
785
450
230
111
25
335
622
672 (TO SUIT)
UNLESS SPECIFIED OTHERWISE:
SPECIF ED DIMENSIONS ARE IN MILLIMETERS
LINEAR TOLERANCES:
X
±0.5
X.X ±015
X.XX ±0.05
ANGULAR TOLERANCES:
X ±0.5°
X.X ±0.2°
1.
2.
3.
DRAWN
CHECKED
RD
Project
Size A3
Drawing Number:
1918-HS1-01-500
RevP1
Sheet 2 OF 2
Registered Office:
Brewood Lodge, Weston Park, Weston Under Lizard, Telford TF11 8NA
0121 794 9855
Design Office:
Horton House, 8 Ditton Street, Ilminster TA19 0BQ
0121 794 9856
Works:
Malthouse Lane, Great Saredon, Nr Wolverhampton WV10 7LN
0121 794 9857
TRACK SYSTEMS UK Ltd.
www.track-systems-uk.co.uk
office@track-systems-uk.co.uk
design@track-systems-uk.co.uk
Title
APPROVED
Comments:
POINT MACHINE LAYOUT
Scale 1:50
1918 DBHT TURNOUT HS1
BW
11/10/19
14/10/19
Integration of point machine to be approved
by Hanning & Kahl.
SECTION B-B
SCALE 1:20
103,6
14,5
B
B
A
A
SECTION A-A
SCALE 1:20
75
100
230
400 TO BLADE TIP
692
692
622
642
C
C
SECTION C-C
SCALE 1:20
47
41
23
494
21
68
325
193
DRAWN
CHECKED
RD
25/10/2021
Project
Size A2
Drawing Number:
2123-01-01
Rev A
Sheet 1 OF 2
Registered Office:
Brewood Lodge, Weston Park, Weston Under Lizard, Telford TF11 8NA
0121 794 9855
Design Office:
Horton House, 8 Ditton Street, Ilminster TA19 0BQ
0121 794 9856
Works:
Malthouse Lane, Great Saredon, Nr Wolverhampton WV10 7LN
0121 794 9857
TRACK SYSTEMS UK Ltd.
www.track-systems-uk.co.uk
office@track-systems-uk.co.uk
design@track-systems-uk.co.uk
Title
APPROVED
Comments:
HS2 GENERAL ARRANGEMENT
NOT TO SCALE
IoM DBHT - TURNOUT MODIFICATIONS
Client
AULDYN CONSTRUCTION Ltd.
GENERAL NOTES:
ALL UNITS MILLIMETRES mm U.N.O.
SWITCH TOE OPENING 45mm
MINIMUM SWITCH HEEL OPENING 26mm
REMOVEABLE FALSE FLOOR WITHIN BLADE BOX
BLADE BOX DESIGN TO SUIT INTEGRATION WITH HANNING & KAHL SWITCH MACHINE HW500 O-Z, SEE DRAWING
D00304183
CONNECTION BETWEEN BLADES AND SWITCH MACHINE TO BE FINALISED
BLADE BOX DRAINAGE ARRANGEMENT TO BE FINALISED
1.
2.
3.
4.
5.
6.
7.
DETAIL ON BLADES
PARTIAL SECTION ON STRAIGHT STOCK RAIL & BLADE
NEW SOLID HEEL BLOCK
FLUSH WITH RAIL TOP
COVER PLATE - EXISTING HEEL BLOCK
BLADE FROM 60 x 60mm BAR
HANNING & KAHL SWITCH MACHINE - HW500 O-Z
LID TO SUIT OPEN BLADE POSITION
FALSE FLOOR
BLADE BOX TOP FLANGE
MAINTAINS GUTTER CLEARANCE
WITH BLADES IN CLOSED POS.
CURVED CUT ON STRAIGHT STOCK RAIL
TO FOLLOW BLADE BACK IN CLOSED POS.
SLIDE CHAIRS FITTED TO FALSE FLOOR
SWITCH MACHINE SEALING PLATE
BOLTED BETWEEN STOCK RAILS
RETAINED
GREY
MODIFIED
RED
BLADES
BLUE
25/10/21
CP
27/10/21
DE
DRAWN
CHECKED
RD
25/10/2021
Project
Size A2
Drawing Number:
2123-01-01
Rev A
Sheet 2 OF 2
Registered Office:
Brewood Lodge,