A request was made for business cases, meeting minutes, and financial data regarding three specific school capital projects (CRHS, QEII Science/Technology, and QEII Sixth Form). The Treasury partially upheld the request, disclosing the December 2016 CRHS business case which includes a detailed suitability survey of the existing building.
Key Facts
The request covered capital projects for CRHS redevelopment and two new builds at QEII.
The outcome was 'Upheld - partial' on 2022-02-10.
The disclosed document is the CRHS Business Case dated December 2016.
The business case includes a suitability study assessing the impact of current spaces on teaching and behavior.
The study identified multiple rooms with door widths narrower than required by current legislation for wheelchair access.
Data Disclosed
2021-08-23
2022-02-10
December 2016
377 pages
11 documents
2018/2019
Room Ref A103
Room Ref A105
Room Ref A106
Room Ref A107
Room Ref A108
Room Ref A109
Room Ref A110
Room Ref A111
Room Ref A112
Room Ref A113
Room Ref A114
Room Ref A115
Room Ref A116
Room Ref A119
Room Ref A120
Original Request
1. In respect of the capital projects relating to CRHS redevelopment, the new Science and Technology build at QEII, and the sixth form build at QEII -
a. The original business case submitted by DESC to Treasury in respect of each project
b. A list of dates of when each of the projects was considered at either SACIC or the Treasury Board (if appropriate), including a short summary of what the reason for the project being considered by SACIC / the Treasury Board at that point in time, plus the associated minute.
c. Bids made, bids approved, funds allocated and actually spent in relation to each of the 3 projects.
2. Any other business case, financial or capital bid received by Treasury for the financial year 2018/2019 to date and for future years in respect of new school buildings and/or extensions.
Data Tables (103)
Spaces
Direct Impact on Education
H & S/
Security
Disabled
Access
Comments
Typ
Category
loohcS mooR
feR
tessA
mooR edoC
epahS/eziS
tnemnorivnE
noitacoL
erutinruF
dexiF
erutcurtsarfnI
TCI
A
B
C
D
hgiH
muideM
woL
seY
oN
Admin
corridor
A103
0
0
0
0
0
Storage of items awaiting pickup due to lack of storage.
Doors off to accommodation are narrower than required by current legislation.
General
office
A105
1
Awkward shape for furniture layout.
1
Cold in winter as door to reception is open due to restricted layout.
0
0
1
Lack of data and power sockets.
Storage of items awaiting pickup due to lack of storage.
Access doors are narrower than required by current legislation.
Office
A106
0
2
No direct daylight or natural ventilation.
0
0
0
Electronic door lock due to storage of sensitive information.
Access doors are narrower than required by current legislation.
Spaces
Direct Impact on Education
H & S/
Security
Disabled
Access
Comments
Typ
Category
loohcS mooR
feR
tessA
mooR edoC
epahS/eziS
tnemnorivnE
noitacoL
erutinruF
dexiF
erutcurtsarfnI
TCI
A
B
C
D
hgiH
muideM
woL
seY
oN
Male staff
toilet
A107
0
0
0
0
0
Disabled toilet provision adjacent.
Photo
copier
A108
1
Small room with inadequate space for materials and personnel.
1
Minimal mechanical ventilation. Hot in summer.
0
0
0
Congested space.
Access door is narrower than required by current legislation. No space to manoeuvre.
Store
A109
0
0
0
0
0
Narrow door width does not comply with current requirements for wheelchair access.
Spaces
Direct Impact on Education
H & S/
Security
Disabled
Access
Comments
Typ
Category
loohcS mooR
feR
tessA
mooR edoC
epahS/eziS
tnemnorivnE
noitacoL
erutinruF
dexiF
erutcurtsarfnI
TCI
A
B
C
D
hgiH
muideM
woL
seY
oN
Office
A110
0
0
0
0
0
Narrow door width does not comply with current requirements for wheelchair access.
Female
staff toilet
A111
0
0
0
0
0
Disabled toilet adjacent.
Deputy
Head’s
office
A112
0
0
0
0
0
Narrow door width does not comply with current requirements for wheelchair access.
Spaces
Direct Impact on Education
H & S/
Security
Disabled
Access
Comments
Typ
Category
loohcS mooR
feR
tessA
mooR edoC
epahS/eziS
tnemnorivnE
noitacoL
erutinruF
dexiF
erutcurtsarfnI
TCI
A
B
C
D
hgiH
muideM
woL
seY
oN
Disabled
toilet
A113
0
0
0
0
0
Narrow door width does not comply with current requirements for wheelchair access.
Deputy
Head’s
office
A114
0
0
0
0
0
Narrow door width does not comply with current requirements for wheelchair access.
Narrow door width does not comply with current requirements for wheelchair access.
Spaces
Direct Impact on Education
H & S/
Security
Disabled
Access
Comments
Typ
Category
loohcS mooR
feR
tessA
mooR edoC
epahS/eziS
tnemnorivnE
noitacoL
erutinruF
dexiF
erutcurtsarfnI
TCI
A
B
C
D
hgiH
muideM
woL
seY
oN
Office
A116
0
1
Area generally lacking heating.
2
No disabled access from main school accommodation.
0
0
Access door is narrower than required by current legislation. Access for wheelchair bound person
requires them to exit the school and re-enter adjacent to this room due to stairs in corridor from
admin area
Corridor
A119
0
0
2
No disabled access from main school accommodation.
0
0
No disabled access from within main school building.
Office
Listening
A120
0
0
2
No disabled access from main school accommodation.
0
0
Narrow door width does not comply with current requirements for wheelchair access.
Spaces
Direct Impact on Education
H & S/
Security
Disabled
Access
Comments
Typ
Category
loohcS mooR
feR
tessA
mooR edoC
epahS/eziS
tnemnorivnE
noitacoL
erutinruF
dexiF
erutcurtsarfnI
TCI
A
B
C
D
hgiH
muideM
woL
seY
oN
Toilet
A122
0
0
0
0
0
No disabled toilet provision on this level.
Medical
room
A124
0
1
Area generally lacking heating.
2
No disabled access to medical room without having to exit the main building and re-enter.
0
0
Access door is narrower than required by current legislation. Access for wheelchair bound person
requires them to exit the school and re-enter adjacent to this room due to stairs in corridor from
admin area.
Corridor
A125
0
0
0
0
0
Spaces
Direct Impact on Education
H & S/
Security
Disabled
Access
Comments
Typ
Category
loohcS mooR
feR
tessA
mooR edoC
epahS/eziS
tnemnorivnE
noitacoL
erutinruF
dexiF
erutcurtsarfnI
TCI
A
B
C
D
hgiH
muideM
woL
seY
oN
Staffroom
A127
1
Not sufficiently large to comfortably allow full staff meetings.
0
1
Remote from remainder of school. Not heavily utilised.
0
1
Lack of data and power outlets.
Narrow door width does not comply with current requirements for wheelchair access.
Stair
A(cid:1005)25
0
0
0
0
0
No disabled access to the upper floor meeting rooms.
Kitchen
A461
0
0
0
0
0
Narrow door width does not comply with current requirements for wheelchair access.
Spaces
Direct Impact on Education
H & S/
Security
Disabled
Access
Comments
Typ
Category
loohcS mooR
feR
tessA
mooR edoC
epahS/eziS
tnemnorivnE
noitacoL
erutinruF
dexiF
erutcurtsarfnI
TCI
A
B
C
D
hgiH
muideM
woL
seY
oN
Conference
room
A462a
0
?
2
No disabled access to this level.
0
?
No disabled access to this level.
Meeting
room
A426
0
?
2
No disabled access to this level.
0
?
No disabled access to this level.
Spaces
Direct Impact on Education
H & S/
Security
Disabled
Access
Comments
Type
Category
euqinU
mooR
feR
noitangiseD
mooR edoC
epahS/eziS
tnemnorivnE
noitacoL
erutinruF
dexiF
erutcurtsarfnI
TCI
A
B
C
D
hgiH
muideM
woL
seY
oN
Class 1
R151
2
Room size well below recommended standard class area (BB98)
1
Lighting poor.
0
2
Student lockers in classroom, reduce space, access difficulties, lack of use.
0
0
Lockers access and lack of space for disabled
Narrow door does not comply with current requirements.
Class 2
H304
1
Room area marginal.
0
0
0
0
Narrow door does not comply with current requirements.
Spaces
Direct Impact on Education
H & S/
Security
Disabled
Access
Comments
Type
Category
euqinU
mooR
feR
noitangiseD
mooR edoC
epahS/eziS
tnemnorivnE
noitacoL
erutinruF
dexiF
erutcurtsarfnI
TCI
A
B
C
D
hgiH
muideM
woL
seY
oN
Class 3
R161
2
Room size well below recommended standard class area (BB98)
0
0
2
Student lockers in classroom, reduce space, access difficulties, lack of use.
0
Lockers access and lack of space for disabled
Narrow door does not comply with current requirements.
Class 4
R163
1
Room area marginal.
0
0
2
Student lockers in classroom, reduce space, access difficulties, lack of use.
0
Lockers access and lack of space for disabled
Narrow door does not comply with current requirements.
Office
5
R167
0
0
0
0
0
Narrow door does not comply with current requirements.
Spaces
Direct Impact on Education
H & S/
Security
Disabled
Access
Comments
Type
Category
euqinU
mooR
feR
noitangiseD
mooR edoC
epahS/eziS
tnemnorivnE
noitacoL
erutinruF
dexiF
erutcurtsarfnI
TCI
A
B
C
D
hgiH
muideM
woL
seY
oN
Class 6
R181
2
Room size well below recommended standard class area (BB98)
0
0
2
Student lockers in classroom, reduce space, access difficulties, lack of use.
0
Lockers access and lack of space for disabled
Narrow door does not comply with current requirements.
Class 7
R183
1
Room area marginal.
0
0
2
Student lockers in classroom, reduce space, access difficulties, lack of use.
0
Lockers access and lack of space for disabled
Narrow door does not comply with current requirements.
Spaces
Direct Impact on Education
H & S/
Security
Disabled
Access
Comments
Type
Category
euqinU
mooR
feR
noitangiseD
mooR edoC
epahS/eziS
tnemnorivnE
noitacoL
erutinruF
dexiF
erutcurtsarfnI
TCI
A
B
C
D
hgiH
muideM
woL
seY
oN
Lab 1
L405
0/1
Room area marginal.
1
No blackout provision limits experiments. Mechanical vent.
2
At extreme end of ‘string’ of science labs, poor relationship to resources and Science staff facilities.
Lack of prep room.
1
Fixed furniture layout restricts flexibility and supervision.
Fume cupboards against wall limits visibility of experiments by students.
0
WIFI enabled
Single means of escape from room
Narrow door does not meet current requirements. Access by way of poor quality lift opening directly into Lab 2
Lan 1x
L407
0/1
Small group room.
0
2
At extreme end of ‘string’ of science labs, poor relationship to resources and Science staff facilities.
0
0
WIFI enabled
Single means of escape from room if used for experiments.
Narrow door does not meet current requirements. Access by way of poor quality lift opening directly into Lab 2
Spaces
Direct Impact on Education
H & S/
Security
Disabled
Access
Comments
Type
Category
feR
euqinU
mooR
noitangiseD
mooR edoC
epahS/eziS
tnemnorivnE
noitacoL
erutinruF
dexiF
erutcurtsarfnI
TCI
A
B
C
D
hgiH
muideM
woL
seY
oN
Lab 2
L406
0/1
Room area marginal.
1
No blackout provision limits experiments. No mechanical vent.
1
Poor relationship to Science staff facilities.
1
Fixed furniture layout restricts flexibility and supervision.
Fume cupboards against wall limits visibility of experiments by students.
0
WIFI enabled
Ramped floor at main access to lab. Second escape through chemical store/prep room.
Access by way of poor quality lift opening directly into Lab 2
Lab 2x
L404
0/1
Small group room set up as computer room.
1
Poor ventilation
1
Poor relationship to Science staff facilities.
0
0
Narrow door does not meet current requirements. Access by way of poor quality lift opening directly into Lab 2
Prep 2/3
L408
0
1
Poor ventilation
0
0
0
Lab 3 and 4 second means of escape is through the prep area, potentially impeded by furniture and equipment.
Narrow door does not meet current requirements. Access by way of poor quality lift opening directly into Lab 2
Spaces
Direct Impact on Education
H & S/
Security
Disabled
Access
Comments
Type
Category
feR
euqinU
mooR
noitangiseD
mooR edoC
epahS/eziS
tnemnorivnE
noitacoL
erutinruF
dexiF
erutcurtsarfnI
TCI
A
B
C
D
hgiH
muideM
woL
seY
oN
Lab 3
L410
0/1
Room area marginal.
1
No blackout provision limits experiments. No mechanical ventilation.
1
Poor relationship to Science staff facilities.
1
Fixed furniture layout restricts flexibility and supervision.
Fume cupboards against wall limits visibility of experiments by students.
0
WIFI enabled
Second means of escape through chemical store/prep room.
Narrow door does not meet current requirements. Access by way of poor quality lift opening directly into Lab 2
Lab 4
L(cid:1008)14
0/1
Room area below norm.
1
No blackout provision limits experiments. Mechanical vent.
1
Poor relationship to Science staff facilities.
1
Fixed furniture layout restricts flexibility and supervision.
Fume cupboards against wall limits visibility of experiments by students.
0
WIFI enabled
Second means of escape through chemical store/prep room.
Access by way of poor quality lift opening directly into Lab 2
Spaces
Direct Impact on Education
H & S/
Security
Disabled
Access
Comments
Type
Category
feR
euqinU
mooR
noitangiseD
mooR edoC
epahS/eziS
tnemnorivnE
noitacoL
erutinruF
dexiF
erutcurtsarfnI
TCI
A
B
C
D
hgiH
muideM
woL
seY
oN
Prep 4/5
L(cid:1008)16
0
1
Poor ventilation
0
0
0
Lab 3 and 4 second means of escape is through the prep area, potentially impeded by furniture and
equipment.
Room layout makes use and access difficult.
Lab 5
L(cid:1008)20
0/1
Room area marginal.
1
No blackout provision limits experiments. Mechanical vent.
1
Poor relationship to Science staff facilities.
1
Fixed furniture layout restricts flexibility and supervision.
0
WIFI e nabled
Second means of escape through chemical store/prep room.
Access by way of poor quality lift opening directly into Lab 2 at far end of science ‘string’ of rooms
Lab 6
L(cid:1008)4(cid:1006)
0/1
Room area marginal.
1
No blackout provision limits experiments. Mechanical ventilation.
1
Poor relationship to Science staff facilities.
1
Fixed furniture layout restricts flexibility and supervision. Lack of storage
0
WIFI e nabled
Second means of escape through chemical store/prep room.
Access by way of poor quality lift opening directly into Lab 2 then lengthy narrow corridor.
Spaces
Direct Impact on Education
H & S/
Security
Disabled
Access
Comments
Type
Category
euqinU
mooR
feR
noitangiseD
mooR edoC
epahS/eziS
tnemnorivnE
noitacoL
erutinruF
dexiF
erutcurtsarfnI
TCI
A
B
C
D
hgiH
muideM
woL
seY
oN
Prep 6/7
L(cid:1008)4(cid:1007)A
0
1
Poor ventilation
0
0
0
Door widths and layout make use and access difficult.
Lab 6 and 7 second means of escape for each classroom is through the prep area and adjoining
classroom, potentially impeded by furniture and equipment.
Lab 7
L443
1
Room area below norm.
1
No blackout provision limits experiments. No mechanical vent.
2
Bad relationship to other science rooms due to linear layout and lack of corridor access
1
Fixed furniture layout restricts flexibility and supervision.
Fume cupboards against wall limits visibility of experiments by students.
0
WIFI enabled
Second means of escape through chemical store/prep room and adjacent classroom.
Access by way of poor quality lift opening directly into Lab 2 and then along narrow corridor and
through adjacent classroom and prep areas.
Staff
L(cid:1008)45
0
0
2
Bad relationship to other science rooms due to linear layout and lack of corridor access
0
0
WIFI enabled
But access is through adjacent classrooms and prep room.
Spaces
Direct Impact on Education
H & S/
Security
Disabled
Access
Comments
Type
Category
euqinU
mooR
feR
noitangiseD
mooR edoC
epahS/eziS
tnemnorivnE
noitacoL
erutinruF
dexiF
erutcurtsarfnI
TCI
A
B
C
D
hgiH
muideM
woL
seY
oN
Lab 8
C355
0/1
Room area marginal.
0
2
Remote from remainder of science accommodation. On ground floor 150m from nearest science
room.
2
No fume cupboard.
0
WIFI enabled
Remote from remainder of department. Staffing issues.
Classroom used if there is a need for disabled access due to difficulties of using existing lift.
Spaces
Direct Impact on Education
H & S/
Security
Disabled
Access
Comments
Typ
Category
loohcS mooR
feR
tessA
mooR edoC
epahS/eziS
tnemnorivnE
noitacoL
erutinruF
dexiF
erutcurtsarfnI
TCI
A
B
C
D
hgiH
muideM
woL
seY
oN
Room 10
classroom
R202
2
Room severely undersized.
1
Wind noise and draughts.
0
1
Lockers in room reduces usable area.
0
Shortage of space around furniture.
Narrow doorways do not meet current requirements.
Room 11
classroom
R203
2
Room severely undersized.
1
Wind noise and draughts.
0
1
Lockers in room reduces usable area.
0
Shortage of space around furniture.
Narrow doorways do not meet current requirements.
Store
R204
1
Small room
0
0
0
0
Narrow doorways do not meet current requirements.
Spaces
Direct Impact on Education
H & S/
Security
Disabled
Access
Comments
Typ
Category
loohcS mooR
feR
tessA
mooR edoC
epahS/eziS
tnemnorivnE
noitacoL
erutinruF
dexiF
erutcurtsarfnI
TCI
A
B
C
D
hgiH
muideM
woL
seY
oN
Room 12
classroom
R206
1
Room slightly undersized.
1
Wind noise and draughts. Audible footfall from laboratory above.
0
0
0
Store
R206a
1
Small store.
0
0
0
0
Narrow doorways do not meet current requirements.
Room 13
staffroom
R207
0
1
Wind noise and draughts.
0
0
0
Narrow doorway does not meet current requirements.
Spaces
Direct Impact on Education
H & S/
Security
Disabled
Access
Comments
Typ
Category
loohcS mooR
feR
tessA
mooR edoC
epahS/eziS
tnemnorivnE
noitacoL
erutinruF
dexiF
erutcurtsarfnI
TCI
A
B
C
D
hgiH
muideM
woL
seY
oN
Room PS2
classroom
U2(cid:1008)(cid:1005)
2
Room severely undersized.
0
1
Remote from remainder of maths classrooms
0
0
Shortage of space around furniture.
Narrow doorways do not meet current requirements.
Store
U2(cid:1008)(cid:1005)a
1
Small store.
0
0
0
0
Narrow doorway does not meet current requirements.
Spaces
Direct Impact on Education
H & S/
Security
Disabled
Access
Comments
Type
Category
euqinU
mooR
feR
noitangiseD
mooR edoC
epahS/eziS
tnemnorivnE
noitacoL
erutinruF
dexiF
erutcurtsarfnI
TCI
A
B
C
D
hgiH
muideM
woL
seY
oN
Classrm
F4
F336
1
Room size well below standards (BB98)
1
Acoustic separation poor. Adjacent occupiers concerned about level of noise from classrooms.
1
Extremity of dead end corridor
0
1
Lack of data and power outlets
Narrow corridors and dead end location results in overcrowding of corridors during class change.
Layout of rooms inhibits supervision of corridor spaces. Windows open over external path.
Narrow corridors hampers free movement. Narrow doorways do not meet current requirements.
Group
room
F5
F341
0
1
Acoustic separation poor. Adjacent occupiers concerned about level of noise from classrooms.
1
Extremity of dead end corridor
0
1
Lack of data and power outlets
Narrow corridors and dead end location results in overcrowding of corridors during class change.
Layout of rooms inhibits supervision of corridor spaces. Windows open over external path.
Narrow corridors hampers free movement.
Group
room
F6
F340
0
1
Acoustic separation poor. Adjacent occupiers concerned about level of noise from classrooms.
1
Extremity of dead end corridor
0
1
Lack of data and power outlets
Narrow corridors and dead end location results in overcrowding of corridors during class change.
Layout of rooms inhibits supervision of corridor spaces. Windows open over external path.
Narrow corridors hampers free movement. Narrow doorways do not meet current requirements.
Spaces
Direct Impact on Education
H & S/
Security
Disabled
Access
Comments
Type
Category
euqinU
mooR
feR
noitangiseD
mooR edoC
epahS/eziS
tnemnorivnE
noitacoL
erutinruF
dexiF
erutcurtsarfnI
TCI
A
B
C
D
hgiH
muideM
woL
seY
oN
Office
F7
F331
0
Doubles as small ‘speaking room’
0
1
Extremity of dead end corridor
0
0
Narrow corridors and dead end location results in overcrowding of corridors during class change.
Layout of rooms inhibits supervision of corridor spaces.
Narrow corridors hampers free movement. Narrow doorways do not meet current requirements.
Store
F8
F334
0
0
1
Extremity of dead end corridor
0
0
Narrow corridors and dead end location results in overcrowding of corridors during class change.
Narrow co rridors hampe rs free move m ent.
Staff
room
0
1
Acoustic separation poor. Skylight only natural light.
1
Extremity of dead end corridor
0
0
Narrow corridors and dead end location results in overcrowding of corridors during class change.
Layout of rooms inhibits supervision of corridor spaces.
Narrow corridors hampers free movement. Narrow doorways do not meet current requirements.
Spaces
Direct Impact on Education
H & S/
Security
Disabled
Access
Comments
Type
Category
loohcS mooR
fer
tessA
mooR edoC
epahS/eziS
tnemnorivnE
noitacoL
erutinruF
dexiF
erutcurtsarfnI
TCI
A
B
C
D
hgiH
muideM
woL
seY
oN
Classrm
H7
H320
1
Good sized room but without storage cbd/room.
0
0
0
0
Risks from corridor congestion
Narrow doors do not meet current regulations.
Office
H318
1
Small staff base and office for Humanities Department. 8 staff.
0
0
0
0
Lack of privacy for individual Heads of Subject.
Narrow doors do not meet current regulations.
Classrm
H8
H316
1
Room area marginal
1
Room overheats.
0
0
0
Risks from corridor congestion
Narrow doors do not meet current regulations.
Spaces
Direct Impact on Education
H & S/
Security
Disabled
Access
Comments
Type
Category
loohcS mooR
fer
tessA
mooR edoC
epahS/eziS
tnemnorivnE
noitacoL
erutinruF
dexiF
erutcurtsarfnI
TCI
A
B
C
D
hgiH
muideM
woL
seY
oN
Classrm
C3
C356
2
Room severely undersized.
0
1
Not adjoining C2.
0
0
Lack of space around desks.
Narrow doors do not meet current regulations. Lack of space restricts movement of wheelchairs.
Store C3
C356a
1
Store too small for needs resulting in books being stored in classroom which is already too small.
0
0
0
0
Spaces
Direct Impact on Education
H & S/
Security
Disabled
Access
Comments
Type
Category
euqinU
mooR
feR
noitangiseD
mooR edoC
epahS/eziS
tnemnorivnE
noitacoL
erutinruF
dexiF
erutcurtsarfnI
TCI
A
B
C
D
hgiH
muideM
woL
seY
oN
Common
room
U426
1
Not sufficient space for entire 6th Form of 140-150 students. Lack of spaces for individual study.
2
Extremes of temperature and very bad acoustics limit use of space.
0
0
0
Y13
common
room
U415
1
Insufficient space for private study for Y13
1
Poor environmental control.
0
0
0
Narrow door widths do not comply with current requirements for wheelchair access.
Spaces
Direct Impact on Education
H & S/
Security
Disabled
Access
Comments
Type
Category
euqinU
mooR
feR
noitangiseD
mooR edoC
epahS/eziS
tnemnorivnE
noitacoL
erutinruF
dexiF
erutcurtsarfnI
TCI
A
B
C
D
hgiH
muideM
woL
seY
oN
Study
room
U427
0
1
Wide seasonal temperature variations and poor acoustics.
0
0
0
Computer
area
1
Too small to meet demand for computer facilities.
1
Temp variations and poor acoustics.
0
0
0
Emotional
First aid
U429
0
1
No natural daylight.
0
0
0
Narrow door widths do not comply with current requirements for wheelchair access.
Spaces
Direct Impact on Education
H & S/
Security
Disabled
Access
Comments
Type
Category
euqinU
mooR
feR
noitangiseD
mooR edoC
epahS/eziS
tnemnorivnE
noitacoL
erutinruF
dexiF
erutcurtsarfnI
TCI
A
B
C
D
hgiH
muideM
woL
seY
oN
Group
room
U422
0
0
0
0
0
Narrow door widths do not comply with current requirements for wheelchair access.
Head’s
office
U424
0
0
0
0
0
Door width too narrow.
Teaching
room
U430
1
Classroom too small for year group.
0
0
0
0
Narrow door widths do not comply with current requirements for wheelchair access.
Spaces
Direct Impact on Education
H & S/
Security
Disabled
Access
Comments
Type
Category
loohcS mooR
fer
tessA
mooR edoC
epahS/eziS
tnemnorivnE
noitacoL
erutinruF
dexiF
erutcurtsarfnI
TCI
A
B
C
D
hgiH
muideM
woL
seY
oN
Office
H315
0
0
0
0
0
Door width does not meet current requirements re wheelchair access.
Small
group
room
H315a
0
1
Constant noise from IT cabinet renders the room unsuitable for sound recording and a poor space for
teaching. Lack of adequate ventilation.
1
Access through office or Classroom H2
0
1
Noise from IT cabinet.
Door width does not meet current requirements re wheelchair access.
Spaces
Direct Impact on Education
H & S/
Security
Disabled
Access
Comments
Type
Category
euqinU
mooR
feR
noitangiseD
mooR edoC
epahS/eziS
tnemnorivnE
noitacoL
erutinruF
dexiF
erutcurtsarfnI
TCI
A
B
C
D
hgiH
muideM
woL
seY
oN
Studio
D212
1
Shape of space creates difficulties in teaching and supervision of students.
0
0
0
0
Store
D212a
1
0
0
0
0
Narrow door does not meet current requirements for wheelchair access.
Anti
room
D212b
0
0
0
0
0
Narrow door does not meet current requirements for wheelchair access.
Spaces
Direct Impact on Education
H & S/
Security
Disabled
Access
Comments
Type
Category
euqinU
mooR
feR
noitangiseD
mooR edoC
epahS/eziS
tnemnorivnE
noitacoL
erutinruF
dexiF
erutcurtsarfnI
TCI
A
B
C
D
hgiH
muideM
woL
seY
oN
Dark
room
D212c
0
Not currently used as a dark room.
0
0
0
0
Studio
D213
1
D1113 and D1114 are combined to form KS4 studio.
0
0
0
0
Kiln
room
D213a
0
Not currently used.
0
0
0
0
Spaces
Direct Impact on Education
H & S/
Security
Disabled
Access
Comments
Type
Category
euqinU
mooR
feR
noitangiseD
mooR edoC
epahS/eziS
tnemnorivnE
noitacoL
erutinruF
dexiF
erutcurtsarfnI
TCI
A
B
C
D
hgiH
muideM
woL
seY
oN
Store
D213b
1
Small store.
0
0
0
0
Narrow door does not meet current requirements for wheelchair access.
Store
D213c
1
0
0
0
0
Narrow door does not meet current requirements for wheelchair access.
Studio
D214
1
D1113 and D1114 are combined to form KS4 studio.
0
0
0
0
Spaces
Direct Impact on Education
H & S/
Security
Disabled
Access
Comments
Type
Category
euqinU
mooR
feR
noitangiseD
mooR edoC
epahS/eziS
tnemnorivnE
noitacoL
erutinruF
dexiF
erutcurtsarfnI
TCI
A
B
C
D
hgiH
muideM
woL
seY
oN
Store
D214a
1
Small store
0
0
0
0
Narrow door does not meet current requirements for wheelchair access.
6th form
studio
D215
1
Small studio restricts number of students and size of work pieces.
0
0
0
0
Store
D215a
1
0
0
0
0
Narrow door does not meet current requirements for wheelchair access.
Spaces
Direct Impact on Education
H & S/
Security
Disabled
Access
Comments
Type
Category
euqinU
mooR
feR
noitangiseD
mooR edoC
epahS/eziS
tnemnorivnE
noitacoL
erutinruF
dexiF
erutcurtsarfnI
TCI
A
B
C
D
hgiH
muideM
woL
seY
oN
Store
D214b
0
0
0
0
0
Narrow door does not meet current requirements for wheelchair access.
Spaces
Direct Impact on Education
H & S/
Security
Disabled
Access
Comments
Type
Category
euqinU
mooR
feR
noitangiseD
mooR edoC
epahS/eziS
tnemnorivnE
noitacoL
erutinruF
dexiF
erutcurtsarfnI
TCI
A
B
C
D
hgiH
muideM
woL
seY
oN
Head’s
office
D219
0
1
0
0
0
Narrow door does not meet current requirements for wheelchair access.
Wkshop/
main
store
D218a
1
Shape/size of workshop preludes the correct setting out of major timber cutting equipment.
1
Noisy when in use. Dust extract system for DT dept in corner of room.
0
1
Fixed items hamper distribution of stores.
0
Lack of suitable work area markings around machinery. Poor floor finish.
Store
D220
0
0
0
0
0
Narrow door does not meet current requirements for wheelchair access.
Spaces
Direct Impact on Education
H & S/
Security
Disabled
Access
Comments
Type
Category
euqinU
mooR
feR
noitangiseD
mooR edoC
epahS/eziS
tnemnorivnE
noitacoL
erutinruF
dexiF
erutcurtsarfnI
TCI
A
B
C
D
hgiH
muideM
woL
seY
oN
Graphics
classrm
DT6
D223
1
Small classroom – tight for groups of 22+ students.
1
0
1
Plotter and 3D printers reduce usable space in room.
0
Congestion in small room creates hazard.
Heat
treatmt
room
D222
2
Room too small to allow adequate supervision or teaching. Restricts number of students able to use.
2
Size of room exacerbates issues with fume extract and heat buildup.
0
1
Items of equipment take up large proportion of floor space.
0
Tight space and hazardous processes increase health and safety risks.
Wheelchair maneuverability severely restricted by size of room and fixed equipment.
Lab
DT7
D225
1
Small classroom – tight for groups of 22+ students doing practicals.
1
No mechanical ventilation other than dust extract from machines.
0
0
0
Tight space for practical work.
Spaces
Direct Impact on Education
H & S/
Security
Disabled
Access
Comments
Type
Category
euqinU
mooR
feR
noitangiseD
mooR edoC
epahS/eziS
tnemnorivnE
noitacoL
erutinruF
dexiF
erutcurtsarfnI
TCI
A
B
C
D
hgiH
muideM
woL
seY
oN
Lab
DT 8
D224
2
Very small laboratory, use restricted to A level students due to size limitations.
1
No mechanical vent, room warm in summer term.
0
0
0
Constricted space with consequential trip hazards.
Food
room
DT1
D245
1
Lab too small for class sizes. No prep room
1
Lab very warm, windows do not open far enough to help with ventilation. Condensation renders
floors slippy. Noisy window fans.
0
1
Insufficient space in lab for fridges etc. no provision for cooling food.
1
No IT provision in room.
Environmental conditions and lack of space generates a high H&S risk. No hand wash facility.
Narrow door does not meet current requirements for wheelchair access.
Lab
DT2
D243
1
Small general teaching laboratory.
0
0
0
0
Narrow door does not meet current requirements for wheelchair access.
Spaces
Direct Impact on Education
H & S/
Security
Disabled
Access
Comments
Type
Category
euqinU
mooR
feR
noitangiseD
mooR edoC
epahS/eziS
tnemnorivnE
noitacoL
erutinruF
dexiF
erutcurtsarfnI
TCI
A
B
C
D
hgiH
muideM
woL
seY
oN
Store
D244
1
Store too small, adjacent corridor used for storage.
0
1
Storage of foodstuffs should be in classroom.
0
0
Risk of contamination during movement of foodstuffs.
Narrow door does not meet current requirements for wheelchair access.
Store
D244a
1
Store too small, adjacent corridor used for storage.
0
1
Storage of foodstuffs should be in classroom.
0
0
Risk of contamination during movement of foodstuffs.
Narrow door does not meet current requirements for wheelchair access.
Lab
Textiles
DT3
D236
1
Redundant food preparation area limits functionality.
1
Room generally cold.
0
1
Insufficient space for sewing machines.
0
Narrow door does not meet current requirements for wheelchair access.
Spaces
Direct Impact on Education
H & S/
Security
Disabled
Access
Comments
Type
Category
euqinU
mooR
feR
noitangiseD
mooR edoC
epahS/eziS
tnemnorivnE
noitacoL
erutinruF
dexiF
erutcurtsarfnI
TCI
A
B
C
D
hgiH
muideM
woL
seY
oN
Store
D236a
1
Small store, not large enough for rolls of material or large work pieces.
0
0
0
0
Narrow door does not meet current requirements for wheelchair access.
Store
D252
1
Large store but aspect ratio renders much of the space useless.
1
No control of condition for storage of materials or work pieces.
0
0
0
Narrow door does not meet current requirements for wheelchair access.
Textiles
Classrm
DT4
D254
1
Room of insufficient size for KS3 classes of 22+ students. No dedicated space for A Level students.
1
Cold room with no specific ventilation.
1
Remote from Art Dept for A Level Art Design Textiles students and shared technician.
1
Washing facilitates for dying and cleaning of work pieces is insufficient.
0
Narrow door does not meet current requirements for wheelchair access.
Spaces
Direct Impact on Education
H & S/
Security
Disabled
Access
Comments
Type
Category
euqinU
mooR
feR
noitangiseD
mooR edoC
epahS/eziS
tnemnorivnE
noitacoL
erutinruF
dexiF
erutcurtsarfnI
TCI
A
B
C
D
hgiH
muideM
woL
seY
oN
Practice
1
M166
1
Small room with limited capacity for group practice.
1
Poor acoustic isolation
0
0
1
Poor provision of data and power outlets
Lack of storage space for instruments leading to storage in corridors. Narrow corridors.
Narrow doors to accommodation from narrow corridors
Practice
2
M168
1
1
0
0
1
Lack of storage space for instruments leading to storage in corridors. Narrow corridors.
Narrow doors to accommodation from narrow corridors and ramped corridor.
IT room
M170a
1
Small internal room too small for large group work
1
No natural light or ventilation
0
0
0
Narrow doors to accommodation from narrow corridors and ramped corridor.
Spaces
Direct Impact on Education
H & S/
Security
Disabled
Access
Comments
Typ
Category
loohcS mooR
feR
tessA
mooR edoC
epahS/eziS
tnemnorivnE
noitacoL
erutinruF
dexiF
erutcurtsarfnI
TCI
A
B
C
D
hgiH
muideM
woL
seY
oN
Study
room
R190
1
Small room for quiet study. Capacity 6.
1
Mechanically ventilated but gets warm when used.
0
0
0
Narrow doors do not meet current regulations.
Computer
room
1
Small ‘bookable’ IT classroom with capacity of 17, remainder of class use computers in the library.
1
Mechanically ventilated but gets warm when used.
0
0
0
Supervision of room and library overflow not satisfactory.
Spaces
Direct Impact on Education
H & S/
Security
Disabled
Access
Comments
Type
Category
euqinU
mooR
feR
noitangiseD
mooR edoC
epahS/eziS
tnemnorivnE
noitacoL
erutinruF
dexiF
erutcurtsarfnI
TCI
A
B
C
D
hgiH
muideM
woL
seY
oN
Gym
G(cid:1007)83
2
Aspect ratio and size preclude use for court sports. Used as exam room.
1
1
Remote location causes loss of teaching time.
0
1
Lack of audio or video resource
External access over trafficked area in front of school.
Some threshold issues.
Gym
storage
G(cid:1007)83a
1
Storage space inadequate, large items stored in gym reducing usable space.
0
0
0
0
Items stored in gym.
Changing
Rooms
G(cid:1007)84
1
Only one male and one female.
G(cid:1007)90
2
Very poor environmental conditions.
1
Remote from external playing fields.
1
Poor layout of benches, no lockers for lettings or student use.
0
Spaces
Direct Impact on Education
H & S/
Security
Disabled
Access
Comments
Type
Category
euqinU
mooR
feR
noitangiseD
mooR edoC
epahS/eziS
tnemnorivnE
noitacoL
erutinruF
dexiF
erutcurtsarfnI
TCI
A
B
C
D
hgiH
muideM
woL
seY
oN
PE
Classrm
G(cid:1007)81
0
Size suitable but there is only one classroom. Use of another classroom in school reduces teaching
time.
1
Poor lighting and general ventilation conditions. Used for public lettings.
1
Remote location can cause loss of teaching time.
0
1
Lack of data and power points.
External access over trafficked area in front of school.
Threshold issues.
Staff
office
0
0
1
Remote from remainder of school but centrally located in PE Dept.
0
1
Lack of data and power points.
External access over trafficked area in front of school.
Narrow door does not comply with current requirements for wheelchair access.
General
storage
1
Lack of appropriate storage,
0
2
Items and furniture stored in corridors.
0
0
Corridors used for storage creates hazard.
Narrow door does not comply with current requirements for wheelchair access.
External
fields
0
0
0
0
0
Spaces
Direct Impact on Education
H & S/
Security
Disabled
Access
Comments
Type
Category
loohcS mooR
fer
tessA
mooR edoC
epahS/eziS
tnemnorivnE
noitacoL
erutinruF
dexiF
erutcurtsarfnI
TCI
A
B
C
D
hgiH
muideM
woL
seY
oN
SC 2
H(cid:1007)(cid:1006)(cid:1008)a
2
Nurture area – use restricted by current size of room.
0
0
0
1
Lack of data and power outlets.
Access door is narrower than required by current requirements for wheelchair access.
Kitchen
0
0
0
0
0
SC 3 unit
H(cid:1007)19
1/2
Adequacy of space varies from year to year depending on specific needs of students.
0
0
0
1
Lack of data and power outlets.
Access door is narrower than required by current requirements. External thresholds do not meet
current regulations.
Spaces
Direct Impact on Education
H & S/
Security
Disabled
Access
Comments
Type
Category
loohcS mooR
fer
tessA
mooR edoC
epahS/eziS
tnemnorivnE
noitacoL
erutinruF
dexiF
erutcurtsarfnI
TCI
A
B
C
D
hgiH
muideM
woL
seY
oN
Unit
Physio/
shower
H(cid:1007)(cid:1006)(cid:1005)
0
0
0
0
0
Access door is narrower than required by current requirements for wheelchair access.
Unit
physio/
wc
H327
0
0
0
0
0
Access door is narrower than required by current requirements for wheelchair access.
Unit
Sensory
room
H(cid:1007)17
1
Small space off of corridor.
1
Curtained off space.
2
Located off of corridor – lack of privacy
0
0
Spaces
Direct Impact on Education
H & S/
Security
Disabled
Access
Comments
Type
Category
loohcS mooR
fer
tessA
mooR edoC
epahS/eziS
tnemnorivnE
noitacoL
erutinruF
dexiF
erutcurtsarfnI
TCI
A
B
C
D
hgiH
muideM
woL
seY
oN
Unit
Group
room
H(cid:1007)25
0
0
0
0
0
Access door is narrower than required by current requirements for wheelchair access.
Unit
office
H300
1
Small room unsuited to current use
0
0
0
0
Access door is narrower than required by current requirements for wheelchair access.
Unit
‘prefab’
(cid:1009) (cid:1011)
0
0
2
Remote from remainder of unit and consequently difficult to manage and underused.
0
1
Lack of data and power outlets
Access door is narrower than required by current requirements. External thresholds do not meet
current regulations. Access by ramp.
Spaces
Direct Impact on Education
H & S/
Security
Disabled
Access
Comments
Type
Category
loohcS mooR
fer
tessA
mooR edoC
epahS/eziS
tnemnorivnE
noitacoL
erutinruF
dexiF
erutcurtsarfnI
TCI
A
B
C
D
hgiH
muideM
woL
seY
oN
SC 4
Mobile
(cid:1009) (cid:1008)
0
0
2
Remote from remainder of unit and consequently difficult to manage. Two staff required at all times.
0
1
Lack of data and power outlets.
Access door is narrower than required by current requirements. External thresholds do not meet
Spaces
Direct Impact on Education
H & S/
Security
Disabled
Access
Comments
Type
Category
euqinU
mooR
feR
noitangiseD
mooR edoC
epahS/eziS
tnemnorivnE
noitacoL
erutinruF
dexiF
erutcurtsarfnI
TCI
A
B
C
D
hgiH
muideM
woL
seY
oN
Staff
corridor
A125
0
0
0
0
0
Congestion related risks
Only wheelchair accessible from outside. Steps on corridor to admin area.
English
corridor
R153
1
Narrow corridor with high usage resulting in congestion.
0
0
0
0
Congestion related risks.
English
corridor
R159
1
Narrow corridor with high usage resulting in congestion.
1
Toilet hand driers create acoustic problems.
0
0
0
Congestion related risks
Spaces
Direct Impact on Education
H & S/
Security
Disabled
Access
Comments
Type
Category
euqinU
mooR
feR
noitangiseD
mooR edoC
epahS/eziS
tnemnorivnE
noitacoL
erutinruF
dexiF
erutcurtsarfnI
TCI
A
B
C
D
hgiH
muideM
woL
seY
oN
English
corridor
R165
1
Narrow corridor junction with stair from upper floor.
0
0
0
0
Congestion related risks
Maths
corridor
R(cid:1005) (cid:1011)
1
Narrow corridor with high usage resulting in congestion.
1
Toilet hand driers create acoustic problems.
0
0
0
Congestion related risks
Maths
corridor
R210
1
Narrow corridor junction with stair from upper floor.
0
0
0
0
Congestion related risks
Spaces
Direct Impact on Education
H & S/
Security
Disabled
Access
Comments
Type
Category
euqinU
mooR
feR
noitangiseD
mooR edoC
epahS/eziS
tnemnorivnE
noitacoL
erutinruF
dexiF
erutcurtsarfnI
TCI
A
B
C
D
hgiH
muideM
woL
seY
oN
Art
Corridor
D210
1
Narrow dead end corridor.
0
0
0
0
Congestion related risks
No wheelchair access other than through classrooms.
D&T
corridor
1
Narrow corridor.
0
0
0
0
D&T
corridor
D(cid:1006)50
1
Narrow corridor.
0
0
0
0
Spaces
Direct Impact on Education
H & S/
Security
Disabled
Access
Comments
Type
Category
euqinU
mooR
feR
noitangiseD
mooR edoC
epahS/eziS
tnemnorivnE
noitacoL
erutinruF
dexiF
erutcurtsarfnI
TCI
A
B
C
D
hgiH
muideM
woL
seY
oN
Access
to
D&T/Art
D(cid:1006)(cid:1007)(cid:1009)
1
Narrow corridor at junction of main thoroughfare.
0
0
0
0
Congestion related risks.
Wheelchair access to D&T and Art by way of platform lift.
Cooking
corridor
D(cid:1006)(cid:1008)(cid:1006)
1
Narrow corridor.
0
0
1
Storage cupboards and filing cabinets along walls.
0
Congestion related risks.
Library
corridor
P135
1
Wide corridor with severe bottlenecks at each end. Sometimes used as a chair/table store.
0
0
0
0
Congestion related risks.
Spaces
Direct Impact on Education
H & S/
Security
Disabled
Access
Comments
Type
Category
euqinU
mooR
feR
noitangiseD
mooR edoC
epahS/eziS
tnemnorivnE
noitacoL
erutinruF
dexiF
erutcurtsarfnI
TCI
A
B
C
D
hgiH
muideM
woL
seY
oN
Music
corridor
M149
1
Very narrow, partially sloping dead end corridor.
1
Poor acoustics.
0
0
0
Congestion related risks.
Music
corridor
M1(cid:1008)
1
Very narrow dead end corridor
1
Poor acoustics.
0
0
0
Congestion related risks.
Human’
corridor
H326
1
Narrow partially sloping corridor
1
Poor acoustics.
0
1
Filing cabinets and other storage along walls.
0
Congestion related risks. Classrooms both sides of narrow corridor.
Spaces
Direct Impact on Education
H & S/
Security
Disabled
Access
Comments
Type
Category
euqinU
mooR
feR
noitangiseD
mooR edoC
epahS/eziS
tnemnorivnE
noitacoL
erutinruF
dexiF
erutcurtsarfnI
TCI
A
B
C
D
hgiH
muideM
woL
seY
oN
Human’
corridor
H3(cid:1009)(cid:1005)
1
Narrow corridor.
1
P oor acoustics
0
0
0
Congestion related risks.
Language
corridor
F330
1
Narrow partially sloping corridor.
1
Poor acoustics.
1
Dead end corridor.
0
0
Congestion related risks.
Human’
corridor
C351
1
Corridor constricted at each end.
1
Poor acoustics.
0
0
0
Congestion related risks.
Spaces
Direct Impact on Education
H & S/
Security
Disabled
Access
Comments
Type
Category
euqinU
mooR
feR
noitangiseD
mooR edoC
epahS/eziS
tnemnorivnE
noitacoL
erutinruF
dexiF
erutcurtsarfnI
TCI
A
B
C
D
hgiH
muideM
woL
seY
oN
PE
corridor
C365
1
Narrow corridor.
1
Poor acoustics.
0
0
0
Congestion related risks.
Staff
corridor
First
floor
A(cid:1008)(cid:1010)
0
0
0
0
0
No lift to first floor in this area.
Science
corridor
L400
1
Narrow corridor.
0
0
0
0
Congestion related risks
Spaces
Direct Impact on Education
H & S/
Security
Disabled
Access
Comments
Type
Category
euqinU
mooR
feR
noitangiseD
mooR edoC
epahS/eziS
tnemnorivnE
noitacoL
erutinruF
dexiF
erutcurtsarfnI
TCI
A
B
C
D
hgiH
muideM
woL
seY
oN
Science/
6th form
corridor
L409
1
Narrow, partially sloping corridor
2
Extremes of temperature and very poor aesthetics – roof ductwork, ponding etc.
0
0
0
Congestion related risks.
By way of small lift which opens out into Lab 2.
Science/
6th form
corridor
L411
1
Narrow corridor
2
Extremes of temperature and very poor aesthetics – roof ductwork, ponding etc.
0
0
0
Congestion related risks.
By way of small lift which opens out into Lab 2.
Science/
6th form
corridor
L418
1
Narrow corridor
0
0
0
0
Congestion related risks.
By way of small lift which opens out into Lab 2.
Spaces
Direct Impact on Education
H & S/
Security
Disabled
Access
Comments
Type
Category
euqinU
mooR
feR
noitangiseD
mooR edoC
epahS/eziS
tnemnorivnE
noitacoL
erutinruF
dexiF
erutcurtsarfnI
TCI
A
B
C
D
hgiH
muideM
woL
seY
oN
Stairwell
R208
1
Narrow stair.
0
0
0
0
Congestion related risks.
No lift access to first floor in this area.
Spaces
Direct Impact on Education
H & S/
Security
Disabled
Access
Comments
Type
Category
loohcS mooR
fer
tessA
mooR edoC
epahS/eziS
tnemnorivnE
noitacoL
erutinruF
dexiF
erutcurtsarfnI
TCI
A
B
C
D
hgiH
muideM
woL
seY
oN
Kitchen
K134
2
Kitchen area very constrained limiting opportunities.
1
Acoustics poor.
0
2
Congested area.
0
Congested kitchen area - risk of injury.
No space for maneuvering of wheelchairs. Kitchen not set up for wheelchair use.
Servery
K134
2
Server area severely congested at lunch times.
1
Acoustics poor.
0
1
Till layout determined by available space. Queuing requires supervision.
0
Congested area – risk of injury.
Wheelchair accessible but constrained space.
Zone
1 – Entrance area
Lack of visual ‘presence’ and gravitas.
2 – Admin area
A mix of single and two storey flat and pitched roof structures,
vaguely ‘Art Deco’ in style. Centrally located offices and service
accommodation.
3 – Kitchen/dining/hall
Centrally located facility but location close to main entrance
causes congestion at break and lunch times. Combined area of hall
and dining area just sufficient to deal with in excess of 700 meals
at lunch time. No adequate storage space for tables and chairs
when not in use.
4 – English, maths
and science
Two storey brick structure with pitched slated roof. Maths and
English classrooms generally below acceptable area for class sizes.
Science classrooms on first floor generally closer to minimum area
required for class sizes.
Corridors feeding these rooms well below acceptable width.
5 – Humanities
Humanities subjects relatively closely grouped but without
sufficient classrooms for all teachers. Geography classrooms
generously sized and linked by a folding partition.
6 – Languages
Single storey masonry construction under a tiled pitched roof.
Dead end location.
7 – PE
Remotely located facility housed in a mix of old military
accommodation and newer sports hall. Changing and gymnasium
facilities are well below standard.
8 – D&T/Art
Main portion of department housed within Vic Hallam Derwent
System modular timber framed single storey building which allows
a significant level of flexibility in layout but which suffers from a
lack of environmental control and age related decay.
The structure was built in the late 1950’s with an expected life
span of xx years.
Wheelchair access by way of small platform lift adjacent to
interface with Hall.
Remainder of department housed in single storey flat roofed
structure.
9 – Library/6th form
‘Lightweight’ interjection into former open quad. Completed in
2000? Very poor environmental conditions and acoustics due to
inappropriate roof covering.
10 – Music and Drama
Music and Drama facilities lacking in rehearsal and performance
space. Location remote from Art negatively impacts on
cooperation between the creative arts.
11 - SEN
Slightly fragmented facility across two main building areas and
two external ‘mobile classrooms’ caused issues with supervision
and control. No dedicated external activity area.
GH Ex Central Z
Greenhouse Area
GH
Ex
Central
Z
Item
Element
Material
Finish
Condition
Priority
Cost
Comment
Maintenance
Item
Future
Attention
Required
GH
Ex
Central
Z
Pedestrian Area
Greenhouse
Aluminium
C
1
Greenhouse frame is aged guttering to the base has end
covers missing and broken downpipe, there is one broken
glass pain with tape holing it together. Any ferrous fixings are
very likely to be corroded. The rendering to the base walls has
delaminated to the opening and in other local areas
GH
Ex
Central
Z
Pedestrian Area
Drainage Gullies
Steel
A
3
Gullies are worn corroded but serviceable
GH
Ex
Central
Z
Pedestrian Area
Pathways
Concrete
C
2
Concrete paths have cracked in almost all areas, the joints are
not displaced and are serviceable generally; there is one large
recently installed area which is in a good condition
GH
Ex
Central
Z
Pedestrian Area
Pathways
Macadam
C
2
Macadam sections have settled and become uneven in some
areas, sections are poor but generally serviceable
GH
Ex
Central
Z
Limited Access Area
Pathways
Slabs
B
3
The slabs are aged and generally serviceable (Slabbed area is
used for storage and only partly visible for inspection)
GH
Ex
Central
Z
Pedestrian Area
Walling
Brick
B
3
Walling adjacent to the Sports Hall door is aged but generally
serviceable
GH
Ex
Central
Z
Pedestrian Area
Planters
Brick
C
3
Planter to the side on the Greenhouse has a section where
the brickwork has broken, approximately 20 bricks are
missing; there is no capping to the top of this walling
GH
Ex
Central
Z
Limited Access Area
Fencing
Timber
Not known
E
1
Fencing around the storage area has broken posts and panels
GH
Ex
Central
Z
Pedestrian Area
Shed/Out‐building
Timber
Not known
A
3
GH
Ex
Central
Z
Pedestrian Area
Railings
Steel
Painted
B
2
Railings to ramps are aged and have corrosion to the fixings
CR Ex Central Z
Circulation Roundabout
CR
Ex
Central
Z
Item
Element
Material
Finish
Condition
Priority
Cost
Comment
Maintenance
Item
Future
Attention
Required
CR
Ex
Central
Z
Vehicle Area
Roadway Surface
Macadam
A
3
Settlement has caused some local undulations to the surface
which is evident against some of the Kerbs. The surface is
generally is good condition
CR
Ex
Central
Z
Vehicle Area
Road Kerbs
Concrete
B
3
Aged in all areas with some local fractures, generally sound;
the upstand of the Kerbs is not consistent due presumably to
the settlement. The design function of the Kerbs upstand to
repel car wheels has been compromised particularly around
the island
CR
Ex
Central
Z
Vehicle Area
White Lines
Painted
B
2
Lines are worn in places
Yes
CR
Ex
Central
Z
Vehicle Area
Drainage Gullies
Steel
A
3
Aged but in a satisfactory condition
CR
Ex
Central
Z
Vehicle Area
Drainage Covers
Steel
A
3
Aged but in a satisfactory condition
CR
Ex
Central
Z
Pedestrian Area
Pathways
Macadam
A
3
Aged but in a satisfactory condition
CR
Ex
Central
Z
Pedestrian Area
Pathways
Slabs
B
2
Paving to the central recreation area have broken and jointing
has started to breakdown in several areas
Yes
CR
Ex
Central
Z
Pedestrian Area
Back Edge Kerbs
Concrete
A
3
Aged but in a satisfactory condition
CR
Ex
Central
Z
Pedestrian Area
Street Furniture
Timber
Not known
D
1
Tables and seating are rotting in places, edge features to the
sides of pathways have deteriorated and are falling apart
Yes
CR
Ex
Central
Z
Pedestrian Area
Walling
Natural Stone
A
3
Satisfactory condition
Cp/F Ex Central Z
Carpark School Frontage
Cp/F
Ex
Central
Z
Item
Element
Material
Finish
Condition
Priority
Cost
Comment
Maintenance
Item
Future
Attention
Required
Cp/F
Ex
Central
Z
Vehicle Area
Roadway Surface
Macadam
A
3
Settlement has caused some local undulations to the surface
which is evident against some of the Kerbs. The surface is
generally is good condition
Cp/F
Ex
Central
Z
Vehicle Area
Road Kerbs
Concrete
B
3
Aged in all areas with some local fractures, generally sound;
the upstand of the Kerbs is not consistent due presumably to
the settlement
Cp/F
Ex
Central
Z
Vehicle Area
White Lines
Painted
B
2
Lines are worn in places
Cp/F
Ex
Central
Z
Vehicle Area
Parking Bay Surface
Macadam
A
3
Settlement has caused some local undulations to the surface
which is evident against some of the Kerbs. The surface is
generally is good condition, there is detritus and evidence of
standing water areas
Cp/F
Ex
Central
Z
Vehicle Area
Drainage Gullies
Steel
A
3
Aged but in a satisfactory condition
Cp/F
Ex
Central
Z
Vehicle Area
Drainage Covers
Steel
A
3
Aged but in a satisfactory condition
Cp/F
Ex
Central
Z
Pedestrian Area
Pathways
Macadam
C
2
Sections adjacent to Blocks J & K are uneven in places,
settlement has occurred to a small degree and the surface is
uneven in places. Path adjacent to the Tennis Court has
sections missing which pose as trip hazards
Cp/F
Ex
Central
Z
Pedestrian Area
Pathways
Slabs
A
2
A few local fractures / cracks but generally satisfactory
Cp/F
Ex
Central
Z
Pedestrian Area
Pathways
Concrete
E
1
Concrete surface adjacent to the Kitchen has large cracks and
substantial gaps which could cause a trip hazard
Cp/F
Ex
Central
Z
Limited Access Area
Street Furniture
Timber
Painted
A
2
Flag Pole is very aged and has corrosion to metal parts
Cp/F
Ex
Central
Z
Limited Access Area
Hardstand
Gravel (Loose)
Painted
B
2
The ground cover is this area is uneven, with poor inset
wooden treads
Cp/F
Ex
Central
Z
Pedestrian Area
Railings
Steel
Powder Coating
A
3
Colouring has faded significantly but the functionally is in
satisfactory condition
Cp/F
Ex
Central
Z
Pedestrian Area
Bollards
Steel
Painted
A
3
Satisfactory condition
Cp/F
Ex
Central
Z
Pedestrian Area
Bollards
Timber
Treated
A
3
Satisfactory condition
Cp/F
Ex
Central
Z
Pedestrian Area
Seating
Steel
Powder Coating
A
2
Fixing down bolts are corroding
Cp/F
Ex
Central
Z
Pedestrian Area
Walling
Rendered
Painted
A
3
Satisfactory condition
Cp/F
Ex
Central
Z
Pedestrian Area
Walling
Rendered
D
2
The north boundary wall has hairline cracks and delaminating
render local to the construction joints. The wall is starting to
lean forward out of the vertical slightly
Cp/F
Ex
Central
Z
Pedestrian Area
Walling
Rendered
D
1
The small retaining wall adjacent to the Triple Tennis Courts
has cracking and several sections where the concrete capping
has broken off and or been displaced. Broken materials are
laying in the local grass
Cp/F
Ex
Central
Z
Pedestrian Area
Steps
Brick
A
3
Satisfactory condition
Cp/F
Ex
Central
Z
Pedestrian Area
Walling
Rendered
A
3
Satisfactory condition (Bin Store)
Cp/D Ex West Z
Carpark Block D
Cp/D
Ex
West
Z
Item
Element
Material
Finish
Condition
Priority
Cost
Comment
Maintenance
Item
Future
Attention
Required
Cp/D
Ex
West
Z
Vehicle Area
Roadway Surface
Concrete
E
2
The ramp access has an uneven surface with sections of old
brick walling substructure forming the surface locally
Cp/D
Ex
West
Z
Vehicle Area
Road Kerbs
Concrete
E
2
There is kerbing completely failed to the short Kerbs section
of the ramp
Cp/D
Ex
West
Z
Vehicle Area
Roadway Surface
Consolidated Stone
E
2
The consolidated stone has become pitted from continued
vehicle turning, several pot‐holes and depressions are
>100mm
Cp/D
Ex
West
Z
Vehicle Area
Parking Bay Surface
Consolidated Stone
E
2
The consolidated stone has become pitted from continued
vehicle turning, several pot‐holes and depressions are
>100mm
Cp/D
Ex
West
Z
Vehicle Area
Back Edge Kerbs
Timber
E
2
Timber strip edge between the stone surface and grass areas
has become overgrown and has worn where visible
Cp/D
Ex
West
Z
Vehicle Area
Walling
Rendered
D
2
The north boundary wall has hairline cracks and delaminating
render local to the construction joints. The wall is starting to
lean forward out of the vertical slightly
Cp/D
Ex
West
Z
Vehicle Area
Drainage Covers
Steel
C
2
Inspection chamber cover is not suitably rated for vehicle
passage, security screws are missing and the cover seating
ring has not been encapsulated in concrete
TTC Ex Central Z
Triple Tennis Court
TTC
Ex
Central
Z
Item
Element
Material
Finish
Condition
Priority
Cost
Comment
Maintenance
Item
Future
Attention
Required
TTC
Ex
Central
Z
Sports Area
Hardstand
Macadam
A
3
Surface has some settlement local to the perimeter Kerbs and
undulation but remains satisfactory
TTC
Ex
Central
Z
Sports Area
White Lines
Painted
A
3
Satisfactory condition
TTC
Ex
Central
Z
Sports Area
Drainage Gullies
Steel
B
3
The gully grate is set approximately 100mm below the local
surface level
TTC
Ex
Central
Z
Sports Area
Back Edge Kerbs
Concrete
A
3
Satisfactory condition
TTC
Ex
Central
Z
Sports Area
Fencing
Steel
Galvanised
C
2
Fencing support wires have broken at most posts, connection
rings are corroding. There are gaps in the wiring on the gate
Cp/H Ex North Z
Carpark Horseshoe & Lane
Cp/H
Ex
North
Z
Item
Element
Material
Finish
Condition
Priority
Cost
Comment
Maintenance
Item
Future
Attention
Required
Cp/H
Ex
North
Z
Vehicle Area
Roadway Surface
Macadam
B
2
There is one section of the road surface which has started to
break‐up
Yes
Cp/H
Ex
North
Z
Vehicle Area
Road Kerbs
Concrete
A
3
Satisfactory condition
Cp/H
Ex
North
Z
Vehicle Area
White Lines
Painted
B
2
Paint has worn and may be indistinguishable is poor light and
or wet conditions
Cp/H
Ex
North
Z
Vehicle Area
Parking Bay Surface
Macadam
A
3
Satisfactory condition
Cp/H
Ex
North
Z
Vehicle Area
Drainage Gullies
Steel
A
3
Satisfactory condition
Cp/H
Ex
North
Z
Vehicle Area
Drainage Gullies
Concrete
B
3
There is one channel section to the roadside which has
displaced and brakes the continuity of the channel
Yes
Cp/H
Ex
North
Z
Vehicle Area
Drainage Covers
Steel
A
3
Satisfactory condition
Cp/H
Ex
North
Z
Pedestrian Area
Pathways
Macadam
B
2
There is a section of the pathway where the macadam
appears to have been lain Thin, the material is beginning to
break up. Some local settlement has occurred local to the sign
posts
Cp/H
Ex
North
Z
Pedestrian Area
Back Edge Kerbs
Concrete
A
3
Satisfactory condition
Cp/H
Ex
North
Z
Pedestrian Area
Railings
Steel
Powder Coating
A
3
Satisfactory condition
Cp/H
Ex
North
Z
Pedestrian Area
Planters
Brick
B
3
Pointing has started to deteriorate local to the top capping
header course
Cp/H
Ex
North
Z
Pedestrian Area
Walling
Natural Stone
B
2
Small local sections of the stone walling along the north
boundary have started to break‐up
Yes
Cp/H
Ex
North
Z
Pedestrian Area
Walling
Brick
D
2
Capping to the small retaining wall has been dislodged along
sections of one wall
Cp/H
Ex
North
Z
Pedestrian Area
Walling
Brick
C
2
Small section of pointing has started to deteriorate
Cp/H
Ex
North
Z
Vehicle Area
Street Furniture
Steel
Painted
B
2
Overhead light column has corrosion on the neck of the
column
MR Ex Central Z
Main Entrance Road
MR
Ex
Central
Z
Item
Element
Material
Finish
Condition
Priority
Cost
Comment
Maintenance
Item
Future
Attention
Required
MR
Ex
Central
Z
Vehicle Area
Roadway Surface
Macadam
B
3
Macadam has started to break‐up along the junction with the
Main Road
MR
Ex
Central
Z
Vehicle Area
Road Kerbs
Concrete
A
3
some chips/crack to Kerbs but generally satisfactory condition
MR
Ex
Central
Z
Vehicle Area
White Lines
Painted
B
2
Paint has worn and may be indistinguishable is poor light and
or wet conditions
MR
Ex
Central
Z
Vehicle Area
Drainage Gullies
Steel
A
3
Satisfactory condition
MR
Ex
Central
Z
Vehicle Area
Drainage Covers
Steel
A
3
Satisfactory condition
MR
Ex
Central
Z
Pedestrian Area
Pathways
Macadam
A
3
Satisfactory condition
MR
Ex
Central
Z
Pedestrian Area
Walling
Natural Stone
A
3
Satisfactory condition
HP Ex Central Z
Hockey Pitch (Single)
HP
Ex
Central
Z
Item
Element
Material
Finish
Condition
Priority
Cost
Comment
Maintenance
Item
Future
Attention
Required
HP
Ex
Central
Z
Sports Area
Hardstand
Macadam
A
3
Surface has some settlement local to the perimeter Kerbs and
undulation but remains satisfactory. There is some detritus
and evidence of standing water
HP
Ex
Central
Z
Sports Area
White Lines
Painted
A
3
Satisfactory condition
HP
Ex
Central
Z
Sports Area
Drainage Gullies
Steel
A
3
Satisfactory condition
HP
Ex
Central
Z
Sports Area
Drainage Covers
Steel
A
3
Satisfactory condition
HP
Ex
Central
Z
Sports Area
Back Edge Kerbs
Concrete
A
3
Satisfactory condition
HP
Ex
Central
Z
Sports Area
Fencing
Steel
Galvanised
C
2
Fencing support wires have broken at most posts, connection
rings are corroding. There are gaps in the wiring on the gate
and there are two posts that have moved away from the
vertical
BGR Ex North Z
Block G Road
BGR
Ex
North
Z
Item
Element
Material
Finish
Condition
Priority
Cost
Comment
Maintenance
Item
Future
Attention
Required
BGR
Ex
North
Z
Vehicle Area
Roadway Surface
Macadam
B
3
There is some tearing local to one chamber cover but
generally satisfactory
BGR
Ex
North
Z
Vehicle Area
Parking Bay Surface
Macadam
A
3
Satisfactory condition
BGR
Ex
North
Z
Vehicle Area
Road Kerbs
Concrete
A
3
Satisfactory condition
BGR
Ex
North
Z
Vehicle Area
White Lines
Painted
A
3
Satisfactory condition
BGR
Ex
North
Z
Vehicle Area
Drainage Gullies
Steel
A
3
Satisfactory condition
BGR
Ex
North
Z
Vehicle Area
Drainage Covers
Steel
A
3
Satisfactory condition
BGR
Ex
North
Z
Vehicle Area
Walling
Natural Stone
A
3
Satisfactory condition
EAR Ex East Z
East Access Road
EAR
Ex
East
Z
Item
Element
Material
Finish
Condition
Priority
Cost
Comment
Maintenance
Item
Future
Attention
Required
EAR
Ex
East
Z
Vehicle Area
Roadway Surface
Macadam
C
1
Macadam has broken up is several local sections
EAR
Ex
East
Z
Vehicle Area
Hardstand
Concrete
C
2
Cracking is widespread
EAR
Ex
East
Z
Vehicle Area
Drainage Covers
Steel
B
2
One chamber has sunk and the cover has deflected
EAR
Ex
East
Z
Vehicle Area
Drainage Gullies
Steel
A
3
Satisfactory condition
EAR
Ex
East
Z
Vehicle Area
Walling
Natural Stone
D
2
The cement/concrete capping to the entire boundary wall has
been displaced all the way along. One section adjacent to the
MUA Substation has started to collapse
EAR
Ex
East
Z
Vehicle Area
Walling
Brick
A
3
Old but generally functional
GC Ex East Z
Groundman's Compound
GC
Ex
East
Z
Item
Element
Material
Finish
Condition
Priority
Cost
Comment
Maintenance
Item
Future
Attention
Required
GC
Ex
East
Z
Vehicle Area
Roadway Surface
Macadam
B
3
GC
Ex
East
Z
Vehicle Area
Hardstand
Concrete
C
2
Cracking is widespread
GC
Ex
East
Z
Vehicle Area
Drainage Covers
Steel
A
3
Old but satisfactory
GC
Ex
East
Z
Vehicle Area
Walling
Brick
A
3
Old but generally functional. One brick missing from the top
corner of one wall
GC
Ex
East
Z
Vehicle Area
Walling
Natural Stone
C
2
The cement/concrete capping to the entire boundary wall has
been displaced
GC
Ex
East
Z
Vehicle Area
Gates
Steel
Galvanised
A
3
Adjustment required but generally functional
Yes
Cp/C Ex East Z
Carpark Block C
Cp/C
Ex
East
Z
Item
Element
Material
Finish
Condition
Priority
Cost
Comment
Maintenance
Item
Future
Attention
Required
Cp/C
Ex
East
Z
Vehicle Area
Roadway Surface
Consolidated Stone
E
2
The consolidated stone has become pitted from continued
vehicle turning, several pot‐holes and depressions are
>100mm
Cp/C
Ex
East
Z
Vehicle Area
Road Kerbs
Concrete
B
3
Aged in all areas with some local fractures, generally sound
Cp/C
Ex
East
Z
Vehicle Area
Parking Bay Surface
Consolidated Stone
E
2
The consolidated stone has become pitted from continued
vehicle turning, several pot‐holes and depressions are
>100mm
Cp/C
Ex
East
Z
Vehicle Area
Drainage Covers
Steel
B
2
One cover cannot be lifted, but generally functional
Cp/C
Ex
East
Z
Vehicle Area
Gates
Steel
Galvanised
A
3
Adjustment required but generally functional
Yes
Cp/C
Ex
East
Z
Vehicle Area
Walling
Natural Stone
C
2
The cement/concrete capping to the entire boundary wall has
been displaced
IC/N Ex North Z
Internal Courtyard (between A‐5 & E‐6)
IC/N
Ex
North
Z
Item
Element
Material
Finish
Condition
Priority
Cost
Comment
Maintenance
Item
Future
Attention
Required
IC/N
Ex
North
Z
Limited Access Area
Hardstand
Slabs
B
2
Worn and uneven surface
IC/N
Ex
North
Z
Limited Access Area
Drainage Gullies
Steel
A
2
Worn but functional
IC/N
Ex
North
Z
Limited Access Area
Drainage Covers
Steel
A
2
Worn but functional
IC/N
Ex
North
Z
Limited Access Area
Walling
Rendered
A
3
Worn but functional
IC/S Ex South Z
Internal Courtyard (between B‐1 & E‐1)
IC/S
Ex
South
Z
Item
Element
Material
Finish
Condition
Priority
Cost
Comment
Maintenance
Item
Future
Attention
Required
IC/S
Ex
South
Z
Pedestrian Area
Hardstand
Slabs
B
2
Worn but functional
IC/S
Ex
South
Z
Pedestrian Area
Drainage Gullies
Steel
B
2
Worn but functional
IC/S
Ex
South
Z
Pedestrian Area
Drainage Covers
Steel
B
2
Worn but functional
IC/S
Ex
South
Z
Pedestrian Area
Back Edge Kerbs
Concrete
B
2
Worn but functional
IC/S
Ex
South
Z
Pedestrian Area
Street Furniture
Timber
A
3
IC/W Ex West Z
Internal Courtyard (between J‐3 & D‐1)
IC/W
Ex
West
Z
Item
Element
Material
Finish
Condition
Priority
Cost
Comment
Maintenance
Item
Future
Attention
Required
IC/W
Ex
West
Z
Pedestrian Area
Hardstand
Timber
Treated
A
3
IC/W
Ex
West
Z
Pedestrian Area
Pathways
Timber
Treated
A
3
IC/W
Ex
West
Z
Limited Access Area
Pathways
Gravel (Loose)
A
3
IC/W
Ex
West
Z
Pedestrian Area
Fencing
Timber
Treated
A
3
IC/W
Ex
West
Z
Pedestrian Area
Street Furniture
Timber
Treated
A
3
IC/W
Ex
West
Z
Pedestrian Area
Drainage Covers
Steel
B
2
Worn but functional
AWP Ex South Z
All weather Sports Pitch
AWP
Ex
South
Z
Item
Element
Material
Finish
Condition
Priority
Cost
Comment
Maintenance
Item
Future
Attention
Required
AWP
Ex
South
Z
Pedestrian Area
Pathways
Macadam
A
3
Some weeds are present but the surface is generally sound
AWP
Ex
South
Z
Pedestrian Area
Back Edge Kerbs
Concrete
A
3
Satisfactory condition
AWP
Ex
South
Z
Pedestrian Area
Fencing
Steel
Galvanised
A
3
There is widespread deposits to the powder coated fencing
which appears to be salts, local areas where individual wires
are bent. Two panels have been removed, presumably for
access. There is some local patches where the paint has
delaminated from Galvanised posts. Posts along the North
elevation appear to have been re‐set into the ground.
Generally in sound condition
AWP
Ex
South
Z
Pedestrian Area
Street Furniture
Steel
Galvanised
A
3
Sports Lighting Columns ‐ There is light surface corrosion
staining in some locations, the columns are in sound
condition generally
AWP
Ex
South
Z
Pedestrian Area
Steps
Slabs
B
2
There is one broken slab at the top of three steps out of the
East side gate
AWP
Ex
South
Z
Pedestrian Area
Hardstand
Astro‐turf
A
3
Surface is aged but generally sound, there is some local moss
growth
GAS Ex West Z
Gas Building
GAS
Ex
West
Z
Item
Element
Material
Finish
Condition
Priority
Cost
Comment
Maintenance
Item
Future
Attention
Required
GAS
Ex
West
Z
Wall
Cover
Rendered
B
3
Aggregate loss in places
GAS
Ex
West
Z
Wall
Doorways
Rendered
A
3
GAS
Ex
West
Z
Wall
Doors
Timber
A
3
GAS
Ex
West
Z
Wall
RWP Downpipes
UPVC
B
1
Broken downpipe connections
GAS
Ex
West
Z
Wall
Fixings
Proprietary
A
2
Lights
GAS
Ex
West
Z
Wall
Penetrations
Brick
A
3
Multiple airbricks
GAS
Ex
West
Z
Roof
Cover
Mineral Felt
A
3
GAS
Ex
West
Z
Roof
Eaves/Fascia
UPVC
A
3
GAS
Ex
West
Z
Roof
RWP Guttering
UPVC
A
3
OIL Ex Central Z
Oil Storage Building
OIL
Ex
Central
Z
Item
Element
Material
Finish
Condition
Priority
Cost
Comment
Maintenance
Item
Future
Attention
Required
OIL
Ex
Central
Z
Wall
Cover
Dash
B
2
Several cracks and patchy loss of chippings but generally
serviceable
OIL
Ex
Central
Z
Wall
Doorways
Rendered
B
2
Not fully sealed around the frame
OIL
Ex
Central
Z
Wall
Doors
Timber
C
2
Rotting door
OIL
Ex
Central
Z
Wall
RWP Downpipes
UPVC
A
2
Aged but serviceable
OIL
Ex
Central
Z
Wall
Parapets
Dash
B
2
Several cracks and patchy loss of chippings but generally
serviceable
OIL
Ex
Central
Z
Wall
Fixings
Services
A
3
Light fitting
OIL
Ex
Central
Z
Wall
Steps
Metal
B
2
Corroding metalwork
OIL
Ex
Central
Z
Roof
Cover
Corrigated Board
A
3
Possibly asbestos boards
OIL
Ex
Central
Z
Roof
Cover
Concrete
A
3
OIL
Ex
Central
Z
Roof
Eaves/Fascia
Concrete
A
3
OIL
Ex
Central
Z
Roof
Eaves/Fascia
Timber
B
2
Delaminating paint, and wood is deteriorating
OIL
Ex
Central
Z
Roof
Soffit
Concrete
A
3
OIL
Ex
Central
Z
Roof
RWP Guttering
UPVC
A
2
Aged but serviceable, vegetation is present
OIL
Ex
Central
Z
Roof
Flashing
Lead
A
3
OIL
Ex
Central
Z
Roof
Side Abutment
Lead
A
3
BKR Ex South Z
Block K Road / Track
BKR
Ex
South
Z
Item
Element
Material
Finish
Condition
Priority
Cost
Comment
Maintenance
Item
Future
Attention
Required
BKR
Ex
South
Z
Vehicle Area
Roadway Surface
Consolidated Stone
E
2
The consolidated stone has become pitted from continued
vehicle use, extensively pot‐holed and depressions are
>150mm
BKR
Ex
South
Z
Vehicle Area
Road Kerbs
Concrete
B
3
Kerbs to one side of the rack only are old, work but
serviceable
BKR
Ex
South
Z
Vehicle Area
Parking Bay Surface
Consolidated Stone
E
2
The consolidated stone has become pitted from continued
vehicle turning, several pot‐holes and depressions are
>100mm
BKR
Ex
South
Z
Vehicle Area
Parking Bay Surface
Concrete
A
3
Generally sat
BKR
Ex
South
Z
Vehicle Area
Drainage Gullies
Steel
B
2
Worn but functional
BKR
Ex
South
Z
Vehicle Area
Drainage Covers
Steel
C
2
Local erosion to the consolidated stone is resulting in one
cover effectively above the ground level
BKR
Ex
South
Z
Vehicle Area
Hardstand
Concrete
A
3
116000
Years Years
CRHS - old
Estmated cost per m2 value
9.53790495
0
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Nett internal floor area
12162
£ 1 ,900
£ 23107800
Energy - based on previous cost
£ 151,500
£ 151500.00
£ 1 51500
£ 1 51500
£ 1 51500
£ 1 51500
£ 151500
£ 149985
£ 148485
£ 147000
£ 145530
£ 144075
£ 142634
£ 141208
£ 139796
£ 138398
£ 137014
£ -
Adjustment value to raise to correct investment
PPM
17%
£ 88,387
£ 6 2,755.01
£ 62,755
£ 62,755.01
£ 62,755.01
£ 62,75501
£ 6 2,755.01
£ 65,893
£ 69,187
£ 72,647
£ 76,279
£ 80,093
£ 84,098
£ 88,303
£ 92,718
£ 97,354
£ 102,221
£ -
£ -
Adjustment value that increases and decreases GR
General repairs
10%
£ 51,993
£ 6 2,391.06
£ 62,391.06
£ 71,749.72
£ 82,512.18
£ 94,88900
£ 109,122.35
£ 125,490.71
£ 119,216
£ 113,255
£ 107,593
£ 102,213
£ 97,102
£ 92,247
£ 87,635
£ 83,253
£ 79,090
Adjustment value to raise to correct investment
Lfe cycle
61%
£ 317,155
£ 7 9,288.64
£ 79,289
£ 79,289
£ 79,289
£ 79,289
£ 79,289
£ 8 7,217.50
£ 9 5,939.25
£ 105,533.18
£ 116,086.50
£ 127,695.15
£ 140,464.66
£ 154,511.13
£ 169,962.24
£ 186,958.46
£ 205,654.31
adjustment value not required
Grounds Manteance
12%
£ 62,391
£ 6 2391.06
£ 62391
£ 62391
£ 62391
£ 62391
£ 62391
£ 62391
£ 62391
£ 62391
£ 62391
£ 62391
£ 62391
£ 62391
£ 62391
£ 62391
£ 62391
225%
estmated correct mantenace cost per annum
£ 519925.50
maintenace cost
£ 519,926
£ 266825.77
£ 2 66826
£ 2 76184
£ 2 86947
£ 2 99324
£ 313557
£ 340992
£ 346734
£ 353826
£ 362349
£ 372392
£ 384056
£ 397452
£ 412706
£ 429956
£ 449357
maintenace cost + energy
£ 671,426
£ 418,325.77
£ 4 18,326
£ 4 27,684
£ 4 38,447
£ 4 50,824
£ 465,057
£ 490,977
£ 495,219
£ 500,827
£ 507,880
£ 516,467
£ 526,690
£ 538,660
£ 552,502
£ 568,354
£ 586,371
£ 55.21
per m2
CRHS new
Estmated cost per m2 value
Nett internal floor area
0
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
adjsutment value for savngs made
£
Based on Bemahague £12.75 m2 with pool = £11.25
Energy - based new buld
£ 156,432
£ 156,432.13
£ 1 56,432
£ 1 56,432
£ 1 56,432
£ 1 56,432
£ 156,432
£ 156,432
£ 156,432
£ 156,432
£ 156,432
£ 156,432
£ 156,432
£ 156,432
£ 156,432
£ 156,432
£ 156,432
Adjustment value 1-11% as PPM kcks in
PPM
17%
£ 135,989
£ 2 7,197.86
£ 27,198
£ 30,189.62
£ 33,510.48
£ 37,19663
£ 4 1,288.26
£ 4 5,829.97
£ 5 0,871.27
£ 5 6,467.11
£ 6 2,678.49
£ 6 9,573.13
£ 7 7,226.17
£ 8 5,721.05
£ 9 5,15036
£ 105,616.90
£ 117,234.76
£ -
£ -
Adjustment value GR ncreases over age of building
General repairs
10%
£ 79,994
£ 3 9,996.85
£ 39,996.85
£ 45,996.38
£ 52,895.83
£ 60,83021
£ 6 9,954.74
£ 7 0,654.29
£ 7 1,360.83
£ 7 2,074.44
£ 7 2,795.18
£ 7 3,523.14
£ 7 4,258.37
£ 7 5,000.95
£ 7 5,750.96
£ 7 6,508.47
£ 7 7,273.56
Adjustment value 1-11% as life cycle kicks in
Lfe cycle
61%
£ 487,962
£ -
£ -
£ -
£ -
£ -
£ -
£ 48796
£ 5 8555.39
£ 7 0266.47
£ 8 4319.76
£ 101183.71
£ 121420.45
£ 145704.55
£ 174845.46
£ 20981455
£ 251777.46
adjustment value not required
Grounds Manteance
12%
£ 95,992
£ 9 5,992.44
£ 95,992
£ 95,992
£ 95,992
£ 95,992
£ 95,992
£ 95,992
£ 95,992
£ 95,992
£ 95,992
£ 95,992
£ 95,992
£ 95,992
£ 95,992
£ 95,992
£ 95,992
£ -
maintenace cost
£ 799,937
£ 163,187.15
£ 1 63,187
£ 1 72,178
£ 1 82,399
£ 1 94,019
£ 207,235
£ 261,273
£ 276,780
£ 294,800
£ 315,786
£ 340,272
£ 368,897
£ 402,419
£ 441,739
£ 487,932
£ 542,278
£ -
estmated correct mantenace cost per annum
£ 799,937.01
maintenace cost + energy
£ 956,369
£ 319,619.28
£ 3 19,619
£ 3 28,611
£ 3 38,831
£ 3 50,451
£ 363,668
£ 417,705
£ 433,212
£ 451,233
£ 472,218
£ 496,705
£ 525,330
£ 558,851
£ 598,171
£ 644,364
£ 698,710
Years Years Years
CRHS - old
Estmated cost per m2 value
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
20 year
30 year
Nett internal floor area
12162
£ 1 900
£ 23107800
Energy - based on previous cost
£ 135644
£ 134287
£ 132944
£ 131615
£ 130299
£ 128996
£ 127706
£ 126429
£ 125165
£ 123913
£ 122674
£ 121447
£ 120233
£ 119030
£ 117840
£ 2856415
£ 4 089846
Adjustment value to raise to correct investment
PPM
17%
£ 9 9,665.76
£ 9 7,174.12
£ 9 4,744.77
£ 9 2,376.15
£ 9 0,066.74
£ 8 7,815.07
£ 8 7,815.07
£ 8 7,815.07
£ 8 7,815.07
£ 8 7,815.07
£ 8 7,815.07
£ 8 7,81507
£ 8 7,815.07
£ 8 7,815.07
£ 8 7,815.07
£ 1,616,595
£ 2 ,494,745
Adjustment value that increases and decreases GR
General repairs
10%
£ 75,136
£ 71,379
£ 67,810
£ 64,420
£ 61,199
£ 58,139
£ 55,232
£ 52,470
£ 51,993
£ 51,993
£ 51,993
£ 51,993
£ 51,993
£ 51,993
£ 51,993
£ 1,767,704
£ 2 ,297,492
Adjustment value to raise to correct investment
Lfe cycle
61%
£ 226219.74
£ 248841.71
£ 27372589
£ 301098.47
£ 331208.32
£ 364329.15
£ 400762.07
£ 360685.86
£ 324617.28
£ 317154.56
£ 317154.56
£ 31715456
£ 317154.56
£ 317154.56
£ 317154.56
£ 3167560
£ 6 520881
adjustment value not required
Grounds Manteance
12%
£ 62391
£ 62391
£ 62391
£ 62391
£ 62391
£ 62391
£ 62391
£ 62391
£ 62391
£ 62391
£ 62391
£ 62391
£ 62391
£ 62391
£ 62391
£ 1247821
£ 1 871732
2.25%
estmated correct mantenace cost per annum
£ 519,925.50
maintenace cost
£ 463,412
£ 479,786
£ 498,672
£ 520,285
£ 544,865
£ 572,674
£ 606,200
£ 563,362
£ 526,816
£ 519,353
£ 519,353
£ 519,353
£ 519,353
£ 519,353
£ 519,353
£ 7,799,679
£ 13,184,851
maintenace cost + energy
£ 599,056
£ 614,073
£ 631,616
£ 651,900
£ 675,164
£ 701,670
£ 733,906
£ 689,791
£ 651,981
£ 643,266
£ 642,027
£ 640,800
£ 639,586
£ 638,383
£ 637,193
£ 10,656,094
£ 16,694,373
CRHS new
Estmated cost per m2 value
Nett internal floor area
£
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
20 year
30 year
adjsutment value for savngs made
£
Based on Bemahague £12.75 m2 with pool = £11.25
Energy - based new buld
£ 156,432
£ 156,432
£ 156,432
£ 156,432
£ 156,432
£ 156,432
£ 156,432
£ 156,432
£ 156,432
£ 156,432
£ 156,432
£ 156,432
£ 156,432
£ 156,432
£ 156,432
£ 3,128,643
£ 4 ,692,964
Adjustment value 1-11% as PPM kcks in
PPM
17%
£ 118407
£ 119591
£ 120787
£ 121995
£ 123215
£ 124447
£ 125692
£ 126948
£ 128218
£ 129500
£ 130795
£ 132103
£ 133424
£ 134758
£ 136106
£ 1539747
£ 2 841739
Adjustment value GR ncreases over age of building
General repairs
10%
£ 7 8,046.29
£ 7 8,826.75
£ 7 9,61502
£ 7 9,993.70
£ 7 9,993.70
£ 7 9,993.70
£ 7 9,993.70
£ 7 9,993.70
£ 7 9,993.70
£ 7 9,993.70
£ 7 9,993.70
£ 7 9,993.70
£ 7 9,993.70
£ 7 9,993.70
£ 7 9,993.70
£ 1,405,350
£ 2 ,205,287
Adjustment value 1-11% as life cycle kicks in
Lfe cycle
61%
£ 264,366.33
£ 277,584.64
£ 291,46388
£ 306,037.07
£ 321,338.92
£ 337,405.87
£ 354,276.16
£ 371,989.97
£ 390,589.47
£ 410,118.94
£ 430,624.89
£ 452,156.14
£ 474,763.94
£ 487,961.58
£ 487,961.58
£ 2,727,475
£ 6 ,925,323
adjustment value not required
Grounds Manteance
12%
£ 95,992
£ 95,992
£ 95,992
£ 95,992
£ 95,992
£ 95,992
£ 95,992
£ 95,992
£ 95,992
£ 95,992
£ 95,992
£ 95,992
£ 95,992
£ 95,992
£ 95,992
£ 1,919,849
£ 2 ,879,773
maintenace cost
£ 556812
£ 571995
£ 587858
£ 604018
£ 620540
£ 637839
£ 655954
£ 674925
£ 694794
£ 715605
£ 737406
£ 760245
£ 784174
£ 798706
£ 800054
£ 7592421
£ 14852122
estmated correct mantenace cost per annum
£ 799937.01
maintenace cost + energy
£ 713244
£ 728427
£ 744291
£ 760450
£ 776972
£ 794271
£ 812386
£ 831357
£ 851226
£ 872037
£ 893838
£ 916677
£ 940606
£ 955138
£ 956486
£ 10721063
£ 19545086
old m2
12162
Floor area ratio adjustment
new m2
Years Years Years
CRHS - old
Estmated cost per m2 value
0
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Nett internal floor area
12162
£ 1 900
£ 23107800
adjsutment value for savngs made
-1%
Energy - based on captal value
0.40%
£ 92,431
£ 92,431.20
£ 92,431
£ 92,431
£ 92,431
£ 92,431
£ 92,431
£ 91,507
£ 90,592
£ 89,686
£ 88,789
£ 87,901
£ 87,022
£ 86,152
£ 85,290
£ 84,437
£ 83,593
£ -
Adjustment value to raise to correct investment
5%
PPM
15%
£ 77,989
£ 55,372.07
£ 55,372
£ 5 5,372.07
£ 5 5,372.07
£ 5 5,37207
£ 5 5,372.07
£ 58,141
£ 61,048
£ 64,100
£ 67,305
£ 70,670
£ 74,204
£ 77,914
£ 81,810
£ 85,900
£ 90,195
£ -
£ -
Adjustment value that increases and decreases GR
-2%
General repairs
15%
£ 77,989
£ 15,597.77
£ 15,598
£ 1 8,717.32
£ 2 2,460.78
£ 2 6,952.94
£ 3 2,343.53
£ 3 8,812.23
£ 4 6,574.68
£ 47,506
£ 48,456
£ 49,425
£ 50,414
£ 51,422
£ 52,451
£ 53,500
£ 54,570
Adjustment value to raise to correct investment
10%
Lfe cycle
59%
£ 306,756
£ 76689.01
£ 76689
£ 76689
£ 76689
£ 76689
£ 76689
£ 8 4357.91
£ 9 2793.70
£ 102073.07
£ 112280.38
£ 123508.42
£ 135859.26
£ 149445.19
£ 164389.71
£ 18082868
£ 198911.54
adjustment value not required
0%
Grounds Manteance
11%
£ 57,192
£ 57,191.81
£ 57,192
£ 57,192
£ 57,192
£ 57,192
£ 57,192
£ 57,192
£ 57,192
£ 57,192
£ 57,192
£ 57,192
£ 57,192
£ 57,192
£ 57,192
£ 57,192
£ 57,192
225%
estmated correct mantenace cost per annum
£ 519,925.50
maintenace cost
£ 519,926
£ 204,850.65
£ 204,851
£ 207,970
£ 211,714
£ 216,206
£ 221,596
£ 238,503
£ 257,608
£ 270,871
£ 285,234
£ 300,796
£ 317,669
£ 335,973
£ 355,842
£ 377,420
£ 400,868
Current under nvestment
£0
-£315,075
-£315,075
-£311,955
-£308,212
-£303,720
-£298,329
-£281,423
-£262,318
-£249,054
-£234,692
-£219,130
-£202,257
-£183,952
-£164,084
-£142,505
-£119,057
maintenace cost + energy
100.00%
£ 297,281.85
£ 297,282
£ 300,401
£ 304,145
£ 308,637
£ 314,028
£ 330,010
£ 348,200
£ 360,557
£ 374,023
£ 388,697
£ 404,691
£ 422,125
£ 441,132
£ 461,858
£ 484,461
CRHS new
£
adjsutment value for savngs made
£
Energy - based on captal value
0.20%
£ 71,106
£ 71,105.51
£ 71,106
£ 71,106
£ 71,106
£ 71,106
£ 71,106
£ 71,106
£ 71,106
£ 71,106
£ 71,106
£ 71,106
£ 71,106
£ 71,106
£ 71,106
£ 71,106
£ 71,106
Adjustment value 1-11% as PPM kcks in
PPM
15%
£ 119,991
£ 23998.11
£ 23998
£ 2 6637.90
£ 2 9568.07
£ 3 282056
£ 3 643082
£ 4 0438.21
£ 4 4886.41
£ 4 9823.92
£ 5 5304.55
£ 6 1388.05
£ 6 8140.74
£ 7 5636.22
£ 8 3956.20
£ 9 319139
£ 103442.44
£ -
£ -
Adjustment value GR ncreases over age of building
General repairs
15%
£ 119,991
£ 23998.11
£ 23998
£ 2 8797.73
£ 3 4557.28
£ 4 1468.73
£ 4 9762.48
£ 5 9714.98
£ 7 1657.97
£ 70941
£ 70232
£ 69530
£ 68834
£ 68146
£ 67465
£ 66790
£ 66122
Adjustment value 1-11% as PPM kcks in
various
Lfe cycle
59%
£ 471,963
£ -
£ -
£ -
£ -
£ -
£ -
£ 47,196
£ 5 6,635.54
£ 6 7,962.65
£ 8 1,555.18
£ 9 7,866.21
£ 117,439.46
£ 140,927.35
£ 169,112.82
£ 202,93538
£ 243,522.46
adjustment value not required
Grounds Manteance
11%
£ 87,993
£ 87,993.07
£ 87,993
£ 87,993
£ 87,993
£ 87,993
£ 87,993
£ 87,993
£ 87,993
£ 87,993
£ 87,993
£ 87,993
£ 87,993
£ 87,993
£ 87,993
£ 87,993
£ 87,993
£ -
maintenace cost
£ 799,937
£ 135,989.29
£ 135,989
£ 143,429
£ 152,118
£ 162,282
£ 174,186
£ 235,343
£ 261,173
£ 276,721
£ 295,085
£ 316,777
£ 342,408
£ 372,703
£ 408,527
£ 450,910
£ 501,080
£ -
estmated correct mantenace cost per annum
£ 799937.01
maintenace cost + energy
£ 207094.80
£ 207095
£ 214534
£ 223224
£ 233388
£ 245292
£ 306448
£ 332279
£ 347827
£ 366190
£ 387883
£ 413513
£ 443808
£ 479632
£ 522015
£ 572185
Years
0
3
6
9
12
15
18
21
24
27
30
Energy Old
£ 92431.20
£ 92431
£ 9 1506.89
£ 88789
£ 8 6151.92
£ 83593
£ 8 111032
£ 78701
£ 7 6363.76
£ 74096
£ 7 1894.96
Energy New
£ 71,106
£ 71,106
£ 71,106
£ 71,106
£ 71,106
£ 71,106
£ 71,106
£ 71,106
£ 71,106
£ 71,106
£ 71,106
PPM old
£ 55,372.07
£ 55,372
£ 5 8,140.67
£ 67,305
£ 7 7,914.06
£ 90,195
£ 8 3,59832
£ 77,484
£ 7 7,483.89
£ 77,484
£ 7 7,483.89
PPM New
£ 23,998
£ 29,568
£ 36,431
£ 55,305
£ 68,141
£ 103,442
£ 106,577
£ 109,806
£ 113,133
£ 116,562
£ 120,093
Gen rep Old
£ 15,597.77
£ 22,461
£ 3 8,812.23
£ 48,456
£ 5 1,422.21
£ 54,570
£ 5 7,909.76
£ 61,454
£ 6 1,454.30
£ 61,454
£ 6 1,454.30
Gen rep Old
£ 23,998
£ 34,557
£ 49,762
£ 70,232
£ 68,834
£ 66,122
£ 64,158
£ 62,253
£ 60,404
£ 58,610
£ 56,869
Lfe Cycle Old
£ 76689.01
£ 76689
£ 8 4357.91
£ 112280
£ 149445.19
£ 198912
£ 26475127
£ 352384
£ 469023.02
£ 624270
£ 830902.89
Lfe cycle new
£ -
£ -
£ -
£ 81555
£ 117439
£ 243522
£ 281908
£ 326343
£ 377783
£ 437331
£ 506266
Grounds Old
£ 57191.81
£ 57192
£ 5 7191.81
£ 57192
£ 5 7191.81
£ 57192
£ 5 719181
£ 57192
£ 5 7191.81
£ 57192
£ 5 7191.81
Ground New
£ 87993
£ 87993
£ 87993
£ 87993
£ 87993
£ 87993
£ 87993
£ 87993
£ 87993
£ 87993
£ 87993
0
0
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
Energy cost old
£ 92431
£ 92431
£ 92431
£ 92431
£ 92431
£ 91507
£ 90592
£ 89686
£ 88789
£ 87901
£ 87022
£ 86152
£ 85290
£ 84437
£ 83593
£ 82757
Energy cost new
£ 41704
£ 41704
£ 41704
£ 41704
£ 41704
£ 41704
£ 41704
£ 41704
£ 41704
£ 41704
£ 41704
£ 41704
£ 41704
£ 41704
£ 41704
£ 41704
Underspend
-£315,075
-£311,955
-£308,212
-£303,720
-£298,329
-£281,423
-£262,318
-£249,054
-£234,692
-£219,130
-£202,257
-£183,952
-£164,084
-£142,505
-£119,057
-£100,330
maintenace cost o
£ 2 97,282
£ 300,401
£ 304,145
£ 308,637
£ 314,028
£ 330,010
£ 348,200
£ 360,557
£ 374,023
£ 388,697
£ 404,691
£ 422,125
£ 441,132
£ 461,858
£ 484,461
£ 502,353
maintenace cost N
£ 1 59,518
£ 168,244
£ 178,438
£ 190,360
£ 204,324
£ 276,061
£ 306,360
£ 323,758
£ 344,484
£ 369,138
£ 398,437
£ 433,230
£ 474,532
£ 523,550
£ 581,725
£ 595,791
We measure how fit for purpose schools are using a Suitability Survey. The Suitability
Survey seeks to provide a measure of the extent to which a school building and its grounds
are appropriate in providing an environment which supports quality learning and teaching.
Other services provided to individual children and to the school community, in terms of
practicality, accessibility and convenience are also evaluated. The assessment is of the
school as a whole, its buildings and its grounds and of the impact these have on learning
and teaching, leisure and social activities. It also takes account of the health and well-being
of all users. Within this, we need to consider the different types of spaces within the school
and the different activities for which they are used.
A suitability survey was undertaken at CRHS in November 2016. The survey was undertaken
by interview with Department Heads and Section leaders across the school, to assess the
accommodation, and its impact on education. This report is included in Appendix A.
Name:
[DESC Off]
Title:
[DESC Off]
Date:
Signature:
Name:
[DESC Off]
Title:
[DESC Off]
Date:
Signature:
current
Required for 7 forms
shortfall
2 Art classrooms (too small)
3 large Art rooms
1 Art room
Kiln room
Kiln room
1 shared Art/DT workshop
1 photography room
1 photography room
1 small installation room
2 installation rooms
1 resistant materials
workshop and Heat treatment
area
2 workshops, plus one for
level 2 engineering
1 engineering workshop
1 graphics room
1 graphics room
1 electronics room
1 large electronics room
Large room
1 small Food technology
room
2 Food rooms
1 food room
1 small textiles room
1 large textiles room
Size of room
5 labs
9 labs
4 labs
2 small labs downstairs
1 staff work room/office
1 staff workroom/office
1 prep room
2 prep and chemical storage
rooms
1 prep room and chemical
store
2 teaching rooms
2 rooms
1 computer Science room
1 room for computing
1 office
5 teaching rooms
7 teaching rooms
2 teaching rooms
I office
1 office
6 classrooms
7 classrooms
1 classroom
1 seminar room
1 seminar room
1 teacher workroom
1 teacher workroom
2 Music classrooms
2 Music classrooms
1 Drama room plus
performance area
2 drama rooms
1 drama room
3 Music practice rooms
3 Music practice rooms
1 Music store
1 Music store
1 office
1 office
2 Geography classrooms
2.5 Geography classrooms
1 shared room
2 History classrooms
2.5 History classrooms
1 RS classroom
2 RS classrooms
1 room
2 shared classrooms
1 PSHE classroom
1 PSHE classroom
2 German classrooms
2.5 German classrooms
2 French classrooms
3 French classrooms
1 room
1 Manx classroom
1 room
1 classroom for Careers,
citizenship,
lifeskills/ASDAN
1 room
1 gym
1 gym
1 Sports Hall
1 sports hall
1 Fitness room
2 fitness rooms
1 fitness room
1 classroom for theory/exam
PE
1 classroom
2 unit classrooms
2 unit classrooms
1 support for learning
base/teaching area
2 bases – 1 for KS4 and 1 for
KS3 students
1 base for vulnerable
students
1 small room for ‘chill’
Proper room for children
with ASD
1 room for students on ASD
1 office for S4L
2 offices
1 office
2 teaching rooms (1 below
stage so not in use during
exams)
3 teaching rooms for specific
withdrawal courses
1 teaching room
1 store used as isolation room
1 room for listening service
etc
1 meeting room for parents
1 meeting room
3 classrooms (Psychology,
Economics, Sociology,
Business education, H&SC
etc)
5 classrooms
2 classrooms
2 study/exam rooms
3 study/exam rooms
1 study/exam room
1 communal area built for 90
2 communal areas or larger
than existing
1 communal area
1 small careers resource
room
1 careers room
1 seminar room
2 seminar rooms
1 seminar room
1 lecture theatre seats 90
Larger lecture theatre or
additional lecture theatre
1 lecture theatre
R
Y1
Y2
Y3
Y4
Y5
Y6
Ballaugh
5
11
7
11
11
10
9
Bunscoill
9
10
15
5
9
7
14
Foxdale
15
7
10
9
5
4
10
Marown
27
25
30
29
32
24
39
Michael
19
17
20
10
19
16
14
PCW
59
69
73
53
44
55
41
St John’s
22
24
27
24
21
19
27
Total
156
163
182
141
141
135
154
Weighting
Transparency as to the range of factors taken into account when
considering the business case.
2
Weighting
Information disclosure could risk the security of a public school facility,
which is not in the public interest.
4
1.3 Part 1(c): Bids etc.
In relation to part 1(c) of your request, the Treasury applied an absolute exemption to
disclosure under section 20 of the Act (information accessible to the applicant by other
means).
The internal review has concluded that the exemption to disclosure under section 20 of the Act
was correctly applied by the Treasury as the information requested is already reasonably
accessible.
However, whilst the original response to you provided you with a link to the most recent
version of the Isle of Man Detailed Government Accounts, it may also have been helpful to
provide you with a link that would have enabled you to access the Accounts that have been
published over the period of the capital programme schemes within which you have an
interest.
I am pleased to now provide that link, which will enable you to access the Accounts for each of
the relevant years –
Government Accounts
Weighting
Transparency relating to the DESC’s likely future expenditure.
3
Transparency as to the redevelopment vision for two key schools in the
Island.
4
Weighting
Ensuring that the DESC are getting value for money when undertaking
public procurement. It is not in the public interest for information to be
disclosed that could adversely impact the ability of the Department to
achieve value for money.
5
The particular information will be of interest to a limited group of
individuals, stakeholders and businesses, but is unlikely to be of general
public interest.
1
Need to ensure that commercial activities, including the procurement
process, are conducted in a fair way.
4
The exemption is time sensitive. At the point in time the tender exercises
are complete, and an organisation has been appointed to undertake the
work, it may be possible to disclose the information.
3
Weighting
Disclosure would provide more transparency as to the two schemes and
would enable increased public scrutiny.
3
Disclosure would enable interested parties to better understand the vision
of the Department for the capital projects and thus would inform public
debate on these visions.
4
Weighting
A decision that undermines a process established by the Treasury in
accordance with its statutory responsibilities would damage public
confidence in the Treasury and its delivery of these statutory
responsibilities.
3
The Treasury, in the exercise of its duty to protect public finances, deems
this information to be commercially sensitive and therefore has taken steps
to redact it from the IoM Budget. Disclosure would undermine the policy
position of the Treasury.
4
The information will be of interest to a limited group of individuals,
stakeholders and businesses, but is unlikely to be of general public interest.
1
The exemption is time bound and only applies to the information because of
the stage the two schemes are at in their development.
3
Full Response Text
CRHS Business Case - Appendix A
001
December 2016
Contents
ϭ͘ Introduction
Ϯ͘ Suitability survey results
Administration
English
Science
Maths
Languages
Geography
History
6th Form
ICT
Art
D&T
Drama
Music
Library
PE
SEN
Corridors
Catering
Site
ϯ͘ Building zones
ϰ͘ dƌĂĨĨŝĐ
ϱ͘
ϲ͘ Conclusion
Appendix 1 – Methodology
2
[Arch]
ϭ͘
/ŶƚƌŽĚƵĐƚŝŽŶ
This Suitability Study has been undertaken to inform the business case for the replacement
of the existing school.
The study considers the suitability of the principal spaces with in the school building in terms
of their effect on teaching, moral and behaviour.
The methodology behind the study is attached as Appendix 1.
Ϯ͘
^ƵŝƚĂďŝůŝƚLJ ^ƚƵĚLJ ZĞƐƵůƚƐ
dhe report ƌesults Ăƌe seƚ ouƚ below by department/use.
3
Spaces
Direct Impact on Education
H & S/
Security
Disabled
Access
Comments
Typ
Category
School
Room
Ref
Room Asset
Code
Size/Shape
Environment
Location
Fixed
Furniture
ICT Infrastructure
A
B
C
D
High
Medium
Low
Yes
No
Admin
corridor
A103
0
0
0
0
0
Storage of items awaiting pickup due to lack of storage.
Doors off to accommodation are narrower than required by current legislation.
General
office
A105
1
Awkward shape for furniture layout.
1
Cold in winter as door to reception is open due to restricted layout.
0
0
1
Lack of data and power sockets.
Storage of items awaiting pickup due to lack of storage.
Access doors are narrower than required by current legislation.
Office
A106
0
2
No direct daylight or natural ventilation.
0
0
0
Electronic door lock due to storage of sensitive information.
Access doors are narrower than required by current legislation.
5
Spaces
Direct Impact on Education
H & S/
Security
Disabled
Access
Comments
Typ
Category
School
Room
Ref
Room Asset
Code
Size/Shape
Environment
Location
Fixed
Furniture
ICT Infrastructure
A
B
C
D
High
Medium
Low
Yes
No
Male staff
toilet
A107
0
0
0
0
0
Small room with inadequate space for materials and personnel.
1
Minimal mechanical ventilation. Hot in summer.
0
0
0
Congested space.
Access door is narrower than required by current legislation. No space to manoeuvre.
Store
A109
0
0
0
0
0
Narrow door width does not comply with current requirements for wheelchair access.
6
Spaces
Direct Impact on Education
H & S/
Security
Disabled
Access
Comments
Typ
Category
School
Room
Ref
Room Asset
Code
Size/Shape
Environment
Location
Fixed
Furniture
ICT Infrastructure
A
B
C
D
High
Medium
Low
Yes
No
Office
A110
0
0
0
0
0
Narrow door width does not comply with current requirements for wheelchair access.
Female
staff toilet
A111
0
0
0
0
0
Narrow door width does not comply with current requirements for wheelchair access.
7
Spaces
Direct Impact on Education
H & S/
Security
Disabled
Access
Comments
Typ
Category
School
Room
Ref
Room Asset
Code
Size/Shape
Environment
Location
Fixed
Furniture
ICT Infrastructure
A
B
C
D
High
Medium
Low
Yes
No
Disabled
toilet
A113
0
0
0
0
0
Narrow door width does not comply with current requirements for wheelchair access.
Deputy
Head’s
office
A114
0
0
0
0
0
Narrow door width does not comply with current requirements for wheelchair access.
Head
Teacher’s
office
A115
1
Narrow door width does not comply with current requirements for wheelchair access.
8
Spaces
Direct Impact on Education
H & S/
Security
Disabled
Access
Comments
Typ
Category
School
Room
Ref
Room Asset
Code
Size/Shape
Environment
Location
Fixed
Furniture
ICT Infrastructure
A
B
C
D
High
Medium
Low
Yes
No
Office
A116
0
1
Area generally lacking heating.
2
No disabled access from main school accommodation.
0
0
Access door is narrower than required by current legislation. Access for wheelchair bound person
requires them to exit the school and re-enter adjacent to this room due to stairs in corridor from
admin area
Corridor
A119
0
0
2
No disabled access from main school accommodation.
0
0
No disabled access from within main school building.
Office
Listening
A120
0
0
2
No disabled access from main school accommodation.
0
0
Narrow door width does not comply with current requirements for wheelchair access.
9
Spaces
Direct Impact on Education
H & S/
Security
Disabled
Access
Comments
Typ
Category
School
Room
Ref
Room Asset
Code
Size/Shape
Environment
Location
Fixed
Furniture
ICT Infrastructure
A
B
C
D
High
Medium
Low
Yes
No
Toilet
A122
0
0
0
0
0
No disabled toilet provision on this level.
Medical
room
A124
0
1
Area generally lacking heating.
2
No disabled access to medical room without having to exit the main building and re-enter.
0
0
Access door is narrower than required by current legislation. Access for wheelchair bound person
requires them to exit the school and re-enter adjacent to this room due to stairs in corridor from
admin area.
Corridor
A125
0
0
0
0
0
10
Spaces
Direct Impact on Education
H & S/
Security
Disabled
Access
Comments
Typ
Category
School
Room
Ref
Room Asset
Code
Size/Shape
Environment
Location
Fixed
Furniture
ICT Infrastructure
A
B
C
D
High
Medium
Low
Yes
No
Staffroom
A127
1
Not sufficiently large to comfortably allow full staff meetings.
0
1
Remote from remainder of school. Not heavily utilised.
0
1
Lack of data and power outlets.
Narrow door width does not comply with current requirements for wheelchair access.
Stair
Aϭ25
0
0
0
0
0
No disabled access to the upper floor meeting rooms.
Kitchen
A461
0
0
0
0
0
Narrow door width does not comply with current requirements for wheelchair access.
11
Spaces
Direct Impact on Education
H & S/
Security
Disabled
Access
Comments
Typ
Category
School
Room
Ref
Room Asset
Code
Size/Shape
Environment
Location
Fixed
Furniture
ICT Infrastructure
A
B
C
D
High
Medium
Low
Yes
No
Conference
room
A462a
0
?
2
No disabled access to this level.
0
?
No disabled access to this level.
Meeting
room
A426
0
?
2
No disabled access to this level.
0
?
No disabled access to this level.
12
Synopsis –
Initial impression of school entrance area is of sporadic clutter and of the reception area being primarily a circulation space – access to dining, main
hall, administration area and upper floor all from the reception/entrance space.
The main school entrance is used for reception of visitors, staff, students, deliveries of stationery and frozen food for the kitchen.
There is no dedicated visitor meeting room, with the result that visitors are taken to the far end of the admin area, past offices and potentially
sensitive areas.
The primary meeting and conference rooms are on the first floor in an area not served by lift and thus not readily accessible by the disabled.
There is a marked and severe lack of storage for files and records in the administration area resulting in filing cabinets and other storage vessels being
located in corridors throughout the school.
13
Castle Rushen High School
Accommodation suitability study
Survey Form
Assessment Date 10th November 2016
English
Assessed by -
School rep –
Spaces
Direct Impact on Education
H & S/
Security
Disabled
Access
Comments
Type
Category
Unique
Room
Ref
Room
Designation
Code
Size/Shape
Environment
Location
Fixed
Furniture
ICT
Infrastructure
A
B
C
D
High
Medium
Low
Yes
No
Class 1
R151
2
Room size well below recommended standard class area (BB98)
1
Lighting poor.
0
2
Student lockers in classroom, reduce space, access difficulties, lack of use.
0
0
Lockers access and lack of space for disabled
Narrow door does not comply with current requirements.
Class 2
H304
1
Room area marginal.
0
0
0
0
Narrow door does not comply with current requirements.
14
[Arch]
[Arch]
[DESC Off]
Spaces
Direct Impact on Education
H & S/
Security
Disabled
Access
Comments
Type
Category
Unique
Room
Ref
Room
Designation
Code
Size/Shape
Environment
Location
Fixed
Furniture
ICT
Infrastructure
A
B
C
D
High
Medium
Low
Yes
No
Class 3
R161
2
Room size well below recommended standard class area (BB98)
0
0
2
Student lockers in classroom, reduce space, access difficulties, lack of use.
0
Lockers access and lack of space for disabled
Narrow door does not comply with current requirements.
Class 4
R163
1
Room area marginal.
0
0
2
Student lockers in classroom, reduce space, access difficulties, lack of use.
0
Lockers access and lack of space for disabled
Narrow door does not comply with current requirements.
Office
5
R167
0
0
0
0
Narrow door does not comply with current requirements.
0
15
Spaces
Direct Impact on Education
H & S/
Security
Disabled
Access
Comments
Type
Category
Unique
Room
Ref
Room
Designation
Code
Size/Shape
Environment
Location
Fixed
Furniture
ICT
Infrastructure
A
B
C
D
High
Medium
Low
Yes
No
Class 6
R181
2
Room size well below recommended standard class area (BB98)
0
0
2
Student lockers in classroom, reduce space, access difficulties, lack of use.
0
Lockers access and lack of space for disabled
Narrow door does not comply with current requirements.
Class 7
R183
1
Room area marginal.
0
0
2
Student lockers in classroom, reduce space, access difficulties, lack of use.
0
Lockers access and lack of space for disabled
Narrow door does not comply with current requirements.
Synopsis –
All classrooms below areas recommended by BB 98.
Issue exacerbated by the location of student lockers in most of the classrooms. These are generally unused as access and space around them is very
restricted.
All rooms in close proximity.
Narrow corridors outside all rooms.
16
Castle Rushen High School
Accommodation suitability study
Survey Form
Assessment Date 8th November 2016
Science
Assessed by -
School rep –
Spaces
Direct Impact on Education
H & S/
Security
Disabled
Access
Comments
Type
Category
Unique
Room
Ref
Room
Designation
Code
Size/Shape
Environment
Location
Fixed
Furniture
ICT
Infrastructure
A
B
C
D
High
Medium
Low
Yes
No
Lab 1
L405
0/1
Room area marginal.
1
No blackout provision limits experiments. Mechanical vent.
2
At extreme end of ‘string’ of science labs, poor relationship to resources and Science staff facilities.
Lack of prep room.
1
Fixed furniture layout restricts flexibility and supervision.
Fume cupboards against wall limits visibility of experiments by students.
0
WIFI enabled
Single means of escape from room
Narrow door does not meet current requirements. Access by way of poor quality lift opening directly into Lab 2
Lan 1x
L407
0/1
Small group room.
0
2
At extreme end of ‘string’ of science labs, poor relationship to resources and Science staff facilities.
0
0
WIFI enabled
Single means of escape from room if used for experiments.
Narrow door does not meet current requirements. Access by way of poor quality lift opening directly into Lab 2
17
[Arch]
[Arch]
[DESC Off]
Spaces
Direct Impact on Education
H & S/
Security
Disabled
Access
Comments
Type
Category
Unique
Room Ref
Room
Designation
Code
Size/Shape
Environment
Location
Fixed
Furniture
ICT
Infrastructure
A
B
C
D
High
Medium
Low
Yes
No
Lab 2
L406
0/1
Room area marginal.
1
No blackout provision limits experiments. No mechanical vent.
1
Poor relationship to Science staff facilities.
1
Fixed furniture layout restricts flexibility and supervision.
Fume cupboards against wall limits visibility of experiments by students.
0
WIFI enabled
Ramped floor at main access to lab. Second escape through chemical store/prep room.
Access by way of poor quality lift opening directly into Lab 2
Lab 2x
L404
0/1
Small group room set up as computer room.
1
Poor ventilation
1
Poor relationship to Science staff facilities.
0
0
Narrow door does not meet current requirements. Access by way of poor quality lift opening directly into Lab 2
Prep 2/3
L408
0
1
Poor ventilation
0
0
0
Lab 3 and 4 second means of escape is through the prep area, potentially impeded by furniture and equipment.
Narrow door does not meet current requirements. Access by way of poor quality lift opening directly into Lab 2
18
Spaces
Direct Impact on Education
H & S/
Security
Disabled
Access
Comments
Type
Category
Unique
Room Ref
Room
Designation
Code
Size/Shape
Environment
Location
Fixed
Furniture
ICT
Infrastructure
A
B
C
D
High
Medium
Low
Yes
No
Lab 3
L410
0/1
Room area marginal.
1
No blackout provision limits experiments. No mechanical ventilation.
1
Poor relationship to Science staff facilities.
1
Fixed furniture layout restricts flexibility and supervision.
Fume cupboards against wall limits visibility of experiments by students.
0
WIFI enabled
Second means of escape through chemical store/prep room.
Narrow door does not meet current requirements. Access by way of poor quality lift opening directly into Lab 2
Lab 4
Lϰ14
0/1
Room area below norm.
1
No blackout provision limits experiments. Mechanical vent.
1
Poor relationship to Science staff facilities.
1
Fixed furniture layout restricts flexibility and supervision.
Fume cupboards against wall limits visibility of experiments by students.
0
WIFI enabled
Second means of escape through chemical store/prep room.
Access by way of poor quality lift opening directly into Lab 2
19
Spaces
Direct Impact on Education
H & S/
Security
Disabled
Access
Comments
Type
Category
Unique
Room Ref
Room
Designation
Code
Size/Shape
Environment
Location
Fixed
Furniture
ICT
Infrastructure
A
B
C
D
High
Medium
Low
Yes
No
Prep 4/5 Lϰ16
0
1
Poor ventilation
0
0
0
Lab 3 and 4 second means of escape is through the prep area, potentially impeded by furniture and
equipment.
Room layout makes use and access difficult.
Lab 5
Lϰ20
0/1
Room area marginal.
1
No blackout provision limits experiments. Mechanical vent.
1
Poor relationship to Science staff facilities.
1
Fixed furniture layout restricts flexibility and supervision.
0
WIFI enabled
Second means of escape through chemical store/prep room.
Access by way of poor quality lift opening directly into Lab 2 at far end of science ‘string’ of rooms
Lab 6
Lϰ4Ϯ
0/1
Room area marginal.
1
No blackout provision limits experiments. Mechanical
[Response truncated — full text is 307,492 characters]