The Peggy
| Authority | Manx National Heritage |
|---|---|
| Date received | 2021-10-29 |
| Outcome | Some information sent but not all held |
| Outcome date | 2021-11-24 |
| Case ID | 2059826 |
Summary
A request was made for a detailed cost breakdown regarding the removal of the vessel 'The Peggy' to a temporary home and the associated renovation and facility costs. Manx National Heritage disclosed specific expenditure items totaling over £445,000, covering removal, archaeological work, and the purchase and fit-out of Unit 9 Cooil Smithy Bus Park.
Key Facts
- The total cost for removing 'The Peggy' from the Nautical Museum and associated archaeological works was £100,645.07.
- The purchase price for Unit 9 Cooil Smithy Bus Park, the temporary home, was £345,000.00.
- Fit-out costs for the temporary home in 2013-14 totaled £57,873.00.
- Maintenance and utility costs for the temporary home in 2013-14 totaled £11,027.36.
- The response outcome was 'Some information sent but not all held'.
Data Disclosed
- £100,645.07
- £345,000.00
- £57,873.00
- £11,027.36
- 2011-12
- 2013-14
- 2014-15
- Unit 9 Cooil Smithy Bus Park
- £43,640.00
- £7,500.00
Original Request
Please let me have an itemised breakdown of - (a) the total cost of removing the "Peggy" from the Nautical Museum to her "temporary" home; and (b) the total costs to date shown on a yearly basis, including capital costs, of the temporary home; and (c) the total costs of materials for renovations carried out on the Peggy; and (d) the total costs of labour for work carried out in renovating the Peggy.
Data Tables (20)
| Laser scan of Peggy's hull | £ 7,500.00 | ||
|---|---|---|---|
| 2011-12 | Laser survey of Peggy | £ 7,900.00 |
| 2013-14 | Steel bar for Peggy project | £ 14.75 | |
|---|---|---|---|
| Bolts and steel plates | £ 120.83 | ||
| Fittings and hose | £ 24.64 | ||
| Provide Building Control drawings for new door opening | £ 300.00 |
| 15/04/2013 | Fender set for Peggy | £ 1,145.00 | |
|---|---|---|---|
| 16/04/2013 | Hydraulic lifting, Peggy | £ 3,152.88 | |
| Cradle | £ 4,865.00 | ||
| Design | £ 2,800.00 | ||
| Rails and 2nd ribs | £ 975.32 | ||
| 21/05/2013 | Cradle lift to yard | £ 1,200.00 | |
| 22/05/2013 | Steel slider for centre | £ 75.00 | |
| 29/05/2013 | Aggregate and cement | £ 40.00 | |
| Sundry Peggy Purchase orders to April 2013 - Materials etc. | £ 6,779.20 |
| 2014-15 | Clear & dispose of waste slate in NM service yard to enable archaeology | £ 1,625.00 | |
|---|---|---|---|
| Archaeological excavation and report | £ 43,640.00 | ||
| Excavate Dock | £ 10,619.25 | ||
| Create new opening and install door | £ 2,398.00 | ||
| Final week of excavation & associated costs | £ 2,240.00 |
| Cost | Sub-totals | ||
|---|---|---|---|
| Unit 9 Cooil Smithy Bus Park | Purchase of Unit 9 Cooil Smithy | £ 345,000.00 | £ 345,000.00 |
| Unit 9 Cooil Smithy Bus Park | Environmental monitoring/ control | £ 22,588.00 | |
|---|---|---|---|
| Unit 9 Cooil Smithy Bus Park | Building & M&E works as at 22/10/2015 | £ 33,700.00 | |
| Unit 9 Cooil Smithy Bus Park | Various | £ 1,585.00 | |
| sub-total | £ 57,873.00 |
| Goods/Services | Cost | Sub-totals | ||
|---|---|---|---|---|
| 2014-15 | Unit 9 Cooil Smithy Bus Park | telecom search fees on behalf of MMNT | £ 40.16 | |
| Unit 9 Cooil Smithy Bus Park | property search fees in respect of the new unit | £ 90.00 | ||
| Unit 9 Cooil Smithy Bus Park | structural engineering services regarding new unit | £ 2,500.00 | ||
| Unit 9 Cooil Smithy Bus Park | supply of cylinders for new unit Differ M1.14 | £ 94.32 | ||
| Unit 9 Cooil Smithy Bus Park | Broadband Business Lite with fixed IP address + 2 xDSL | £ 4 30.00 | ||
| Unit 9 Cooil Smithy Bus Park | Floor paint 4 off 25kg | £ 1,169.80 | ||
| Unit 9 Cooil Smithy Bus Park | Decorating materials for floor painting. | £ 50.16 | ||
| Unit 9 Cooil Smithy Bus Park | Various materials | £ 1 53.82 | ||
| Unit 9 Cooil Smithy Bus Park | insulation and treated timber | £ 7 52.00 | ||
| Unit 9 Cooil Smithy Bus Park | Install sub main and ring mains. | £ 1,145.00 | ||
| Unit 9 Cooil Smithy Bus Park | Hose fittings for humidifier. | £ 14.00 | ||
| Unit 9 Cooil Smithy Bus Park | Flexible hose, 150mm grills, 150mm cowl | £ 80.25 | ||
| Unit 9 Cooil Smithy Bus Park | Install intruder alarm system. | £ 1 ,680.97 | ||
| Unit 9 Cooil Smithy Bus Park | Install fire alarm system. | £ 2 ,073.97 | ||
| Unit 9 Cooil Smithy Bus Park | Hose fittings and prompt cement. | £ 34.12 | ||
| Unit 9 Cooil Smithy Bus Park | Install power supplies for fire and intruder alarms. | £ 1 39.00 | ||
| Unit 9 Cooil Smithy Bus Park | provision of electricity until e-billing & code set up | £ 1 00.00 | ||
| Unit 9 Cooil Smithy Bus Park | screws & Glue | £ 36.44 | ||
| Unit 9 Cooil Smithy Bus Park | nuts & washers | £ 19.92 | ||
| Unit 9 Cooil Smithy Bus Park | timber | £ 38.45 | ||
| Unit 9 Cooil Smithy Bus Park | washers | £ 6.10 | ||
| Unit 9 Cooil Smithy Bus Park | various - see credit note below | £ 2 47.88 | ||
| Unit 9 Cooil Smithy Bus Park | credit note - see invoice note above | -£ 1 08.00 | ||
| Unit 9 Cooil Smithy Bus Park | supply one domestic wheelie bin and disposal of waste | £ 1 00.00 | ||
| Unit 9 Cooil Smithy Bus Park | Install 3 double sockets and rcbo protection. | £ 1 39.00 | ||
| sub-total | £ 11,027.36 | |||
| 2015-16 | Unit 9 Cooil Smithy Bus Park | Install Intruder Alarm System | £ 2,227.12 | |
|---|---|---|---|---|
| Unit 9 Cooil Smithy Bus Park | Install fire alarm system | £ 2,268.96 | ||
| Unit 9 Cooil Smithy Bus Park | 2015/16 annual rates & waste charges (Commissioners) | £ 7 27.13 | ||
| Unit 9 Cooil Smithy Bus Park | stud & cladding as shown in drawing roller shutter door | £ 17,460.00 | ||
| Unit 9 Cooil Smithy Bus Park | 2015/16 annual electricity charges. | £ 36.72 | ||
| Unit 9 Cooil Smithy Bus Park | annual key holding 15/16 | £ 2 65.00 | ||
| Unit 9 Cooil Smithy Bus Park | Annual rates (Treasury) | £ 6 89.33 | ||
| Unit 9 Cooil Smithy Bus Park | For Reference Electricity Bills received by email | £ 2 39.43 | ||
| Unit 9 Cooil Smithy Bus Park | 3 x cans contractor expanding foam | £ 16.20 | ||
| Unit 9 Cooil Smithy Bus Park | Heatstore HS5810 hand dryer. | £ 3 58.00 | ||
| Unit 9 Cooil Smithy Bus Park | Hire of Genie platform | £ 4 15.00 | ||
| Unit 9 Cooil Smithy Bus Park | Construct toilet and staff room\kitchen | £ 6,120.00 | ||
| Unit 9 Cooil Smithy Bus Park | Inv 174 1st & 2nd fix new welfare area & lights mezz | £ 2,393.00 | ||
| Unit 9 Cooil Smithy Bus Park | Inv 178 7 x 200 watt high bay lights | £ 2,840.00 | ||
| Unit 9 Cooil Smithy Bus Park | Refuse collection | £ 63.33 | ||
| Unit 9 Cooil Smithy Bus Park | Electric heaters | £ 90.00 | ||
| Unit 9 Cooil Smithy Bus Park | structural Engineering services - inspect/report on unit development | £ 1,386.75 | ||
| Unit 9 Cooil Smithy Bus Park | MT search fees regarding property acquisition | £ 40.16 | ||
| Unit 9 Cooil Smithy Bus Park | annual maintenance fire panel | £ 1 95.00 | ||
| Unit 9 Cooil Smithy Bus Park | line charge & annual monitoring | £ 5 46.16 | ||
| Unit 9 Cooil Smithy Bus Park | Graphics repro | £ 5 40.00 | ||
| sub-total | £ 38,917.29 | |||
| 2016-17 | Unit 9 Cooil Smithy Bus Park | Rates 16/17 (Commissioners) | £ 6 93.31 | |
| Unit 9 Cooil Smithy Bus Park | Rates 16/17 (Treasury) | £ 1,408.33 | ||
| Unit 9 Cooil Smithy Bus Park | 16/17 annual waste disposal charges (Commissioners) | £ 97.60 | ||
| Unit 9 Cooil Smithy Bus Park | contribution to annual return fee (1 14th) | £ 27.14 | ||
| Unit 9 Cooil Smithy Bus Park | Installation of stud wall to first floor office. | £ 3,530.00 | ||
| Unit 9 Cooil Smithy Bus Park | Electricity - for reference - invoices received via email | £ 2 47.62 | ||
| Unit 9 Cooil Smithy Bus Park | annual key holding 16/17 | £ 2 70.00 | ||
| Unit 9 Cooil Smithy Bus Park | Patrol visits & Engineer call-outs | £ 70.00 | ||
| Unit 9 Cooil Smithy Bus Park | Call outs activations. | £ 35.00 | ||
| Unit 9 Cooil Smithy Bus Park | annual maintenance & monitoring of intruder alarm | £ 5 46.16 | ||
| Unit 9 Cooil Smithy Bus Park | annual maintenance of fire alarm | £ 1 95.00 | ||
| Unit 9 Cooil Smithy Bus Park | Asymmetric ladder | £ 3 35.00 | ||
| Unit 9 Cooil Smithy Bus Park | Building materials | £ 96.00 | ||
| Unit 9 Cooil Smithy Bus Park | Power drill & Timber | £ 2 25.00 | ||
| sub-total | £ 7,776.16 | |||
| Unit 9 Cooil Smithy Bus Park | 17/18 annual waste disposal charges (Commissioners) | £ 52.62 | ||
| Unit 9 Cooil Smithy Bus Park | alarm activation on 14/4/17 | £ 1 20.00 |
| Unit 9 Cooil Smithy Bus Park | Replace defective smoke detector. | £ 1 00.00 | ||
|---|---|---|---|---|
| Unit 9 Cooil Smithy Bus Park | 17/18 annual rates (Commissioners) | £ 7 06.80 | ||
| Unit 9 Cooil Smithy Bus Park | annual key holding 17/18 | £ 2 70.00 | ||
| Unit 9 Cooil Smithy Bus Park | Engineer attendance for intruder alarm | £ 2 95.00 | ||
| Unit 9 Cooil Smithy Bus Park | Storage boxes, pipe, trap, clips, elbows and saw. | £ 65.82 | ||
| Unit 9 Cooil Smithy Bus Park | Alarm activations during Sept & Oct 2017 | £ 55.00 | ||
| Unit 9 Cooil Smithy Bus Park | Replace lighting circuit mcb with C type. | £ 49.00 | ||
| Unit 9 Cooil Smithy Bus Park | 18/19 annual maintenance charges - fire | £ 1 95.00 | ||
| Unit 9 Cooil Smithy Bus Park | 18/19 annual maintenance charges - security | £ 2 61.16 | ||
| Unit 9 Cooil Smithy Bus Park | 18/19 CSL dualcom line charge rental | £ 2 85.00 | ||
| Unit 9 Cooil Smithy Bus Park | Fan heaters | £ 26.00 | ||
| Unit 9 Cooil Smithy Bus Park | Hose fitting for dehumidifiers | £ 30.00 | ||
| sub-total | £ 2,511.40 | |||
| 2018-19 | Unit 9 Cooil Smithy Bus Park | 18/19 annual rates (Commissioners) | £ 7 53.10 | |
| Unit 9 Cooil Smithy Bus Park | Electricity - For Reference Only - Invoices received by email | £ 2 81.30 | ||
| Unit 9 Cooil Smithy Bus Park | Contribution to annual company return. | £ 27.14 | ||
| Unit 9 Cooil Smithy Bus Park | Alarm activations and engineers time May & June | £ 40.00 | ||
| Unit 9 Cooil Smithy Bus Park | annual key holding 18/19 | £ 2 70.00 | ||
| Unit 9 Cooil Smithy Bus Park | Refuse collection charges Apr - Mar 19 & hire of bin (Commissioners) | £ 46.30 | ||
| Unit 9 Cooil Smithy Bus Park | Maintenance of fire alarm | £ 1 95.00 | ||
| Unit 9 Cooil Smithy Bus Park | Line charge and maint/monitoring intruder alarm | £ 5 46.16 | ||
| Unit 9 Cooil Smithy Bus Park | Engineer call out 20 Feb | £ 60.00 | ||
| Unit 9 Cooil Smithy Bus Park | Annual waste charges (Commissioners) | £ 1.21 | ||
| Unit 9 Cooil Smithy Bus Park | Graphics repro | £ 40.00 | ||
| Unit 9 Cooil Smithy Bus Park | Photographic floodlights | £ 2 00.00 | ||
| Unit 9 Cooil Smithy Bus Park | Lighting stands | £ 95.00 | ||
| Unit 9 Cooil Smithy Bus Park | Extension reel | £ 54.50 | ||
| £ 2,609.71 | ||||
| 2019-20 | Unit 9 Cooil Smithy Bus Park | Annual waste charges (Commissioners) | £ 46.08 | |
| Unit 9 Cooil Smithy Bus Park | Rates (Commissioners) | £ 7 17.82 | ||
| Unit 9 Cooil Smithy Bus Park | Call out 17/4 | £ 40.00 | ||
| Unit 9 Cooil Smithy Bus Park | Electricity - Invoices by email for recording purposes only | £ 5 01.02 | ||
| Unit 9 Cooil Smithy Bus Park | Annual keyholding | £ 2 70.00 | ||
| Unit 9 Cooil Smithy Bus Park | Share of annual return for management company | £ 27.14 | ||
| Unit 9 Cooil Smithy Bus Park | Lock cylinder M1.144 unit 10 | £ 87.30 | ||
| Unit 9 Cooil Smithy Bus Park | Call out re water ingress in equipment fire alarm | £ 5 26.51 | ||
| sub-total | £ 2,215.87 | |||
| 2020-21 | No costs | - | 0 |
| 2021-22 (to date) | Unit 9 Cooil Smithy Bus Park | Electricity - Invoices by email - for information | £ 2 75.67 | |
| Unit 9 Cooil Smithy Bus Park | Site visits and engineer Call outs | £ 40.00 | ||
| Unit 9 Cooil Smithy Bus Park | Annual waste & disposal charges to March 2021 (Commissioners) | £ 53.37 | ||
| Unit 9 Cooil Smithy Bus Park | Annual Rates - Confirmed as Charities Exempt (Commissioners) | £ - | ||
| Unit 9 Cooil Smithy Bus Park | Annual key holding | £ 2 80.00 | ||
| sub-total | £ 649.04 | |||
| Total maintenance | £ 65,706.83 |
| Item | Cost | |
|---|---|---|
| Computer for 3D work | £ 2 ,529.82 | |
| Photoscan Pro Licence | £ 2,320.00 |
| Item | Cost | ||
|---|---|---|---|
| Preliminary studies | |||
| Peggy Conservation Report | £ 3 ,500.00 | ||
| Peggy preliminary paint survey | £ 1,690.00 |
| Analysis of timber: characterisation of species and decay | £ 4,230.00 | |
|---|---|---|
| 3D survey inside and out + components | £ 5,250.00 | |
| Visit 03/2016 | £ 2,500.00 | |
| Peggy final paint survey | £ 2,767.78 |
Full Response Text
2059826 - Peggy costs
Item
Cost
Preliminary Studies
Laser scan of Peggy's hull
7,500.00
£
2011-12
Laser survey of Peggy
7,900.00
£
Nautical Museum works
Steel bar for Peggy project
14.75
£
Bolts and steel plates
120.83
£
Fittings and hose
24.64
£
Provide Building Control drawings for new door opening
300.00
£
New Cradle costs
15/04/2013 Fender set for Peggy
1,145.00
£
16/04/2013 Hydraulic lifting, Peggy
3,152.88
£
Cradle
4,865.00
£
Design
2,800.00
£
Rails and 2nd ribs
975.32
£
21/05/2013 Cradle lift to yard
1,200.00
£
22/05/2013 Steel slider for centre
75.00
£
29/05/2013 Aggregate and cement
40.00
£
Sundry Peggy Purchase orders to April 2013 - Materials etc.
6,779.20
£
Peggy lift and transport
Scaffold, Crane and transport
3,230.20
£
Archeological works, etc.
Clear & dispose of waste slate in NM service yard to enable archaeology
1,625.00
£
Archaeological excavation and report
43,640.00
£
Excavate Dock
10,619.25
£
Create new opening and install door
2,398.00
£
Final week of excavation & associated costs
2,240.00
£
TOTAL
100,645.07
£
(a) Costs of removing Peggy from Nautical Museum to temporary home
2013-14
2014-15
1
2059826 Peggy costs
Initial Purchase
Cost
Sub-totals
Unit 9 Cooil Smithy Bus Park
Purchase of Unit 9 Cooil Smithy
345,000.00
£
345,000.00
£
Site
Goods/Services
Cost
Fit out of Unit 9
Unit 9 Cooil Smithy Bus Park
Environmental monitoring/ control
22,588.00
£
Unit 9 Cooil Smithy Bus Park
Building & M&E works as at 22/10/2015
33,700.00
£
Unit 9 Cooil Smithy Bus Park
Various
1,585.00
£
sub-total
57,873.00
£
Maintenance
Site
Goods/Services
Cost
Sub-totals
Unit 9 Cooil Smithy Bus Park
telecom search fees on behalf of MMNT
40.16
£
Unit 9 Cooil Smithy Bus Park
property search fees in respect of the new unit
90.00
£
Unit 9 Cooil Smithy Bus Park
structural engineering services regarding new unit
2,500.00
£
Unit 9 Cooil Smithy Bus Park
supply of cylinders for new unit Differ M1.14
94.32
£
Unit 9 Cooil Smithy Bus Park
Broadband Business Lite with fixed IP address + 2 xDSL
430.00
£
Unit 9 Cooil Smithy Bus Park
Floor paint 4 off 25kg
1,169.80
£
Unit 9 Cooil Smithy Bus Park
Decorating materials for floor painting.
50.16
£
Unit 9 Cooil Smithy Bus Park
Various materials
153.82
£
Unit 9 Cooil Smithy Bus Park
insulation and treated timber
752.00
£
Unit 9 Cooil Smithy Bus Park
Install sub main and ring mains.
1,145.00
£
Unit 9 Cooil Smithy Bus Park
Hose fittings for humidifier.
14.00
£
Unit 9 Cooil Smithy Bus Park
Flexible hose, 150mm grills, 150mm cowl
80.25
£
Unit 9 Cooil Smithy Bus Park
Install intruder alarm system.
1,680.97
£
Unit 9 Cooil Smithy Bus Park
Install fire alarm system.
2,073.97
£
Unit 9 Cooil Smithy Bus Park
Hose fittings and prompt cement.
34.12
£
Unit 9 Cooil Smithy Bus Park
Install power supplies for fire and intruder alarms.
139.00
£
Unit 9 Cooil Smithy Bus Park
provision of electricity until e-billing & code set up
100.00
£
Unit 9 Cooil Smithy Bus Park
screws & Glue
36.44
£
Unit 9 Cooil Smithy Bus Park
nuts & washers
19.92
£
Unit 9 Cooil Smithy Bus Park
timber
38.45
£
Unit 9 Cooil Smithy Bus Park
washers
6.10
£
Unit 9 Cooil Smithy Bus Park
various - see credit note below
247.88
£
Unit 9 Cooil Smithy Bus Park
credit note - see invoice note above
108.00
-£
Unit 9 Cooil Smithy Bus Park
supply one domestic wheelie bin and disposal of waste
100.00
£
Unit 9 Cooil Smithy Bus Park
Install 3 double sockets and rcbo protection.
139.00
£
sub-total
11,027.36
£
(b) Costs of temporary home for Peggy
2014-15
2
2059826 Peggy costs
Unit 9 Cooil Smithy Bus Park
Install Intruder Alarm System
2,227.12
£
Unit 9 Cooil Smithy Bus Park
Install fire alarm system
2,268.96
£
Unit 9 Cooil Smithy Bus Park
2015/16 annual rates & waste charges (Commissioners)
727.13
£
Unit 9 Cooil Smithy Bus Park
stud & cladding as shown in drawing roller shutter door
17,460.00
£
Unit 9 Cooil Smithy Bus Park
2015/16 annual electricity charges.
36.72
£
Unit 9 Cooil Smithy Bus Park
annual key holding 15/16
265.00
£
Unit 9 Cooil Smithy Bus Park
Annual rates (Treasury)
689.33
£
Unit 9 Cooil Smithy Bus Park
For Reference Electricity Bills received by email
239.43
£
Unit 9 Cooil Smithy Bus Park
3 x cans contractor expanding foam
16.20
£
Unit 9 Cooil Smithy Bus Park
Heatstore HS5810 hand dryer.
358.00
£
Unit 9 Cooil Smithy Bus Park
Hire of Genie platform
415.00
£
Unit 9 Cooil Smithy Bus Park
Construct toilet and staff room\kitchen
6,120.00
£
Unit 9 Cooil Smithy Bus Park
Inv 174 1st & 2nd fix new welfare area & lights mezz
2,393.00
£
Unit 9 Cooil Smithy Bus Park
Inv 178 7 x 200 watt high bay lights
2,840.00
£
Unit 9 Cooil Smithy Bus Park
Refuse collection
63.33
£
Unit 9 Cooil Smithy Bus Park
Electric heaters
90.00
£
Unit 9 Cooil Smithy Bus Park
structural Engineering services - inspect/report on unit development
1,386.75
£
Unit 9 Cooil Smithy Bus Park
MT search fees regarding property acquisition
40.16
£
Unit 9 Cooil Smithy Bus Park
annual maintenance fire panel
195.00
£
Unit 9 Cooil Smithy Bus Park
line charge & annual monitoring
546.16
£
Unit 9 Cooil Smithy Bus Park
Graphics repro
540.00
£
sub-total
38,917.29
£
Unit 9 Cooil Smithy Bus Park
Rates 16/17 (Commissioners)
693.31
£
Unit 9 Cooil Smithy Bus Park
Rates 16/17 (Treasury)
1,408.33
£
Unit 9 Cooil Smithy Bus Park
16/17 annual waste disposal charges (Commissioners)
97.60
£
Unit 9 Cooil Smithy Bus Park
contribution to annual return fee (1 14th)
27.14
£
Unit 9 Cooil Smithy Bus Park
Installation of stud wall to first floor office.
3,530.00
£
Unit 9 Cooil Smithy Bus Park
Electricity - for reference - invoices received via email
247.62
£
Unit 9 Cooil Smithy Bus Park
annual key holding 16/17
270.00
£
Unit 9 Cooil Smithy Bus Park
Patrol visits & Engineer call-outs
70.00
£
Unit 9 Cooil Smithy Bus Park
Call outs activations.
35.00
£
Unit 9 Cooil Smithy Bus Park
annual maintenance & monitoring of intruder alarm
546.16
£
Unit 9 Cooil Smithy Bus Park
annual maintenance of fire alarm
195.00
£
Unit 9 Cooil Smithy Bus Park
Asymmetric ladder
335.00
£
Unit 9 Cooil Smithy Bus Park
Building materials
96.00
£
Unit 9 Cooil Smithy Bus Park
Power drill & Timber
225.00
£
sub-total
7,776.16
£
Unit 9 Cooil Smithy Bus Park
17/18 annual waste disposal charges (Commissioners)
52.62
£
Unit 9 Cooil Smithy Bus Park
alarm activation on 14/4/17
120.00
£
2015-16
2016-17
3
2059826 Peggy costs
Unit 9 Cooil Smithy Bus Park
Replace defective smoke detector.
100.00
£
Unit 9 Cooil Smithy Bus Park
17/18 annual rates (Commissioners)
706.80
£
Unit 9 Cooil Smithy Bus Park
annual key holding 17/18
270.00
£
Unit 9 Cooil Smithy Bus Park
Engineer attendance for intruder alarm
295.00
£
Unit 9 Cooil Smithy Bus Park
Storage boxes, pipe, trap, clips, elbows and saw.
65.82
£
Unit 9 Cooil Smithy Bus Park
Alarm activations during Sept & Oct 2017
55.00
£
Unit 9 Cooil Smithy Bus Park
Replace lighting circuit mcb with C type.
49.00
£
Unit 9 Cooil Smithy Bus Park
18/19 annual maintenance charges - fire
195.00
£
Unit 9 Cooil Smithy Bus Park
18/19 annual maintenance charges - security
261.16
£
Unit 9 Cooil Smithy Bus Park
18/19 CSL dualcom line charge rental
285.00
£
Unit 9 Cooil Smithy Bus Park
Fan heaters
26.00
£
Unit 9 Cooil Smithy Bus Park
Hose fitting for dehumidifiers
30.00
£
sub-total
2,511.40
£
Unit 9 Cooil Smithy Bus Park
18/19 annual rates (Commissioners)
753.10
£
Unit 9 Cooil Smithy Bus Park
Electricity - For Reference Only - Invoices received by email
281.30
£
Unit 9 Cooil Smithy Bus Park
Contribution to annual company return.
27.14
£
Unit 9 Cooil Smithy Bus Park
Alarm activations and engineers time May & June
40.00
£
Unit 9 Cooil Smithy Bus Park
annual key holding 18/19
270.00
£
Unit 9 Cooil Smithy Bus Park
Refuse collection charges Apr - Mar 19 & hire of bin (Commissioners)
46.30
£
Unit 9 Cooil Smithy Bus Park
Maintenance of fire alarm
195.00
£
Unit 9 Cooil Smithy Bus Park
Line charge and maint/monitoring intruder alarm
546.16
£
Unit 9 Cooil Smithy Bus Park
Engineer call out 20 Feb
60.00
£
Unit 9 Cooil Smithy Bus Park
Annual waste charges (Commissioners)
1.21
£
Unit 9 Cooil Smithy Bus Park
Graphics repro
40.00
£
Unit 9 Cooil Smithy Bus Park
Photographic floodlights
200.00
£
Unit 9 Cooil Smithy Bus Park
Lighting stands
95.00
£
Unit 9 Cooil Smithy Bus Park
Extension reel
54.50
£
2,609.71
£
Unit 9 Cooil Smithy Bus Park
Annual waste charges (Commissioners)
46.08
£
Unit 9 Cooil Smithy Bus Park
Rates (Commissioners)
717.82
£
Unit 9 Cooil Smithy Bus Park
Call out 17/4
40.00
£
Unit 9 Cooil Smithy Bus Park
Electricity - Invoices by email for recording purposes only
501.02
£
Unit 9 Cooil Smithy Bus Park
Annual keyholding
270.00
£
Unit 9 Cooil Smithy Bus Park
Share of annual return for management company
27.14
£
Unit 9 Cooil Smithy Bus Park
Lock cylinder M1.144 unit 10
87.30
£
Unit 9 Cooil Smithy Bus Park
Call out re water ingress in equipment fire alarm
526.51
£
sub-total
2,215.87
£
2020-21
No costs
-
0
2019-20
2018-19
2017-18
4
2059826 Peggy costs
Unit 9 Cooil Smithy Bus Park
Electricity - Invoices by email - for information
275.67
£
Unit 9 Cooil Smithy Bus Park
Site visits and engineer Call outs
40.00
£
Unit 9 Cooil Smithy Bus Park
Annual waste & disposal charges to March 2021 (Commissioners)
53.37
£
Unit 9 Cooil Smithy Bus Park
Annual Rates - Confirmed as Charities Exempt (Commissioners)
-
£
Unit 9 Cooil Smithy Bus Park
Annual key holding
280.00
£
sub-total
649.04
£
Total maintenance
65,706.83
£
GRAND TOTAL
468,579.83
£
2021-22 (to date)
5
Item
Cost
Computer for 3D work
2,529.82
£
Photoscan Pro Licence
2,320.00
£
TOTAL
4,849.82
£
(c) Costs of materials for renovations carried out on Peggy
6
Item
Cost
Peggy Conservation Report
3,500.00
£
Peggy preliminary paint survey
1,690.00
£
Analysis of timber: characterisation of species and decay
4,230.00
£
3D survey inside and out + components
5,250.00
£
Visit 03/2016
2,500.00
£
Peggy final paint survey
2,767.78
£
TOTAL
19,937.78
£
Preliminary studies
Infrastructure and consultancy on Peggy 2015-16
(d) Costs of labour for work carried out in renovating Peggy
7
Our ref: 2059826 24 November 2021
Dear ###
We write further to your request which was received on 29 October 2021 and which states:
"Please let me have an itemised breakdown of - (a) the total cost of removing the "Peggy" from the Nautical Museum to her "temporary" home; and (b) the total costs to date shown on a yearly basis, including capital costs, of the temporary home; and (c) the total costs of materials for renovations carried out on the Peggy; and (d) the total costs of labour for work carried out in renovating the Peggy."
While our aim is to provide information whenever possible, in this instance the public authority does not hold or cannot, after taking reasonable steps to do so, find some of the information that you have requested. Manx National Heritage does not record hours of labour of members of staff carrying out specific tasks and therefore does not hold the total costs of labour requested in part (d). The costs of services provided by third parties include labour, detailed as enclosed. I have enclosed copies of the information that is held.
Please quote the reference number 2059826 in any future communications.
Your right to request a review
If you are unhappy with this response to your freedom of information request, you may ask us to carry out an internal review of the response, by completing a complaint form and submitting it electronically or by delivery/post.
An electronic version of our complaint form can be found by going to our website at https://services.gov.im/freedom-of-information/Review . If you would like a paper version of our complaint form to be sent to you by post, please contact me and I will be happy to arrange for this. Your review request should explain why you are dissatisfied with this response, and should be made as soon as practicable. We will respond as soon as the review has been concluded.
If you are not satisfied with the result of the review, you then have the right to appeal
to the Information Commissioner for a decision on;
1. Whether we have responded to your request for information in accordance with
Part 2 of the Freedom of Information Act 2015; or
2. Whether we are justified in refusing to give you the information requested.
In response to an application for review, the Information Commissioner may, at any
time, attempt t
[Response truncated — full text is 15,564 characters]