Ballabeg 'red' crossings.

AuthorityDepartment of Infrastructure
Date received2021-10-25
OutcomeSome information sent but part exempt
Outcome date2021-11-17
Case ID2049966

Summary

A request was made for details regarding the design, approval, costs, and legal status of red crossings in Ballabeg, citing public interest due to recent court findings. The Department of Infrastructure released a traffic management report by JMP Consultants Ltd but withheld specific information on costs and individual names under partial exemption.

Key Facts

  • The designer of the Ballabeg route study was JMP Consultants Ltd.
  • The report covers the A7 Ballabeg route study under Job No. SCT4143.
  • The report was prepared by S Phillips and verified by K Clarke.
  • The final report status was issued on 25/05/2016 and 10/06/2016.
  • The response outcome was 'Some information sent but part exempt'.

Data Disclosed

  • 2021-10-25
  • 2021-11-17
  • 48
  • 2
  • SCT4143
  • 25/05/2016
  • 10/06/2016
  • 30mph
  • A7

Original Request

Please provide the name of the designer of the red crossing outside of Ballabeg hall. Please provide the designer of the red crossing and raised platform opposite the entrance to Friary Park. Please provide any BS standards followed in the construction and any legal status that the red lines have. Please provide the definition of the crossings in the IOM Highway Code. Please provide the name of the officer who approved the design and construction. Please provide the total costs to date. This is in the public interest given the recent court findings in the case of the 'Celtic motif' at St. John's.

Data Tables (17)

Location Ave Daily Traffic AM Peak PM Peak
1. Adjacent to Castle View
2. Adjacent to Friary Cottages
3. Adjacent to Arbory Parish Hall
4. Adjacent to Arbory School
Location Northbound / Westbound Southbound / Eastbound
1. Adjacent to Castle View
2. Adjacent to Friary Cottages
3. Adjacent to Arbory Parish Hall
4. Adjacent to Arbory School
Year Fatal Serious Slight Damage Only Total KSI Severity Ratio
2011
2012
2013
2014
2015
Option Description Benefit
1
2
3
4 4
Option Location Method Benefit Existing Examples (where applicable)
1
2
3
4
D20N01m0m10 w (1idme )mark 1m gap, End of existing footway SPTropOosPed new over run area Transition zone Dropped Kerbs Csapnoedne sCdido D l Ra eilmb i s r a e y ci ps t 1 h t lh oo 0 a a o n 6 c n4 w e 5 gA0 n i e 3 7nm x 0 gb i p s m eeh t t i RRax D p n w w R siee h g s N e i e t mp t s h e rd i 3 nlh 6 o a no 0y go T 7 a c v e Bw 0 m de ee5 l x a l n 0 p m o ee t 3 l u l hw xxma 0 ar ii b s s re s b p m k e i tt ga hii iF ngn n p nc l gg g h e k x i 33 gn 00 S ag t c mm eb r wo e pp a e a hh r d y d ss s iigg ig nn n 30 Dsiigan 6 t7o0 r e5m0 ami Dw np Ni h th W s 6 y p 7 h e e 0 it l e l eDs o d i 3 ig w pa 0 l n a i m b 6 i m t n a 7o itt pc 0 r h kh e5a i n m g 0t g c a amh tb i e n ep ow dh a a b r s yd up s ield ig e n odu litmit Drop P pe ro d p R K o e e s m e rb d o s D v n s e e tNo w e p1 x b 0l i i s u n2 t i e2 i l n d 2 g (w0 c 0it e hm n cm tr4 o e . nw 3l t i5 ii n dn e eu)ous 2 E 5 .0 n .0 0 d 0 of S e T x O is P 1D ti 0 n N0 g m 1 fo 0m 7 2 o 0 . . 1 0 t 4w w 4 0 i( a d4 y em) P m ro a p rk o s 2 e m d g n a e p w buildRFreiamryo vPea erkxisting lining on Dia 1065 30 mph road marking Red Texture Flex Screed DwNith 6 y7e0l l o3w0 bmapchk ignagt ebwoaaryd sign 30 WhiDtweN itph a6 yi7ne0tl lh o3aw0tc bmhaepcdhk ibgnuagit ledbw ooaaurytd sign Dia 670 50 mph speed limit sign to remain DN 670 30 mph gateway sign with yellow backing board White paint hatched build out Replace existing 30 mph sign Dia 670 50 mph speed limit as shown sign to remain 3 0 Red Texture Flex Screed Dia 1065 30 mph road marking DN 670 30 mph gateway sign with yellow backing board RReemplaocvee eexxiissttiinngg 3300 mmpphh ssiiggnn as shown Consider changing existing 50 mph speed limit on A7 between Ballabeg and Colby to 40 mph D20N01m0m10 w (1idme )mark 1m gap, End of existing footway SPTropOosPed new over run area Transition zone Dropped Kerbs Csapnoedne sCdido D l Ra eilmb i s r a e y ci ps t 1 h t lh oo 0 a a o n 6 c n4 w e 5 gA0 n i e 3 7nm x 0 gb i p s m eeh t t i RRax D p n w w R siee h g s N e i e t mp t s h e rd i 3 nlh 6 o a no 0y go T 7 a c v e Bw 0 m de ee5 l x a l n 0 p m o ee t 3 l u l hw xxma 0 ar ii b s s re s b p m k e i tt ga hii iF ngn n p nc l gg g h e k x i 33 gn 00 S ag t c mm eb r wo e pp a e a hh r d y d ss s iigg ig nn n 30 Dsiigan 6 t7o0 r e5m0 ami Dw np Ni h th W s 6 y p 7 h e e 0 it l e l eDs o d i 3 ig w pa 0 l n a i m b 6 i m t n a 7o itt pc 0 r h kh e5a i n m g 0t g c a amh tb i e n ep ow dh a a b r s yd up s ield ig e n odu litmit Drop P pe ro d p R K o e e s m e rb d o s D v n s e e tNo w e p1 x b 0l i i s u n2 t i e2 i l n d 2 g (w0 c 0it e hm n cm tr4 o e . nw 3l t i5 ii n dn e eu)ous 2 E 5 .0 n .0 0 d 0 of S e T x O is P 1D ti 0 n N0 g m 1 fo 0m 7 2 o 0 . . 1 0 t 4w w 4 0 i( a d4 y em) P m ro a p rk o s 2 e m d g n a e p w buildRFreiamryo vPea erkxisting lining on Dia 1065 30 mph road marking Red Texture Flex Screed DwNith 6 y7e0l l o3w0 bmapchk ignagt ebwoaaryd sign 30 WhiDtweN itph a6 yi7ne0tl lh o3aw0tc bmhaepcdhk ibgnuagit ledbw ooaaurytd sign Notes: 1. All dimensions in metres unless otherwise stated. 2. Do not scale from this drawing Key: - Red Texture Flex Screed A May '16 Client comments DC SP KC
Rev. Date Revision details Drawn Checked Approved
© This drawing is the property of JMP Consultants Limited and the information can only be reproduced with their prior permission.
250 West George Street, Glasgow, G2 4QY T 0141 221 4030 F 0800 066 4367 E scotland@jmp.co.uk W www.jmp.co.uk
Client Isle of Man Government Highway Services
Project Provision of Consultancy Services
Title Traffic Management Ballabeg Route Option 1
Drawn DC Checked SP Approved KC
Original drg. size A2 Date Apr '16 Scale 1:500
Drawing Status Information Drawing Number SCT4143/I/TM/B/01A Rev. A
Re d T extu re Fle x S cre e d
mp h r
RReemplaocvee eexxiissttiinngg 3300 mmpphh ssiiggnn
as shown
D20N01m0m10 w (1idme )mark 1m gap, End of existing footway SPTropOosPed new over run area Transition zone Dropped Kerbs Csapnoedne sCdido D l Ra eilmb i s r a e y ci ps t 1 h t lh oo 0 a a o n 6 c n4 w e 5 gA0 n i e 3 7nm x 0 gb i p s m eeh t t i RRax D p n w w R siee h g s N e i e t mp t s h e rd i 3 nlh 6 o a no 0y go T 7 a c v e Bw 0 m de ee5 l x a l n 0 p m o ee t 3 l u l hw xxma 0 ar ii b s s re s b p m k e i tt ga hii iF ngn n p nc l gg g h e k x i 33 gn 00 S ag t c mm eb r wo e pp a e a hh r d y d ss s iigg ig nn n 30 Dsiigan 6 t7o0 r e5m0 ami Dw np Ni h th W s 6 y p 7 h e e 0 it l e l eDs o d i 3 ig w pa 0 l n a i m b 6 i m t n a 7o itt pc 0 r h kh e5a i n m g 0t g c a amh tb i e n ep ow dh a a b r s yd up s ield ig e n odu litmit Drop P pe ro d p R K o e e s m e rb d o s D v n s e e tNo w e p1 x b 0l i i s u n2 t i e2 i l n d 2 g (w0 c 0it e hm n cm tr4 o e . nw 3l t i5 ii n dn e eu)ous 2 E 5 .0 n .0 0 d 0 of S e T x O is P 1D ti 0 n N0 g m 1 fo 0m 7 2 o 0 . . 1 0 t 4w w 4 0 i( a d4 y em) P m ro a p rk o s 2 e m d g n a e p w buildRFreiamryo vPea erkxisting lining on Dia 1065 30 mph road marking Red Texture Flex Screed DwNith 6 y7e0l l o3w0 bmapchk ignagt ebwoaaryd sign 30 WhiDtweN itph a6 yi7ne0tl lh o3aw0tc bmhaepcdhk ibgnuagit ledbw ooaaurytd sign Red Texture Flex Screed Dia 1065 30 mph road marking 30 DN 670 30 mph gateway sign DN 670 30 mph gateway sign with yellow backing board with yellow backing board White paint hatched build out D20N01m0m10 w (1idme )mark 1m gap, End of existing footway SPTropOosPed new over run area Transition zone Dropped Kerbs Csapnoedne sCdido D l Ra eilmb i s r a e y ci ps t 1 h t lh oo 0 a a o n 6 c n4 w e 5 gA0 n i e 3 7nm x 0 gb i p s m eeh t t i RRax D p n w w R siee h g s N e i e t mp t s h e rd i 3 nlh 6 o a no 0y go T 7 a c v e Bw 0 m de ee5 l x a l n 0 p m o ee t 3 l u l hw xxma 0 ar ii b s s re s b p m k e i tt ga hii iF ngn n p nc l gg g h e k x i 33 gn 00 S ag t c mm eb r wo e pp a e a hh r d y d ss s iigg ig nn n 30 Dsiigan 6 t7o0 r e5m0 ami Dw np Ni h th W s 6 y p 7 h e e 0 it l e l eDs o d i 3 ig w pa 0 l n a i m b 6 i m t n a 7o itt pc 0 r h kh e5a i n m g 0t g c a amh tb i e n ep ow dh a a b r s yd up s ield ig e n odu litmit Drop P pe ro d p R K o e e s m e rb d o s D v n s e e tNo w e p1 x b 0l i i s u n2 t i e2 i l n d 2 g (w0 c 0it e hm n cm tr4 o e . nw 3l t i5 ii n dn e eu)ous 2 E 5 .0 n .0 0 d 0 of S e T x O is P 1D ti 0 n N0 g m 1 fo 0m 7 2 o 0 . . 1 0 t 4w w 4 0 i( a d4 y em) P m ro a p rk o s 2 e m d g n a e p w buildRFreiamryo vPea erkxisting lining on Dia 1065 30 mph road marking Red Texture Flex Screed DwNith 6 y7e0l l o3w0 bmapchk ignagt ebwoaaryd sign 30 WhiDtweN itph a6 yi7ne0tl lh o3aw0tc bmhaepcdhk ibgnuagit ledbw ooaaurytd sign Notes: 1. All dimensions in metres unless otherwise stated. 2. Do not scale from this drawing Key: - Red Texture Flex Screed B Jun '16 Client comments DC SP KC A May '16 Client comments DC SP KC
Rev. Date Revision details Drawn Checked Approved
© This drawing is the property of JMP Consultants Limited and the information can only be reproduced with their prior permission.
250 West George Street, Glasgow, G2 4QY T 0141 221 4030 F 0800 066 4367 E scotland@jmp.co.uk W www.jmp.co.uk Client Isle of Man Government Highway Services
Project Provision of Consultancy Services
Title Traffic Management Ballabeg Route Option 1
Drawn DC Checked SP Approved KC
Original drg. size A2 Date Apr '16 Scale 1:500
Drawing Status Information Drawing Number SCT4143/I/TM/B/01B Rev. B
D20N01m0m10 w (1idme )mark 1m gap, End of existing footway SPTropOosPed new over run area Transition zone Dropped Kerbs Csapnoedne sCdido D l Ra eilmb i s r a e y ci ps t 1 h t lh oo 0 a a o n 6 c n4 w e 5 gA0 n i e 3 7nm x 0 gb i p s m eeh t t i RRax D p n w w R siee h g s N e i e t mp t s h e rd i 3 nlh 6 o a no 0y go T 7 a c v e Bw 0 m de ee5 l x a l n 0 p m o ee t 3 l u l hw xxma 0 ar ii b s s re s b p m k e i tt ga hii iF ngn n p nc l gg g h e k x i 33 gn 00 S ag t c mm eb r wo e pp a e a hh r d y d ss s iigg ig nn n 30 Dsiigan 6 t7o0 r e5m0 ami Dw np Ni h th W s 6 y p 7 h e e 0 it l e l eDs o d i 3 ig w pa 0 l n a i m b 6 i m t n a 7o itt pc 0 r h kh e5a i n m g 0t g c a amh tb i e n ep ow dh a a b r s yd up s ield ig e n odu litmit Drop P pe ro d p R K o e e s m e rb d o s D v n s e e tNo w e p1 x b 0l i i s u n2 t i e2 i l n d 2 g (w0 c 0it e hm n cm tr4 o e . nw 3l t i5 ii n dn e eu)ous 2 E 5 .0 n .0 0 d 0 of S e T x O is P 1D ti 0 n N0 g m 1 fo 0m 7 2 o 0 . . 1 0 t 4w w 4 0 i( a d4 y em) P m ro a p rk o s 2 e m d g n a e p w buildRFreiamryo vPea erkxisting lining on Dia 1065 30 mph road marking Red Texture Flex Screed DwNith 6 y7e0l l o3w0 bmapchk ignagt ebwoaaryd sign 30 WhiDtweN itph a6 yi7ne0tl lh o3aw0tc bmhaepcdhk ibgnuagit ledbw ooaaurytd sign End of existing footway DN1010 (1m mark 1m gap, 200mm wide) Proposed new over run area POTS Dropped Kerbs Transition zone D20N01m0m10 w (1idme )mark 1m gap, End of existing footway SPTropOosPed new over run area Transition zone Dropped Kerbs Drop P pe ro d p R K o e e s m e rb d o s D v n s e e tNo w e p1 x b 0l i i s u n2 t i e2 i l n d 2 g (w0 c 0it e hm n cm tr4 o e . nw 3l t i5 ii n dn e eu)ous 2 E 5 .0 n .0 0 d 0 of S e T x O is P 1D ti 0 n N0 g m 1 fo 0m 2 o 0 . 0 t 4w w 0 i( a d4 y em) P m ro a p rk o s 2 e m d g n a e p w buildRFreiamryo vPea erkxisting lining on 7.14 Dia 1065 30 mph road marking Red Texture Flex Screed DwNith 6 y7e0l l o3w0 bmapchk ignagt ebwoaaryd sign 30 WhiDtweN itph a6 yi7ne0tl lh o3aw0tc bmhaepcdhk ibgnuagit ledbw ooaaurytd sign Notes: 1. All dimensions in metres unless otherwise stated. 2. Do not scale from this drawing Key: - Transition zone (Buff coloured screed) A May '16 Client comments DC SP KC Rev. Date Revision details Drawn Checked Approved © This drawing is the property of JMP Consultants Limited and the information can only be reproduced with their prior permission. 250 West George Street, Glasgow, G2 4QY T 0141 221 4030 F 0800 066 4367 E scotland@jmp.co.uk W www.jmp.co.uk Client Isle of Man Government Highway Services Project Provision of Consultancy Services Title Traffic Management Ballabeg Route Option 2 Drawn Checked Approved DC SP KC Original drg. size Date Scale A2 Apr '16 1:500 Drawing Status Drawing Number Rev. Information SCT4143/I/TM/B/02 A
Checked SP Approved KC
Date Apr '16 Scale 1:500
Drawing Number SCT4143/I/TM/B/02 Rev. A
D20N01m0m10 w (1idme )mark 1m gap, End of existing footway SPTropOosPed new over run area Transition zone Dropped Kerbs Csapnoedne sCdido D l Ra eilmb i s r a e y ci ps t 1 h t lh oo 0 a a o n 6 c n4 w e 5 gA0 n i e 3 7nm x 0 gb i p s m eeh t t i RRax D p n w w R siee h g s N e i e t mp t s h e rd i 3 nlh 6 o a no 0y go T 7 a c v e Bw 0 m de ee5 l x a l n 0 p m o ee t 3 l u l hw xxma 0 ar ii b s s re s b p m k e i tt ga hii iF ngn n p nc l gg g h e k x i 33 gn 00 S ag t c mm eb r wo e pp a e a hh r d y d ss s iigg ig nn n 30 Dsiigan 6 t7o0 r e5m0 ami Dw np Ni h th W s 6 y p 7 h e e 0 it l e l eDs o d i 3 ig w pa 0 l n a i m b 6 i m t n a 7o itt pc 0 r h kh e5a i n m g 0t g c a amh tb i e n ep ow dh a a b r s yd up s ield ig e n odu litmit Drop P pe ro d p R K o e e s m e rb d o s D v n s e e tNo w e p1 x b 0l i i s u n2 t i e2 i l n d 2 g (w0 c 0it e hm n cm tr4 o e . nw 3l t i5 ii n dn e eu)ous 2 E 5 .0 n .0 0 d 0 of S e T x O is P 1D ti 0 n N0 g m 1 fo 0m 7 2 o 0 . . 1 0 t 4w w 4 0 i( a d4 y em) P m ro a p rk o s 2 e m d g n a e p w buildRFreiamryo vPea erkxisting lining on Dia 1065 30 mph road marking Red Texture Flex Screed End of existing footway DwNith 6 y7e0l l o3w0 bmapchk ignagt ebwoaaryd sign 30 WhiDtweN itph a6 yi7ne0tl lh o3aw0tc bmhaepcdhk ibgnuagit ledbw ooaaurytd sign Dropped Kerbs DN 1004 (4m mark 2m gap 100mm wide) Proposed new build 2.00 4.35 Remove existing centre line Remove existing lining on Friary Park POTS Proposed new build 2.00 DN 1022 (with continuous stop line 200mm wide) 5.00 7.14 D20N01m0m10 w (1idme )mark 1m gap, End of existing footway SPTropOosPed new over run area Transition zone Dropped Kerbs Drop P pe ro d p R K o e e s m e rb d o s D v n s e e tNo w e p1 x b 0l i i s u n2 t i e2 i l n d 2 g (w0 c 0it e hm n cm tr4 o e . nw 3l t i5 ii n dn e eu)ous 2 E 5 .0 n .0 0 d 0 of S e T x O is P 1D ti 0 n N0 g m 1 fo 0m 2 o 0 . 0 t 4w w 0 i( a d4 y em) P m ro a p rk o s 2 e m d g n a e p w buildRFreiamryo vPea erkxisting lining on 7.14 Dia 1065 30 mph road marking Red Texture Flex Screed 30 Notes: 1. All dimensions in metres unless otherwise stated. 2. Do not scale from this drawing B Jun '16 Client comments DC SP KC A May '16 Client comments DC SP KC Rev. Date Revision details Drawn Checked Approved © This drawing is the property of JMP Consultants Limited and the information can only be reproduced with their prior permission. 250 West George Street, Glasgow, G2 4QY T 0141 221 4030 F 0800 066 4367 E scotland@jmp.co.uk W www.jmp.co.uk Client Isle of Man Government Highway Services Project Provision of Consultancy Services Title Traffic Management Ballabeg Route Option 3 Drawn Checked Approved DC SP KC Original drg. size Date Scale A2 Apr '16 1:500 Drawing Status Drawing Number Rev. Information SCT4341/I/TM/B/03 B
Checked SP Approved KC
Date Apr '16 Scale 1:500
Drawing Number SCT4341/I/TM/B/03 Rev. B

Full Response Text

Appendix 1

Isle of Man Consultancy Services - Traffic Management Work Package ROUTE STUDY - A7 BALLABEG Report JMP Consultants Ltd ii Isle of Man Consultancy Services - Traffic Management Work Package : SCT4143-1/2

Isle of Man Consultancy Services - Traffic Management Work Package ROUTE STUDY - A7 BALLABEG Report

JMP Consultants Ltd 250 West George Street Glasgow G2 4QY T 0141 221 4030 F 0800 066 4367 E glasgow@jmp.co.uk

www.jmp.co.uk forwardthinking@jmp.co.uk
facebook.com/jmp.consultants
twitter.com/#!/_jmp
linkedin.com/company/jmp consulting

Report Record Job No. Report No. Issue No. Prepared Verified Approved Status Date SCT4143 1 1 S Phillips

K Clarke Final 25/05/2016 SCT4143 1 2 S Phillips

K Clarke Final 10/06/2016

Contents Amendments Record Issue No. Revision description Approved Status
Date

JMP Consultants Ltd

Isle of Man Consultancy Services - Traffic Management Work Package : SCT4143-1/2 iii

Contents 1 INTRODUCTION 1 2 EXISTING CHARACTERISTICS 2 Introduction .................................................................................................................................................2 General Characteristics ..............................................................................................................................2 Existing Traffic Volumes .............................................................................................................................3 Existing Traffic Speeds ...............................................................................................................................4 Accident Data..............................................................................................................................................6 3 IDENTIFICATION OF PROBLEMS AND CONSTRAINTS 8 Summary...................................................................................................................................................23 4 OPTIONS 25 Option Benefits .........................................................................................................................................29 Summary...................................................................................................................................................30 Tables and Figures Figure 2.1 Extent of route ..........................................................................................................................................2 Table 2.1 A7 Traffic Volumes .....................................................................................................................................4 Table 2.2 A7 Traffic Speeds ......................................................................................................................................4 Figure 2.2 A7 Traffic Speeds (Northbound / Westbound) ..........................................................................................5 Figure 2.3 A7 Traffic Speeds (Southbound / Eastbound) ..........................................................................................5 Table 2.3 A7 Accident Statistics ................................................................................................................................6 Figure 2.4 A7 Accident Statistics ...............................................................................................................................6 Figure 2.5 A7 Ballabeg Accident Locations and Class ..............................................................................................7 Figure 3.1 30mph limit on approach to Ballabeg from the east .................................................................................8 Figure 3.2 30mph limit on approach to Ballabeg from the south ...............................................................................9 Figure 3.3 Obscured signage on the A7 approaching Ballabeg from the east ........................................................10 Figure 3.4 Existing signage on approach to Ballabeg from the west .......................................................................11 Figure 3.5 Existing signage on approach to Ballabeg from the south ......................................................................11 Figure 3.6 Existing rubber kerbing at Duck Street junction ......................................................................................12 JMP Consultants Ltd iv Isle of Man Consultancy Services - Traffic Management Work Package : SCT4143-1/2

Figure 3.7 New Road approach to junction with Duck Street ..................................................................................13 Figure 3.8 On-street parking on the A7 north of Duck Street ...................................................................................14 Figure 3.9 Visibility to the south of Friary Park ........................................................................................................15 Figure 3.10 Visibility to the north of Friary Park .......................................................................................................15 Figure 3.11 Road markings at the A7 Duck Street / New Road junction .................................................................16 Figure 3.12 Road markings at junction accessing Ballacubbon Close ....................................................................16 Figure 3.13 Lack of road markings adjacent to Arbory Parish Hall ..........................................................................17 Figure 3.14 Existing signage on the A7 northbound ................................................................................................17 Figure 3.15 Existing footway provision on Duck Street ............................................................................................18 Figure 3.16 Existing footway provision on A7 adjacent to Friary Park .....................................................................19 Figure 3.17 Footway provision on the A7 adjacent to cemetery ..............................................................................19 Figure 3.18 Termination of footway north of Friary Park ..........................................................................................20 Figure 3.19 Termination of footway at shelter and recycling area. ..........................................................................21 Figure 3.20 Existing bus stop opposite Vicarage Close ...........................................................................................22 Figure 3.21 Forward visibility on A7 .........................................................................................................................23 Table 3.1 A7 Ballabeg - SWOT Analysis .................................................................................................................24 Figure 4.1 Gateway feature approaching Ballabeg from the west ...........................................................................26 Figure 4.2 Gateway feature approaching Ballabeg on New Road from the south ...................................................27 Figure 4.3 Transition zone and overrun area ...........................................................................................................28 Figure 4.4 Extent and location of proposed build outs .............................................................................................29 Table 4.1 Option Benefits ........................................................................................................................................29 Appendices Appendix A Accident Locations Appendix B Preliminary Options Appendix C Recommended Options JMP Consultants Ltd

Isle of Man Consultancy Services - Traffic Management Work Package : SCT4143-1/2 1

1 Introduction 1.1 JMP Consultants Ltd (JMP) has been commissioned by the Isle of Man (IoM) Government Department of Infrastructure (DoI) to provide consultancy services. The services required by the DoI included a route study of the A7 through the village of Ballabeg. 1.2 At the request of the DoI, the route study undertaken for Ballabeg included the following actions:  Detailed site survey;  Safety review;  Identification and design of necessary improvements to reduce risk to road users and increase sense of place within identified village / settlement / residential areas; and  Outline scheme design drawing. 1.3 To inform the above, JMP undertook a detailed site survey of the above route on Tuesday 2nd February 2016. 1.4 This report discusses the findings of the detailed site surveys and opportunity for improvement where improvements are considered to be necessary. Notwithstanding the identification of problems specific to this route, this has been undertaken on the basis of a baseline SWOT analysis 1.5 In terms of developing improvement options, due cognisance has been given to the guidance set out in the following publications.  Designing Streets; The Scottish Government (2010);  Manual for Streets 2; CIHT (2010);  Manual for Streets; Department for Transport (2007);  TRL 641 ‘Psychological’ traffic calming; TRL (2005);  TRL 385 ‘Traffic calming in villages on major roads: Final report; TRL (1999);  LTN 1/11 Shared Space; Department for Transport (2011);  LTN 1/08 Traffic Management and Streetcape; Department for Transport (2008);  LTN 1/07 Traffic Calming; Department for Transport (2007);  TAL 1/04 Village Speed Limits; Department for Transport (2004);  TAL 12/97 Chicane Schemes; Department for Transport (1997); and  TAL 9/94 Horizontal Deflections; Department for Transport (1994).

2 Isle of Man Consultancy Services - Traffic Management Work Package : SCT4143-1/2

2 Existing Characteristics INTRODUCTION 2.1 This chapter of the report discusses the characteristics of the section of the A7 that routes through the village of Ballabeg. The extent of the route is indicated by Figure 2.1 below. Figure 2.1 Extent of route GENERAL CHARACTERISTICS 2.2 The A7 Main Road through the centre of Ballabeg is a lit single carriageway road connecting Ballasalla in the east to Port Erin in the west. The carriageway width of the A7 through the village of Ballabeg is generally around 7m. However, adjacent to Friary Cottages, the width reduces to around 6 to 6.5m. 2.3 The speed limit on the A7 approaching Ballabeg from the east (Duck Street) and west is derestricted and 50mph respectively. There is also a derestricted distributor road standard road link from the A5 approaching Ballabeg from the south (New Road / Ballakeigan Road) which appears to have priority over the A7 approach from the east. Within the existing village limits, the speed limit reduces to 30mph. 2.4 Within the village, Wig-Wag warning signals identify the extent of the ‘School Zone’ on the A7 adjacent to Arbory School. During school term time, these signals operate Monday to Friday between 08:20-09:15 and 15:10-16:30 further reducing the speed limit within this zone to 20mph.

JMP Consultants Ltd

Isle of Man Consultancy Services - Traffic Management Work Package : SCT4143-1/2 3

2.5 Notwithstanding private frontage access, there are a number of simple priority junctions on the A7 within the village of Ballabeg. These junctions are as follows:  A7 / Road Link from the A5;  A7 / Friary Park;  A7 / Road Link to Peel; and  A7 / Road Link to A27. 2.6 The A7 Duck Street and New Road approaches to Ballabeg form part of the Isle of Man Southern 100 course and is therefore affected by road closures when this event is on. Pedestrian Facilities 2.7 Within the village centre, a pedestrian footway is generally only provided on the west / south side of the A7 to the recycling area beyond which, it only continues on the north side of the A7 towards the school. Due to physical constraints imposed by existing adjacent property, the width of these footways varies. In general, the width of the existing footways is sub standard in terms of current design standards (i.e. less than 1.8m). Due to the aforementioned physical constraints, there is very little scope to widen these footways without impacting on the existing carriageway width. 2.8 There are no formal pedestrian crossing facilities on the A7 within the village of Ballabeg. Cycle Facilities 2.9 There are no formal cycle facilities on the A7 within the village centre and as discussed above, the existing footways are not of an appropriate standard to accommodate shared use with pedestrians. The Isle of Man Cycling Guide generally advocates cycling on ‘A’ class roads such as the A7 through the village. Public Transport 2.10 The A7 through the village of Ballabeg is on a bus route served by the Bus Vannin 1, 1A, 10, 11 and 12 services. The aforementioned bus services can be accessed from bus stops located on the A7 at a number of locations within the village. Some of these stops are provided with shelters. Parking 2.11 On-street parking is permitted on the A7 within the village however, only appears to occur on the southbound carriageway. Notwithstanding Vicarage Close, there are no existing waiting restrictions to control on-street parking. Although bar markings are provided across private accesses in the vicinity of the school, these are only advisory. EXISTING TRAFFIC VOLUMES 2.12 The DoI has provided traffic survey data for 4 locations on the A7 through Ballabeg. This data was collected between 16th and 23rd December 2015. The aforementioned locations and measured traffic volumes are summarised in Table 2.1 below.

4 Isle of Man Consultancy Services - Traffic Management Work Package : SCT4143-1/2

Table 2.1 A7 Traffic Volumes Location Ave Daily Traffic AM Peak PM Peak

NB/WB SB/EB Total NB/WB SB/EB Total NB/WB SB/EB Total 1. Adjacent to Castle View 1686 1548 3234 No peak hour data available 2. Adjacent to Friary Cottages 2150 2131 4281 3. Adjacent to Arbory Parish Hall 1910 1935 3845 4. Adjacent to Arbory School 1850 1877 3727 Source: Department of Infrastructure 2.13 As indicated above, traffic volumes on the A7 through Ballabeg range from around 3,200 to 4,300 vehicles per day. No peak hour data was available for the above locations however, the morning and evening peak hour flows are likely to represent around 10% of the daily volumes (i.e. 320 to 430 vehicles). This level of traffic does not present any link capacity issues. EXISTING TRAFFIC SPEEDS 2.14 The DoI has provided speed survey data for 4 locations on the A7 through Ballabeg. This data was collected between16th and 23rd December 2015. The aforement