A request was made for reports, correspondence, design cases, and financial details regarding the proposed new Castle Rushen High School in Castletown. The Department of Education, Sport and Culture disclosed the strategic brief but withheld cost estimates and option appraisals under a commercial interests exemption to protect the upcoming tendering process.
Key Facts
- The request was received on 26 July 2021 and the response was issued on 23 September 2021.
- The Department disclosed the Castle Rushen High School (CRHS) strategic brief.
- Cost estimates and option appraisals were withheld to prevent prejudice to the commercial tendering process.
- The Department argued that disclosure could impact the Government's ability to achieve value for money.
- The outcome of the case was upheld as 'full' on 14 March 2022.
Data Disclosed
- 26 July 2021
- 23 September 2021
- 18th Dec 2018
- 14 March 2022
- section 30 (2) (b)
- 2021/22 budget
- 709 pages
- 22 documents
Exemptions Cited
- Section 30 (2) (b) of the Act (Commercial interests)
Original Request
With reference to the proposed new CRHS I seek the following information: Further to the DESCs Minister's statement in the House of Keys 18th Dec 2018 (www.tynwald.org.im/business/OPHansardIndex1821/2876.pdf#search = %22castletown%22) on the subject of the progress with regard to the new school in Castletown, I request a copy of the finalised reports referred by him to in his response to Mr Moorhouse's question; and Copies of all correspondence, relevant extracts from minutes of meetings and any other information relating to the 'early dialogue with Treasury to ensure that the project is ultimately allocated an appropriate budget'; A copy of any design and business case(s) compiled as part of the new school project; Details of financial expenditure incurred to date regarding the new school, broken down by cost area e.g. ground works, design fees etc; Details of such financial expenditure as has been approved but which is yet to be incurred; Such information as is held relating to commencement of the building works for the new school building(s), and current estimated timeframe for the project (including key milestones).
Data Tables (415)
| Notional 5 form entry | 11-16 (years 7 – 11) | Post 16 (years 12 – 13) | Total | ||
|---|---|---|---|---|---|
| Student numbers | 750 | 250 | 1,000 | ||
| Net areas | |||||
| Gross areas (GIFA) |
| BB98 baseline | Running total | |
|---|---|---|
| SEN | ||
| Additional specialist brief | ||
| Additional sports/PE brief | ||
| Central spaces | ||
| Collaboration spaces | ||
| BENCHMARK GIFA GIFA FROM SOA |
| ICT Element | Funding | Procurement Process |
|---|---|---|
| Management Information System (MIS), School office equipment e.g. PC, Printer, prior to opening | DfE Project Development Grant | School choice |
| Broadband installation and first year of service in permanent and any temporary sites | DFE Capital Funding Approval Letter (broadband) | School choice after providing DFE with three quotes |
| Passive network (cabling) | DFE Capital Funding Approval Letter (construction) | DFE to manage as part of the construction project |
| Servers and network equipment | DFE Capital Funding Approval Letter (ICT) | School to procure partner supported by DFE |
| User devices, classroom AV, software and peripherals | ||
| Educational consultancy on ICT and staff training | ||
| Initial technical support | ||
| Additional costs for moving equipment from any temporary to permanent sites | ||
| On-going technical support beyond the initial period | School Budget (Revenue) | School choice |
| Technical support Ongoing software licensing Renewal and replacement | School Budget (Revenue) | School choice |
| End Q219 | DESC/Treasury agreement on scope/budget |
|---|---|
| End Q319 | Design team appointments in place |
| End Q120 | Detailed brief and feasibility scheme; D1 complete. New pitches enabling phase – construction start |
| End Q320 | I1 complete/planning submitted. New pitches enabling phase – construction complete |
| End Q121 | Planning approval |
| End Q221 | Interim I2/1st stage tender |
| End Q321 | New pitches established and playable |
| End Q421 | 2nd stage tender. I2 and I3 complete |
| End Q122 | Motion to Tynwald/construction start |
| End Q324 | Phase 1 build complete/new school open |
| End Q325 | Phase 2 demolition/externals/sports facilities completed |
| Prrioiorr too M Mititigigaattioionn | Poosstt M Mititigigaattioionn | ||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| RRisiskk | RRisiskk D Deessccrpipttoionn / | PPorobbaabbiltiyty | mImppaacctt | RRisiskk R Raattningg | AAcctitoionn | AAcctitoionn | PProrobbaabbiltiyty | mImppaacctt | RRisiskk R Raattningg | ||||||
| RRisiskk DID | Caateteggooryry | Titiltele | NNaararatitvivee | Coonnsseeqquueenncceess R | Risi k O Owwnnerr | SSttaattuuss | 1(1 - 5)) | 1(1 - 5)) | AAuutotoCCaall | MMitiitgigaatitnngg A Acctitoionn | OOwwnneerr | DDaatete/ /U Uppddaatete P PMM | 1(1 - 5)) | 1(1 - 5)) | AuutotoCCaall |
| 1 | SSttarateteggcic | Accaaddeemmcic SSttarateteggyy | AAccaaddeemmicic S Sttarateteggyy noot t suupppoorretedd | Prorojejecct t deelalayyeedd o or r caanncceelleledd | Clileienntt | OOppeenn | 1 | 5 | 5 | Accaaddeemmcic S Sttarateteggyy sis beeiningg sstrterennggttheenneedd o addddreressss BCC | 011//0044//22001199 | 1 | 33 | 33 | |
| 2 | SSttarateteggcic | Porojejecct t SSppoonnssoorr | Chhaannggeess oo Porojejecct t SSppoonnssoorr | Porojejecct t ol seess sppoonnssoorsshhp thorouugghh ninteternaal l ggoovveernaannccee prorocceess | Clileienntt | OOppeenn | 3 | 33 | 9 | Enssuurere ereggualar r Prorojejecct t Exxeecc mmeeeetitninggss a aere heeldld, , eaaryly aapppooinintmtmeennts ofor rm meeeetitninggss o bee puut t nin diaiarireiess | 011//0044//22001199 | 22 | 22 | 44 | |
| 3 | SSttarateteggcic | Accaaddeemmcic SSttarateteggyy | AAccaaddeemmicic S Sttarateteggyy ss noot t ereaalsiseedd | Porojejecct tB Beenneeffists noot t ereaalsiseedd | Clileienntt | OOppeenn | 3 | 44 | 122 | BBeenneeffists Plalann oto bee deevveelolopeedd cc//ww m meeaassuurarabblele anndd itmimee-- ccoonnsstrtarainineedd ouutccoommeess | 011//0044//22001199 | P2 | 33 | 6h6 | |
| 44 | Maannaaggeemmeenntt | DDeefifniniitonn | Poooor r rtarannsslalatitonn of f AAccaaddeemmicic S Sttarateteggyy ninto phhyyssiccaal ls sppaaccee ereqquuiieremmeenntsts | Buuidldiningg sis ovveer r or r unddeer r sizizeedd theererefoforere mimpaacctitningg onn oppeearat onnss anndd//oor r fninaanncceess | Clileienntt | OOppeenn | 44 | 44 | 166 | Accaaddeemmcic sppaaccee ereqquueesststs neeeedd chhaallelenngginingg anndd ccoonnvveerretedd ninto ann A Arereaa SScchheedduuele o ninfoformm d deessiggnn | 011//0044//22001199 | 33 | 44 | 122 | |
| 5 | Maannaaggeemmeenntt | Funncctitoionnaall | Faaiiuluere oo s saatitsisfyfy peerroformmaannccee exxppeecctatatitoonnss of f afacciiltiyty . | Coommpprorommsiseedd oppeerarat onnss | Clileienntt | OOppeenn | 2 | 22 | 44 | UUnnddeerratakkee suuffccieennt t sstatakkeehhooldldeer re ennggaaggeemmeennt t throrougghh breieffningg a anndd deessiggnn sstataggeess.. | 011//0044//22001199 | 1 | 22 | 22 | |
| 6 | Maannaaggeemmeenntt | Laatete Coommppleletitoon | DDeelalayy o aggrereeedd ccoonsstturuccttoonn proroggrarammmmee eressuullitningg nin deelalayyeedd haannddoovveer rd daatete | Deelalayyeedd oppeerarattoonnaal l statatutuss | Clileienntt | OOppeenn | 2 | 33 | 6 | CCoonntitninggeennccyy palannss o bee ddeevveeoloppeedd anndd c coonntitninggeennccyy peeroodd o bee allolowweedd w witihthinin hthee proroggrrammmmee | 011//0044//22001199 | 1 | 33i | 3c3 | |
| 7 | Maannaaggeemmeenntt | Proroggarammmmee | UUnnaabblele o acchhieievvee SSeepptetemmbeer r 2002244 oppeennningg | Deefeferrreredd o or r paarr t oppeenniningg duuee oto deelalayyss w witith appppooinintitningg deessiggn eteaamm | Clleienntt | OOppeenn | 2 | 5 | 10c0a | MMaainintatainin poroggrarammmmee daatetess cof or ra ap oainidemtmmeiencn tS to ofr fd tdeegsiyg nn eteaamm . | 0r1 1//0044//22001199 | 22 | 33 | 66 | |
| 8 | Maannaaggeemmeenntt | nInteternaal l aapppprorovvaalsls | Faaiulurere oto proroggreressss ggaatetewwaayyss throrouugghh ggoovveernaannccee anndd aapppprorovvaal ls syysstetemm o ssuuppppoorr t ereqquuiieredd poroggrarammmmee | DDeelalayy | Clileienntt | OOppeenn | 44 | 5 | 200 | Aggrereee prorogSgaomnmsmoere anndd theenn DDESSCC ninteternaal la apppprorovvaalsls ereqquuiieredd oo s suupppoorr t thisis | 011//0044//22001199 | 33 | 5 | 15 | |
| 9 | Leeggaall | Coonnsstturucctitoon onntrtaracctt | RReedduucceedd abbiiltiyty oto ninppuut t nintoo buuidldiningg onnttraacct t anndd coonnsstturucct onn eteaamm | Reedduucceedd deessiggnn ninflfulueennccee | Clileienntt | OOppeenn | 2 | 22 | 44 | SSeeeekk clalartiyty nin eaaryly eleggaal l neeggoot attoonnss | 011//0044//22001199 | 22 | 22 | 44 | |
| 100 | Fininaanncciaal | Afofordrdaabbiiltiyty | Prorojejecct t sis noot t affoforrdaabbele w witithnin alloteedd funnddiningg eennvveeloloppee | Prorojejecct t ere-sccoopeedd, , deelalayyeedd o or r caanncceelleledd | Clileienntt | OOppeenn | 5 | 5 | 255 | EnggaagAgemamdeenm t wci tiStht aActcaeadgdeyem mcic eleaadd ianntod pdehessyisgncn ete asamma eo eennssuuere requirements arere cchhaalelennggeedd a anndd exxppeecctatatitonnss mmaanaaggFeeaddi | 011//0044//22001199 | 44 | 5 | 2200 |
| RRRiiRssRRiskkiiisks s k kk | DRRiRiirRssRReiskkiciisks s tDDk kk D pee DDDessreosececsjcsrsreciirccppcrirrptittiipiipp toocitttoninoiiooon//s n nn/t /s// | (1 - 5) PPPrrPooPPrrobbrrooobaabbbabbabaaiilblbbiiitltiiiiylytlliiiytttyyy | (1 - 5) IImmImIIIpmpmmpaapppaccacatatctccttt | AutoCal RRRiiRssRRiskkiiisks s RRk kkR aa RRRattiaitaannitttngigiinnngggg | Appropriate budget setting | AAAccAAActticitccooitttoniniiooon nnn | AAAccAAActticitccooitttoniniiooon nnn | (1 - 5) PPPrrPooPPrrobbrrooobaabbbabbabaaiilblbbiiitltiiiiylytlliiiytttyyy | (1 - 5) IImmImIIIpmpmmpaapppaccacatatctccttt | AutoCal RRRiiRssRRiskkiiisks s R Rk kk R aa R R Rattiaitaannitttngigiinnngggg | |||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| RRRiiRssRRiskkiiisks s IIkD kkDI D IIIDDD 11 | CCCaaCCCatteaetaaegtgttegeeoogggorroyyoorryrryyy Financial | CapTTiTtiitTtaTTillteieliilt ttelclleeeosts | hNNiNagaNNNarrharrraaeaarrrrrrattrriai taavvtitttheveiiivevvaeeen budgeted Indirect project | ICCnCoocCCConrnoeoonssnannseessesqsqeeqeeuuq qqueeiunuuenne neeccDnnnceecEecscseSseesssC RR capital budget | RiiRRsRsiiskkiisssk kOOkk O wwOOOwwnnwwneennnerreeer Client | rSrrSSttSSSaattattttaauauttuttssuuussss Open | 2 ((11(1 ( ((--1 11 -5 5 ---5)) 5)55))) | 4 ((11(1 ( ((--1 11 -5 5 ---5)) 5)55))) | 8 AAAuuAAAuttooutuuoCCtttoCooaaCCCallalaalll | MMMiiMtMMtiiitgigiiitttgaiaiigggattiaitaannitttngigiinnng AgAgg A cc AAActticitccooitttoniniiooonnnn and contingency required to allow for unforeseen costs Early negotiations to support | OOOwwOOOwnnwwwneennnerrereerrr | DDDaaDDDatt0eaetaae/t1/tt eU/eeU/ /0U// pp UUU4pddp/ppdaad2ddatteae0taae t 1ttPPe ee9P MM PPPMMMM | 2 ((11(1 ( ((--1 11 -5 5 ---5)) 5)55))) | 3 ((11(1 ( ((--1 11 -5 5 ---5)) 5)55))) | 6 AAAuuAAAuttooutuuoCCtttoCooaaCCCallalaalll |
| 12 111111111111 | Financial FFFiinFnFiFniaaiinnnannaaanccnnniciaaciccaliliiaaallll | Revenue costs CCCaaCCCappaaapiipttppiaatiiitalltt a aalcc lllo co cocscsootostssstsststtsss | DDDiiDrcrDDieeoriiireccrrseteecttc stccppt tt prhr poopprirgojjrroeeoohjjeccjjeeteectrc tcc cct ttto coh cocscsaootostnssstsst s tts ss hhhiihggbhhigihhuiigggheedhhherrge eertter rrhh tt thaeatthhhandnaaan nnn bbbuubbbudduuudggdddgeegggetteeeeetteddtteeedddd | Higher long term IInnIInccIInnnrcrfcieerccnreaarreaeeassanaeasesce ss eieiee nn i ni c iinDDnn o D E sEDDDEtSSEsEESCCSSSC CCC ccacacacpcpaaapiipttppiaatiiitalltt a aalbb lll buu bbbudduuudggdddgeegggetteeetttt | Client CCCllCiiCCleeillelniniieeenttnnntttt | Open OOOppOOOpeepppenneeennnn | 2 222222 | 4 444444 | 8 A 888888 aa aa | appropriate budget setting, AAppAAAppppppprrpoopprropprroooprrpiippraarirratitiiaeeaatte ttebbee buu bbbudduuudggdddgeegggette eetsst tte se setsstetteetiittnntttittniggiinnng ggg contingency and monitoring annaaanddnnnd dccdd o co cocncnooonttniinntnntittniggiinnngeegggenneeenccnnnycycy cc yrryy ee r reqqrreeequuqqquiiurruuieeriiireddrreeed dttdd oo t to ttooo thereof alllalaaloolllolwlwllooow wwwff oo f forrffo ooruur rr unn uuunffnoonnfforrffoeeoorressrreeeeseseesseeeeenneeen nccnn o co cocscsootostssstsststtsss | 01/04/2019 000110001//10011//044//0004//42244//200//2220110001991119999 | 2 222222 | 3 333333 | 6 666666 | |
| 111221112222 13 | FFFiinFnFiFniaaiinnnannaaanccnnniciaaciccaliliiaaallll Financial | RRReeRRRevveeeveevvvenneeenuunnnueeuuue eccee o co cocscsootostssstsststts Equipment Costs | IInnIInddIInnndiidrrddieeriiireccrreteectc tccppt tt prr poopprrojjrroeeoojjeccjjeteectc tcct tt ssRccocoiscocscskootost ssstssot s tthfsh ss hiie hgghhisgihhiigcggheeahhherrle aeerttr trrhh ti thoaatthhhannnaaan ninn n fit obubbuutb bbuddauuudggndddgeedgggett eeeeetbteddtteeeedsdddpoke | Increased project cHHoHiiHsggHHitgihhiigsgghee hhhwerre eerillr toorr lh onlnllo oonggpnnng ogttgg tee t eterrttenmmeerrmtrrm i mma l fffiifonnfiffrniaaiin nnannianaanccnsnneceuce cc eccfee fo coi ccocscsoiotostessstssntsttstss standard or | CCCllCiiCCleeillelniniieeenttnnntttt Client | OOOppOOOpeepppenneeen nnn Open | 222222 3 | 444444 2 | EE aa 888888 cc 6 tt | EaaEEEarrallaaryyrlrry l llynnyy nee nnneggeeegoogggottoiiootaatittatitiiaiiaatootittoniniiooonssnnn s tst ssoo t to ttossoo u su sussppuuupppppppooppporrottoor rtrrt tt appaaappppppprrpoopprropprroooprrpiippraarirratitiiaeeaatte ttebbee buu bbbudduuudggdddgeegggette eetsst tte se setsstetteetiittnntttittniggiinnng,,g gg,, ,, ocDococncneooontttniinntenntittrniggiimnnngeegggenineneenccnennycyc y cc wyaayy anhn aaandadnnndt dm mdd e m moqommonunoooniiintptnniootimiitorrttoiioorennrirrnniggiintnng ggg i s hhtntheettehhherreeeeeerdreoorreeeeoffodooff fffrom the design | 000110001//10011//044//0004//42244//200//2220110001991119999 01/04/2019 | 222222 2 | 333333 2 | 666666 4 | |
| 111331113333 14 | FFFiinFnFiFniaaiinnnannaaanccnnniciaaciccaliliiaaallll Financial | EEEqqEEEquuqqquiiuppuuipimmiipppmmeemmenneeenttn nntt tt CCCooCCCossootostssstsststtsss Affordability | equipment costs cc RRRiiRssRRikskiiisk ss kookk off o oofeef ff ess eceescsacasscaclclaaaaalatltllaiiaatootittoniniiooon niinn nn i ni iinnn Extent ofsite ffiifttfi fftiooiit tt ouu ooouttu uutaat tt ann aaanddnnnd dbbdd bee bbbessepeespspssoopppokkoookeekkke eee remediation and eeeqqeeequuqqquiiuppuuipimmiipppmmeemmenneeenttn nntcct tto co cocscsootostssstsststtsss service diversion costs included in the | quantity of IInnIeInccIInqnnrcruceerccreiaarrpeeeassmaaeasesedssdeeeed ndppdd t prr pooppurrojjrrsoeeoojejeccjjedteectc . tcc t tt ocococscsootostssstsst s ttwsw ss w iiwtwwtihhtiiith tthpphh poo pppottoeeoottenntteeenttniinntaatittalilii a aal l ffoofforrffo ooriir nnrr i nissiinnnususussffuffuufiiffccfffifficiieiiecicceniniieeenttn nntt tt sststsaatsstannttaaanddnnndaadddarraddaarrd rrdoodd orr o oorr rr Reduction in qqquuqqquaauuuannaaanttniinnttttiyytttiiity ttyooyy off o ooff ff construction eeeqqeeequuqqquiiuppuuipimmiipppmmeemmenneeenttn nntuut tt uss uuuesesedssdeeed..d dd.. .. budget | ll CCCllCiiCCleeillelniniieeenttnnntttt Client | OOOppOOOpeepppenneeen nnn Open | 333333 4 | 222222 5 | 666666 nn 20 | DDDeeDDDetteeeeetterrttemmeerrmrrmiimmnninieeiinnne ewwee w hhwwwhaahhhatta aateet tt eqq eeequuqqquiiuppuuipimmiipppmmeemmenneeenttn nntiit sstt i s iiis neennneeeeeeeddeeedeedddeddeeed dffdd rr f oofrffrommrrooomm mmtt hh t theetthhhe eddee dee dddesseieesiggsissginniigggn nnn Appropriate budget setting and contingency required to allow for unforeseen costs | ss | 000110001//10011//044//0004//42244//200//2220110001991119999 01/04/2019 | 222222 3 | 222222 5 | 444444 15 |
| 111441114444 15 | FFFiinFnFiFniaaiinnnannaaanccnnniciaaciccaliliiaaallll Commercial | AAAffAffAAfoFofffffoirrffnoddoorradaarrdnddabbacaabiibllibbiiialtitiiilylyltli iityttyyy cc capacity | project are not EEExxEEExttxaeexxttecnntteceenttnu nntoot rtt offa ossooftifsieffttsisseetiiite tteee rreerremmrreeemmeemmeddeeediidaaddiatitiiaiiaatootittoniniiooon naann ann aaanddnnnd ddd sseseserssrevveerrviirrcvcvvieceiiice cc eddee dii dvvddiveieiivvverresseerrisirroosissoniniiooon nnn Lack of internal ocococscsootostssstsst s ttisi ssnn i nicciinnnlcluuclcculddlluuudeedddeddeeed diidd nn i ni iinttnn hh t theetthhhe e Financial capacity ppprrpoopprrojjrroeeoojjeccjjeteectc tccaat tt arr aeeaarre rrennee noo nnnotto oott tt aaaccaacacccucucccuccrruaauurrattrraeeaattetteee | RRReeRRReddeeeduuddduccuuutctciitccootittoniniiooon niinn nn i ni iinnn Delays in ccocococncnooonssnnntstsrrtssuutrttruccrruuutctciitccootittoniniiooon nnn ee financials/ bbbuubbbudduuudggdddgeegggetteeetttt negotiation process | CCCllCiiCCleeillelniniieeenttnnntttt Client | OOOppOOOpeepppenneeennnn Opem | 444444 3 | 555555 4 | A 222002220000 aa 12 aa | AAppAAAppppppprrpoopprropprroooprrpiippraarirratitiiaeeaatte ttebbee buu bbbudduuudggdddgeegggette eetsst tte se setsstetteetiittnntttittniggiinnng ggg annaaanddnnnd dccdd o co cocncnooonttniinntnntittniggiinnngeegggenneeenccnnnycycy cc yrryy ee r reqqrreeequuqqquiiurruuieeriiireddrreeed dttdd oo t to ttooo Appoint external support alllalaaloolllolwlwllooow wwwff oo f forrffo ooruur rr unn uuunffnoonnfforrffoeeoorressrreeeeseseesseeeeenneeen nccnn o co cocscsootostssstsststtsss | 000110001//10011//044//0004//42244//200//2220110001991119999 01/04/2019 | 333333 2 | 555555 4 | 111551115555 8 | |
| 11115511156555 | CCMCooCCCaommonoommmmammmgmeemmeerremcceerricirraaceiccalilniiaaaltlll | FFFiinFnFiFniaaiinnnannaaanccnnniciaaciccalilii a aal lll Definition ccacacacpcpaaapaapppaccaaiacittciccyytiiityttyyy | Staff requirements LLLaaLaLLccaakackck cc kookk off o oofiif nnff i nittiineenntterrttenneerrnaarrnnnall a aal lll exceed space FFFiinFnFiFniaaiinnnannaaanccnnniciaaciccalilii a aalcc llla ca cacpcpaaapaapppaccaaiacittciccyytiiityttyyy allocated in design | BuDiDlDdeeDDDiellnaeaeelgaylylla aayssdy yys iosi ssnn ie ni iinsnn no meeffiitfnnf iffniraaiinennannaqaanccnunniciaaciiccraliliisaesaal/s/lmlls /ss/ e// nts nnneeannneggneeegoogdggotto iiootiaatsittatit iiaiiauatootittnoniniiodoon nppenn prrr poopp rsroccrroioeocezcesccseeseessdsssss | CCCCllCiiCClleeiilleelniniieeennttnnnttttt ss | OOOOppOOOpeeppppemmeeeemnmmm | 3343333 | 4454444 | 11212211102222 A | Challenge staff requirements early in the design process to AAppAAApppppppoopppoiinonooinittiin nnteet tt exx eeexttxeexxtterrttenneerrnaarrnnnall a aalss lllu su sussppuuupppppppooppporrottoorrtrrttt ensure they are met within the building design | 00001100011//10011///0044//00044//42244///2200//2220011000119911199999 | 2232222 | 4454444 | 88185888 | |
| OOOOppOOOpeeppppemmeeeemnmmm | |||||||||||||||
| 11116611176666 | MMMMaaMMMaannaaannaannnaaggaaaggeegggeemmeeemmmeemmeenneeennttnnnttttt | DDPDreeDoDDeffegiieefnnfirffniiiaiinttnniimitiooiitittoninmiiooonnenn | SSSCttSaaSStotaffttnaffaaf tffrrffrf ffee ra reqqrrceeequutqoqquiiurrruuieersiiiremm rredeemmeeommenn eneenttnssonntt s ttts ss buyeee xxeieexccnxexxcetcoeecceeeee ddepeed drssdd op sp sgpssaaprppaccaaaeacecme cc eee m e aaalllalaaloolllolclcllooaocacactctaeeaattedddtteeeda diidd tnn ie ni iinsddnn dee dddesseieesiggsissginniigggnnnn | Agreement of BBBuuBBBuiiulluuiddliidiliilldnnddiniggiinnng gddgg doo dddoeeoooesse ees nsn ss noo nnno ooo contract is delayed mmmmeemmeeeeeeette eetrrt ttee r reqqrreeequuqqquiiurruuieeriiiremmrreeemmeemmenneeenttnssnntt s tts ss and opening is aaannaaanddnnnd diidd ss i s iiiusu ss unn uuunddnnndeeddderre eerssr rri si zzsissezeiiizedzzdeeedddd delayed | CCCCllCiiCClleeiilleelniniieeennttnnnttttt | OOOOppOOOppeepppeenneeenn nnn | 4434444 | 5545555 | C ee 22120022220000 ee tt | CEChhCCCahaahrhhallllalaalyeelllel nlnlleeeenggnnnngeegggge eassee t stg saatssetaffttmaffaaf ffrrfffe ffee r n reqqrreteequu qqqwuiiurruuieieritiiremmhrreeem meemmenneeenttnssnntt s tts ss ceaaeoeearrallnaaryyrlsrry l llytiiyy nnr i cni iinttunn hh tt theeitthohhe enddee de e dpddesseaieesiggsrissgitnniignggn npepnn prrr posopprr occrrtooeoceocesccs eseesss s sstst ssoo t to tto eenneeennssnnnussusuussrrueeuurrree rrettee hh t tpheetthhrheyyeoeey ygaayy arrr aeaeaarre m rremmee mm meemmettee eet wwt dtt w iaiwtwwtithhtieiithiitthnsnhhi ni iinnn hhattheettrhhhee ebbee rbuu bebbuiiulaluuiddlilidiliiilldnsndditniggiininngc gddgg dee dddesseieesiggsissginniigggnnnn | oo | 00001100011//10011///0044//00044//42244///2200//2220011000119911199999 | 3323333 | 5545555 | 1115581115555 |
| 11117711187777 | MMMaaMMMannFaaanaainnnnaggaaaageegnggemmeceemmieemmaennleeenttnnntttt | PPAPrrPoofPPrfroggrroooogrrrgaaggrdrammrraaaambmmmmmimlmeiemmteyeeeb | Increased costs due CCCooCCConnotoonttonrrnnt aatrtvtraccrraaatactcrootccitorrattossoortr s irrdsdo ss doon dddo sonnoo n/oo n nnotto oott tt bbcuubhbbuyyuauuy yiinyy nn i g nittiinooenntto sttoppoo prrr peoopprroqggrrooogurrgaaggrerammrrsaaamtmmmemmmdmeemm e /e maddrdaakdddatteaeeaatttess tteceessosssts | AAAggAAAgrrgeeggrreeerreeeemmeeemmeemmenneeenttn nntoot tt off o ooff ff ccocococncnooonttnrrnntaatrttraccrraatactc tcciit sstt i s iiidsd ss dee dddellaeaeelaylyllaaayeeyyyeddeeed ddd ee Project over spent aaannaaanddnnnd doodd opp ooopeepppenneeeniinnnnniniggiinnng giigg ss i s iiis ss dddeedddellaeaeelaylyllaaayeeyyyeddeeedddd | CCCCllCiiCClleeiilleelniniieeennttnnnttttt | OOOOppOOOppeepppeenneeenn nnn | 3333333 | 4445444 | EE cc 11112211125222 ee aa | EaaEEEarrallaaryyrlrry l llyeeyy enn eeenggnnngaagggaggaaageegggemmeeemmeemmenneeenttn nntwwt tt w iiwtwwtihhtiiith tthhh Manage expectations and ocococncnooonssnnntstsrrtsscctrttrucurrcuccttuiiuutootittoniniiooon nppnn paa ppparrattaarnnrtrrtneettnnnerresseerr s rrtst ssoo t to ttooo perform VE exercises when enneeenssnnnususussrrueeuurre rre ee pp prr poopprroggrrooogrrgaaggrrammrraaammmmmmmmeemme eddee daa dddattaeeaattesstte ees s ss required arraeeaarre rrerree ee r reaarreeealliaiaalssiltlsltiiisiitsscctittciiiccc | 00001100011//10011///0044//00044//42244///2200//2220011000119911199999 | 2223222 | 4444444 | 88182888 | |
| 111881118888 19 | FFFiinFnFiFniaaiinnnannaaanccnnniciaaciccaliliiaaallll Management | AAAffAffAAfooffffforrffoddoorrdaarrdddabbaaabiibllbbiiiltitiiilyyltliiityttyyycc Design | increasing IInnIInccIInnnrcrceerccreaarreeeassaaeasesedssdeeed dccdd o co cocscsootostssstsst s ttdsd ss duu dddueeuuue eee ttootto ttovvoo vaa vvvarraiiaaraarirratitiiaiiaatootittoniniiooonssnnn s /s/ ss / / // hchNchccaahohhannataangg nnngfeeguggesset ees ursr sseer r reeqqrre eequupqqqueeruuuessoeteestoseetssftedditteneed d//gdd / / mmmmaammtarhrakkaarerkeerr kkkedtte eetecct ttso co ciocscsgootostnssstsst s tts ss iinninicciinnnrcrceerccreaarreeeassaaiasinnsissniggiinnngggg | Project //PP PrrPooPPrrojjrrroeeoojejeccjjqeteectuc tccoot ittr ovv oeooveevmvverre eeressr rrnp sp spssetepsppenne eenttnnntttt become unaffordable | CCCllCiiCCleeillelniniieeenttnnntttt Client | OOOppOOOpeepppenneeennnn Open | 333333 3 | 555555 4 | 111551115555 pp 12 rr | Ensure the building has the MMMaaMMMannaaanaannnaggaaageeggge eeeee exx eeexppxxxpeepppecceteectcaatcctattttaiiaatootittoniniiooonssnnn s asa ss ann aaanddnnnd ddd functionality for future peeppperreffeeroorfrrforrffommoorrmrrm mmVV VEE VVVE EeeEE exx eeexeexxxerrecceerricirrsscicceseiiisesssse ees wsw ss w hhwwwheehhhenneeen nnn expansion of infrastructures eerreqqrreeequuqqquiiurruuieeriiireddrreeedddd rather than provide it as a | 000110001//10011//044//0004//42244//200//2220110001991119999 01/04/2019 | 333333 3 | 444444 3 | 111221112222 9 | |
| 111991119999 20 | MMMaaMMMannaaanaannnaggaaageegggemmeeemmeemmenneeenttnnntttt Strategic | DDDeeDDDesseieesiggsissginniigggnnnn Stakeholders | Definition and NNNooNNNottco ootofft uttu fn futtfffuuuuutirturrttmueeuurre rraeppee t prr ipoopporrooornrooooff oiiooofnnfifffnigg iinnng ggg tthhtrtheettohhhe leddeee dee sdddess eaieesiggsnissginniidgggn nnn responsibilities of | PPPrrPooPPrrojjrroeeoojjeccjjeteectc tcct tt Dirrreeerreqqcrreeeqtuuqiqquiiourruuineeriiire mmrreieemsmeemm uenneeennttnssnntct s lttse ss a r and bbdbeebebbeccecoeecoicocmscmooiomomeemmne esee are noutu unnmuuunaanannaffaffdaafooffeffforrffo,ddoor rdaarrrdeddabbasaabllbeeubblelllleteeing | CCCllCiiCCleeillelniniieeenttnnntttt Client | OOOppOOOpeepppenneeennnn Open | 333333 4 | 444444 4 | EE ff 111221112222 ee 16 rr bb | base line EnnEEEnssnnnususussrrueeuurre rrettee hh t theetthhhe ebbee buu bbbuiiulluuiddliidiliilldnnddiniggiinnng ghhgg haa hhhassaa as tst sshh t theetthhhe eee uuffunnffuuunccnnntctciitccootittoniniiooonaannnalliaiaalttilyyltliiity ttyffyy oo f forrffo oorffr rruu f futtffuuuuutturrttueeuurre rreee Agree a PEP early in the exxeeexppxxxpaapppannaaanssnnnisioosissoniniiooon noonn off o oofiif nnff i niffiinrrnnfaafrffrassrraatastsrrtssuutrttruccrruuutctcuutccturrttueeuurressrre ees s ss project. Set up a Project aarrattrrahhaattheetthhherre eerttr rrhh t thaatthhhannaaan nppnn prr poopprrovvrroooviidvdvvidieeiiddde eiiee tt i tiaaiit tt ass aa as asa ss a aaa Executive to identify and baabbbassaaeasese ss ellee ii lnn illnlieeiinnneeee | 000110001//10011//044//0004//42244//200//2220110001991119999 01/04/2019 | 333333 3 | 333333 4 | 999999 12 | |
| 222002220000 21 | SSSttSrrSStaatrttrattrraeeaatteggtteeegiigccggiciiiccc Strategic | SSSttSaaSSttakkttaaakeekkkehheeehoohhholldodooldleellddderresseerrsrrsss Masterplan | stakeholders is not DDDeeDDDeffeiieefnnfiaffniiiiintgtnniiitirooiitiettoniniioeoon ndaann ann aaanddnnnd ddd ccocococncnooonffniinnfrrfimmffriiirmrrmaammattaiiaatootittoniniiooon noonn off o ooff ff rroorrollrreoeooleslslle ees asa ss ann aaanddnnnd ddd rreerressrrepeespspssooppponnooonssnnnisibbsissbiiiiibllbbiiiltitiiiliiltlieeiitittesisiie ees oso ss off o ooff ff n Planning approval is sststsaatsstakkttaaakeekkkehheeehoohhholldodooldleellddderresseerr s rrisi ssss i s iiinsn ss noo nnnotto oott tt not achieved aaaggaaagrrgeeggrreeerreeeeddeeedddd | in project delays DDDiiDrrDDieeriiireccrreteectciitccootittoniniiooon niinn ss i s iiiusu ss unn uuunccnnnlcleeclccealalleeearra aarr aaannaaanddnnnd ddddd dee dddecceieecissciccisiioiiosissoniniiooonssnnn s asa ss arr aeeaarre rreee nnoonnnotto ootmmt tt m maammaddaaadeeddde,,e ee,rr, ,,ee r ressrreueesususslluttuuliitlnnlltittniggiinnng g iiPnninri iinpopnn prjr peoopprrcojjrroeetooj jeccjjietesectc tccddtd tt deee dddelllaeaaeelaylyyllaaaysseyyysdsss | rr CCCllCiiCCleeillelniniieeenttnnntttt gg Client | OOOppOOOpeepppenneeennnn Open | 444444 2 | 444444 5 | A pp 111661116666 EE 10 aa | agree R&Rs AAggAAAgrrgeeggrreeerreeee eaaee a aPPaa PEE PPPEPPEEEP PeePP eaa eeearrallaaryyrlrry l llyiiyy nn i ni iinttnn hh t theetthhhe eee Early engagement with prrpoopprrojjrroeeoojjeccjjeteectc..tcc t.tStS. .. See SSSette eetuut tt upp uuup paapp a aPPaa Prr PooPPrrojjrroeeoojjeccjjeteectc tcct tt planners to enusre buy in to ExxEEExeexxxecceueecucuccttuiiuutvvtittveieiivvve ettee oo t to ttoiioo dd i dieeiidddenneeenttniinntfftiyyttfiiify ffyaayy ann aaanddnnnd ddd the scheme and any aggaaagrrgeeggrreeerreeee eRRee R&& RRR&RR&&&RssRRRssss concerns (eg rights of light | 000110001//10011//044//0004//42244//200//2220110001991119999 01/04/2019 | 333333 2 | 444444 4 | 111221112222 8 | |
| 222112221111 | SSSttSrrSStaatrttrattrraeeaatteggtteeegiigccggiciiiccc | MMMaaMMMassaatastseetssterrtteppeerrpllrrpaapplanlnllaaannnn | PPPllaPaPPlanlnllaaannnnnnniinnnnniniggiinnng gaagg app aaappppppprrpoopprrovvrrooovaavvvall a aalii lssll i s iiis nnnoonnnotto ootaat tt acc aahachchcciiheehhieviviieeeveevvveddeeedddd | ss PPPrrPooPPrrojjrroeeoojjeccjjeteectc tcciit sstt i s iiidsd ss dee dddellaeaeelaylyllaaayeeyyyeddeeedddd | CCCllCiiCCleeillelniniieeenttnnntttt | OOOppOOOpeepppenneeennnn | 222222 | 555555 | EE pp tt 111001110000 cc tt aa | to neighbouring properties) EaaaEEErarraellaaryyr lrrya l llyeeyy d enn deeenggrnnngaaegggaggsaaagseegeggemmedeemmee mmiennneeentt n nnttwwth tt w eiiwtwwti hhtidiith ttehhh s ign pllpaapplanlnllaaannnnnnneennnerresseerr s rrtst ssoo t to ttoeeoo enn eeenuunnnussuuursrseerssre rrebbee buu bbbuyyuuuy yiiyy nn i ni iinttnn oo t to ttooo hhttheetthhhe essee c sc shchsschcceehhhemmeeemmeemme eaaee ann aaanddnnnd daadd ann aaanyynnny yyy ocococncnooonccnnnececerccrenneerrnssrrnnn s (s( ssee ( (egg((eeeg grrgg ii rgg rirrgihhiiggghtthsshhtt s ttoso ss off o oofllf iiff lgg illglihhiiggghtth hhtt tt ootto ttonnoo nee nnneiigegeeigihhiiggghbbhhhboobbbouuooourruiiuurnnrirrniggiinnng gppgg prr poopprropprrooopeeppperretteeriirterretittesisiie)ees)s )ss) )) arraeeaarre rreaaee add aaadddddddrrdeeddrressrreseesssesesssedssdeeed diidd nn i ni iinttnn hh t theetthhhe eddee dee dddesseieesiggsissginniigggnnnn | 000110001//10011//044//0004//42244//200//2220110001991119999 | 222222 | 444444 | 888888 |
| RRRRRiiiisssisskkkkk | RRRRRiiiisssisskkkkk DDD DDeeeeessssscccccrrrririiipppippttttitiiioooioonnnnn//// / | PPPPPrrrroroooobbbbbaaaaabbbbbiiiillliliiilitttitytyyyy | IIIImmmImmpppppaaaaacccccttttt | RRRRRiiiisssisskkkkk RRR RRaaaaattttitiiinnninnggggg | AAAAAcccccttttitiiioooioonnnnn | AAAAAcccccttttitiiioooioonnnnn | PPPPPrrrroroooobbbbbaaaaabbbbbiiiillliliiilitttitytyyyy | IIIImmmImmpppppaaaaacccccttttt | RRRRRiiiisssisskkkkk R R R R Raaaaattttitiiinnninnggggg | ||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| RRRRRiiiisssisskkkkk III IDDDIDD | CCCCCaaaaatttteteeeegggggooooorrrryryyyy | TTTTTiiiitttitltllleeelee | NNNNNaaaaarrrrrrrrraraaaattttitiiivvvivveeeee | CCCCCooooonnnnnssssseeeeeqqqqquuuuueeeeennnnnccccceeeeesssss R | RRRRiiiisisssskkkkk O OOOOwwwwwnnnnneeeeerrrrr | SSSSStttttaaaaatttttuuuuusssss | ((((1(1111 --- - - 555 55))))) | ((((1(1111 --- - - 555 55))))) | AAAAAuuuuuttttoootooCCCCCaaaaalllll | MMMMMiiiitttititiiigggiggaaaaattttitiiinnninnggggg AAA AAcccccttttitiiioooioonnnnn | OOOOOwwwwwnnnnneeeeerrrrr | DDDDDaaaaatttteteeee//// / UUU UUpppppdddddaaaaatttteteeee PPP PPMMMMM | ((((1(1111 --- - - 555 55))))) | ((((1(1111 --- - - 555 55))))) | AAAAAuuuuuttttoootooCCCCCaaaaalllll |
| 2222222222 | CCCCCooooommmmmmmmmmeeeeerrrrcrcccciiiiaaaiaalllll | PPPPPrrrroroooocccccuuuuurrrrereeeemmmmmeeeeennnnnttttt | AAAAAgggggrrrrereeeeeeeeemmmmmeeeeennnnntttt t o ooooffff f aaaaappppppppppoooooiiiinnninnttttmtmmmmeeeeennnnntttt t mmmmmeeeeetttththhhhoooooddddd i iiisssiss d ddddeeeeellllaaalaayyyyyeeeeeddddd | AAAAAppppppppppoooooiiiinnninnttttmtmmmmeeeeennnnntttt t o ooooffff f t ttththhhheeeee dddddeeeeesssssiiiigggiggnnnnn t ttteteeeeaaaaammmmm a aaaannnnnddddd mmmmmaaaaaiiiinnninn c ccccooooonnnnnttttrtrrraraaaacccccttttotoooorrrr r dddddeeeeellllaaalaayyyyyeeeeeddddd a aaaannnnnddddd ppppprrrroroooojjjjejeeeeccccctttt t d ddddeeeeellllaaalaayyyyyeeeeeddddd | CCCCClllliiilieeeieennnnnttttt | OOOOOpppppeeeeennnnn | 44444 | 44444 | 1111166666 t | EEEEEaaaaarrrrlrlllyyylyy e eeeennnnngggggaaaaagggggeeeeemmmmmeeeeennnnntttt t w wwwwiiiitttiththhhh l llleeeleegggggaaaaallll l aaaaannnnnddddd p pppprrrroroooocccccuuuuurrrrereeeemmmmmeeeeennnnntttt t c ccccooooollllllllleeeleeaaaaaggggguuuuueeeeesssss tttotoooo r rrrereeeeddddduuuuuccccceeeee a aaaannnnnyyyyy d ddddeeeeellllaaalaayyyyysssss t tttotoooo aaaaappppppppppoooooiiiinnninnttttmtmmmmeeeeennnnnttttstssss | 0000011111/////0000044444/////22222000001111199999 | 33333 | 33333 | 99999 | |
| 2222233333 | SSSSSttttrtrrraraaaatttteteeeegggggiiiicccicc | PPPPPrrrroroooogggggrrrraraaaammmmmmmmmmeeeee | IIIInInnnnsssssuuuuufffffffffifiiicccicciiiieeeieennnnntttt t t tttitiiimmmimmeeeee aaaaavvvvvaaaaaiiiilllilaaalaabbbbblllleeelee f fffofoooorrrr r k kkkkeeeeeyyyyy sssssttttataaaakkkkkeeeeehhhhhooooolllldddlddeeeeerrrrsrssss t tttotoooo iiiinnninnpppppuuuuutttt t i iiinnninnttttotoooo p pppprrrroroooojjjjejeeeeccccctttt t ddddduuuuueeeee t tttotoooo o ooootttththhhheeeeerrrr r cccccooooommmmmmmmmmiiiitttitmtmmmmeeeeennnnnttttstssss | PPPPPrrrroroooojjjjejeeeeccccctttt t d ddddeeeeellllaaalaayyyyyeeeeeddddd | CCCCClllliiilieeeieennnnnttttt | OOOOOpppppeeeeennnnn | 44444 | 44444 | 1111166666 | OOOOObbbbbttttataaaaiiiinnninn c ccccooooommmmmmmmmmiiiitttitmtmmmmeeeeennnnntttt t f fffrfrrroroooommmmm a aaaalllllllll l kkkkkeeeeeyyyyy s ssssttttataaaakkkkkeeeeehhhhhooooolllldddlddeeeeerrrrsrssss t ttththhhhrrrroroooouuuuuggggghhhhh aaaaagggggrrrrereeeeeeeeemmmmmeeeeennnnntttt t o ooooffff f P PPPPEEEEEPPPPP | 0000011111/////0000044444/////22222000001111199999 | 33333 | 33333 | 99999 | |
| 2222244444 | SSSSSttttrtrrraraaaatttteteeeegggggiiiicccicc | PPPPPllllaaalaannnnnnnnnniiiinnninnggggg | O OOOObbbbbjjjjejeeeecccccttttitiiioooioonnnnnsssss t tttotoooo pppppllllaaalaannnnnnnnnniiiinnninnggggg..... | DDDDDeeeeellllaaalaayyyyy p ppppllllaaalaannnnnnnnnniiiinnninnggggg,,,, , ppppprrrroroooojjjjejeeeeccccctttt t c ccccooooouuuuulllldddldd b bbbbeeeee dddddeeeeellllaaalaayyyyyeeeeeddddd..... | CCCCClllliiilieeeieennnnnttttt | OOOOOpppppeeeeennnnn | 33333 | 44444 | 1111122222 r | EEEEEaaaaarrrrlrlllyyylyy c ccccooooommmmmmmmmmsssss s ssssttttrtrrraraaaatttteteeeegggggyyyyy t tttotoooo b bbbbeeeee aaaaadddddoooooppppptttteteeeeddddd a aaaannnnnddddd c ccccooooonnnnnsssssuuuuulllltttlteteeeeddddd o oooonnnnn a aaaa rrrereeeeggggguuuuullllaaalaarrrr r b bbbbaaaaasssssiiiisssiss w wwwwiiiitttiththhhh t ttththhhheeeee sssssttttataaaakkkkkeeeeehhhhhooooolllldddlddeeeeerrrrsrssss..... | 0000011111/////0000044444/////22222000001111199999 | 11111 | 33333 | 33333 | |
| 2222255555 | FFFFFiiiinnninnaaaaannnnnccccciiiiaaaiaalllll | DDDDDeeeeesssssiiiigggiggnnnnn | GGGGGIIII I r rrrereeeepppppooooorrrrtrttt t r rrrereeeeqqqqquuuuuiiiirrrirereeeeddddd aaaaatttt t D DDDD11111 t tttotoooo i iiinnninnffffofoooorrrrmrmmmm ffffofoooouuuuunnnnndddddaaaaattttitiiioooioonnnnn d ddddeeeeesssssiiiigggiggnnnnn | IIIInInnnncccccrrrrereeeeaaaaassssseeeeeddddd C CCCCooooosssssttttstssss ooooovvvvveeeeerrrr r a aaaannnnnddddd a aaaabbbbbooooovvvvveeeee wwwwwhhhhhaaaaatttt t h hhhhaaaaasssss b bbbbeeeeeeeeeennnnn aaaaallllllllloooloowwwwweeeeeddddd f fffofoooorrrr r i iiinnninn t ttththhhheeeee bbbbbuuuuudddddgggggeeeeetttt.t.... | CCCCClllliiilieeeieennnnnttttt | OOOOOpppppeeeeennnnn | 33333 | 55555 | 1111155555 i | EEEEEnnnnnsssssuuuuurrrrereeee G GGGGIIII I I IIInInnnntttteteeeerrrrprppppuuuuuttttitiiivvvivveeeee r rrrereeeepppppooooorrrrtrttt t iiisssiss c ccccooooommmmmmmmmmiiiisssisssssssiiiioooioonnnnneeeeeddddd a aaaatttt t t ttththhhheeeee s ssssttttataaaarrrrtrttt t oooooffff f D DDDD11111 | 0000011111/////0000044444/////22222000001111199999 | 11111 | 33333 | 33333 | |
| 2222266666 | FFFFFiiiinnninnaaaaannnnnccccciiiiaaaiaalllll | PPPPPrrrroroooogggggrrrraraaaammmmmmmmmmeeeee | SSSSSiiiitttiteteeee m mmmmaaaaayyyyy h hhhhaaaaavvvvveeeee aaaaarrrrcrcccchhhhhaaaaaeeeeeooooolllloooloogggggiiiiccciccaaaaallll l v vvvvaaaaalllluuuluueeeee | DDDDDeeeeellllaaalaayyyyy t tttotoooo p pppprrrroroooojjjjejeeeecccccttttt | CCCCClllliiilieeeieennnnnttttt | OOOOOpppppeeeeennnnn | 22222 | 55555 | 1111100000 | EEEEEaaaaarrrrlrlllyyylyy c ccccooooonnnnnsssssuuuuulllltttltataaaattttitiiioooioonnnnn r rrrereeeeqqqqquuuuuiiiirrrirereeeeddddd ddddduuuuurrrririiinnninnggggg D DDDD11111 t tttotoooo e eeeesssssttttataaaabbbbblllliiilisssisshhhhh r rrririiisssisskkkkk t tttotoooo ppppprrrroroooojjjjejeeeeccccctttt.t.... | 0000011111/////0000044444/////22222000001111199999 | 11111 | 22222 | 22222 | |
| 2222277777 | FFFFFiiiinnninnaaaaannnnnccccciiiiaaaiaalllll | DDDDDeeeeesssssiiiigggiggnnnnn | UUUUUnnnnnccccceeeeerrrrtrtttataaaaiiiinnninniiiitttitytyyyy aaaaassssssssssoooooccccciiiiaaaiaatttteteeeeddddd w wwwwiiiitttiththhhh uuuuuttttitiiillliliiilitttititiiieeeieesssss a aaaannnnnddddd e eeeennnnneeeeerrrrgrggggyyyyy sssssuuuuuppppppppppllllyyylyy | AAAAAddddddddddiiiitttititiiioooioonnnnniiiiaaaiaallll l C CCCCooooossssstttt t t tttotoooo tttththhhheeeee p pppprrrroroooojjjjejeeeeccccctttt.t.... | CCCCClllliiilieeeieennnnnttttt | OOOOOpppppeeeeennnnn | 33333 | 55555 | 1111155555 r t | FFFFFuuuuurrrrtrttththhhheeeeerrrr r d ddddeeeeettttataaaaiiiilllileeeleeddddd i iiinnninnvvvvveeeeesssssttttitiiigggiggaaaaattttitiiioooioonnnnn rrrereeeeqqqqquuuuuiiiirrrirereeeeddddd a aaaatttt t D DDDD11111 t tttotoooo a aaaasssssccccceeeeerrrrtrtttataaaaiiiinnninn ttththhhheeeee i iiinnninntttteteeeerrrrfrfffafaaaaccccceeeee r rrrereeeeqqqqquuuuuiiiirrrirereeeemmmmmeeeeennnnnttttstssss..... | 0000011111/////0000044444/////22222000001111199999 | 22222 | 33333 | 66666 | |
| 2222288888 | FFFFFiiiinnninnaaaaannnnnccccciiiiaaaiaalllll | DDDDDeeeeesssssiiiigggiggnnnnn | SSSSSuuuuusssssttttataaaaiiiinnninnaaaaabbbbbiiiillliliiilitttitytyyyy/////BBBBBrrrrereeeeeeeeeaaaaa mmmmm R RRRReeeeeqqqqquuuuuiiiirrrirereeeemmmmmeeeeennnnnttttstssss d ddddooooo nnnnnoooootttt t a aaaalllliiiligggiggnnnnn w wwwwiiiitttiththhhh cccccuuuuurrrrrrrrrereeeennnnntttt t b bbbbuuuuudddddgggggeeeeetttt t aaaaavvvvvaaaaaiiiilllilaaalaabbbbblllleeelee..... | IIIISISSSSSSSSSMMMMM S SSSSuuuuusssssttttataaaaiiiinnninnaaaaabbbbbiiiillliliiilitttitytyyyy ttttataaaarrrrgrggggeeeeettttstssss m mmmmaaaaayyyyy n nnnneeeeeeeeeeddddd ttttotoooo b bbbbeeeee d ddddeeeeerrrroroooogggggaaaaatttteteeeeddddd o oooorrrr r VVVVVEEEEE u uuuunnnnndddddeeeeerrrrtrtttataaaakkkkkeeeeennnnn | Project - CCCCClllliiilieeeieennnnnttttt | Castle R OOOOOpppppeeeeennnnn | ushen High 33333 | School 33333 | 99999 | DDDDD11111 d ddddeeeeesssssiiiigggiggnnnnn t tttotoooo t tttataaaakkkkkeeeee a aaaaccccccccccooooouuuuunnnnntttt t o ooooffff f DDDDDEEEEESSSSSCCCCC s ssssuuuuusssssttttataaaaiiiinnninnaaaaabbbbbiiiillliliiilitttitytyyyy v vvvviiiisssissiiiioooioonnnnn aaaaannnnnddddd c ccccooooossssstttt t p ppppllllaaalaannnnn i iiinnninnffffofoooorrrrmrmmmmeeeeeddddd..... | 0000011111/////0000044444/////22222000001111199999 | 11111 | 11111 | 11111 | |
| tego2222r29y9999 | Risk FFFFFiiiinTnninnaiaaatanlnnnenccccciiiiaaaiaalllll | Risk Descriptio PPPPPrrrrorooooggggNgrrrraaraaaarmmmmrmammmmtmiveeeeee | nLLLLL/aaa aaccccckkkkk o ooooffff f c ccccooooonnnnnttttrtrrraraaaacccccttttitiiinnninnggggg rrrrereeeesssssooooouuuuurrrrcrcccCceeeeeo o oonoonnnsnn e I IIIqsIsssslullleeeleee no oooocffff f e s MMMMMaaaaannnnn | IIIIsIssssR a aaaia s r rrrkiriiisssis skOkkkk tw tttotoooon c cccecooooorssssstttt tS ta aaaaannnnnddddd p pppprrrroroooogggggrrrraraaaammmmmmmmmmeeeee | Proba tuCCCsCClllliiilieeeieennnnnttttt (1 - | bility Im OOOOOpppppeeeeennnnn 5) ( | pact Risk 55555 1 - 5) Aut | Rating 55555 Mit oCal | igatin222g22555 55Action t | EEEEEaaaaarrrrlrlllyyylyy C CCCCooooonnnnnttttrtrrraraaaacccccttttotoooorArrr r cI IIInIntnnnivovvvvoonoooll llvvvlvveeeeemmmmmeeeeennnnnttttAt CCCCCooooonnnnnsssssiiiidddiddeeeeerrrr r U UUUUKKKKK c ccccooooonnnOnnttttwrtrrraraaanaccccecttttrotoooorrrrsrssss Da aaaatattt t t e/ ttteteeeennnnndddddeeeeerrrrr | ction Update PM | Probability Im 0000011111/////0000044444/////22222000001111199999 (1 - 5) (1 | pact Risk R 33333 - 5) Auto | ating 33333 Cal | 99999 |
| 3333300000 | MMMMMaaaaannnnnaaaaagggggeeeeemmmmmeeeeennnnnttttt | DDDDDeeeeesssssiiiigggiggnnnnn Agreement o | DDDDDeeeeesssssiiiigggiggnnnnn t ttteteeeeaaaaammmmm aaaaAappppppppppppooooooiiiitttiitmtnmmmmtemeeeennnnnetttttnt of f design team an | LLLLLaaaaatttteteeee a aaaappppppppppoooooiiiinnninnttttmtmmmmeeeeennnnntttt t oooooffff f t ttththhhheeeee D DDDDeeeeesssssiiiigggiggnnnnn T TTTTeeeeeaaaaammmmm the cccccooooouuuuulllldddldd a aaaafffffffffefeeeeccccctttt t d ppppprrrroroooogggggrrrraraaaammmmmmmmmmeeeee..... | CCCCClllliiilieeeieennnnnttttt | OOOOOpppppeeeeennnnn | 33333 | 33333 Ear | 99999 i ly engagemei | DDDDDeeeeesssssiiiigggiggnnnnn t ttteteeeeaaaaammmmm t tttotoooo b bbbbeeeee a aaaappppppppppoooooiiiinnninntttteteeeeddddd iiinnninn g ggggooooooooooddddd t tttitiiimmmimmeeeee - ---- I IIITITTTTTTTTT t tttotoooo b bbbbeeeee niiisssistssss ssuwuuuueeeieetddddhd Q QQQlQe3333g3 2a 22220l000 01111199999 | 0000011111/////0000044444/////22222000001111199999 | 11111 | 11111 | 11111 | |
| mercial | Procurement | appointment method is delay | main contracto ed delayed and project delaye | r Client Op d | en 4 | TTTTToooootttttaaaaalllll | 4 1 | an 6 to ap | d procuremen reduce any de pointments | t colleagues 01/0 lays to | 4/2019 | 3 TTTTToooootttttaaaaalllll | 3 9 |
| Transaction text | Amount |
|---|---|
| Feasability - Professional Fees - Civil Engineer | £2,907.38 |
| Feasability - Professional Fees - Structural Engin... | £7,008.13 |
| Feasability - Professional Fees - Quantity Surve... | £14,670.00 |
| Feasability - Site Topographical | £350.00 |
| Feasability - Professional Fees - Specialist Advis... | £7,965.00 |
| CRHS new school UK visit Oct-17 | £1,104.89 |
| Professional services - Mechanical and Electrical - C... | £1,260.00 |
| Travel & Accomm PCard Jan-18 | £740.74 |
| Reiburse DOI Ref 17290 CRHS Survey | £2,560.00 |
| PCard Jul-18 & travel | £310.94 |
| Feasability - Professional Fees - Project Manager - 90% ... | £56,650.50 |
| DOES&C Castle Rushen Professional Fees - Quantity Surveyor | £6,294.50 |
| Source | Internal review summary | Outcome | Exemptions relied upon |
|---|---|---|---|
| CRHS Strategic brief | Some exemptions overturned | CRHS Strategic brief re-issued – Treasury figures redacted | s.30(2)(b), 35(c) – p6 … Treasury figures (See s.1 below) |
| CRHS Strategic brief | Figures that are commercially sensitive redacted | s 30(2)(b) – p121 & 122, 124, 125, 134 - 139 (See s.2 below) | |
| CRHS Strategic brief | Names redacted but position indicated eg Department officer, CRHS officer or DOI officer. | S 35(b) P 149 – 157 (See s.3 below) | |
| Extracts from DESC department reports | Re-collated and reviewed | Extracts document re- issued | s 30(2)(b) …. Treasury figures (See s. 1 below) |
| Extracts from DESC department monthly meetings | Re-collated and reviewed | Extracts document re- issued | s 30(2)(b) …. Treasury figures (See s. 1 below) |
| Email correspondence with Treasury | Reviewed and reissued – (copies of emails 1 and 2). Out of scope material identified and redacted - This relates to other schemes | Email addresses and phone numbers redacted | |
| CRHS Presentation to Treasury part 1 | Reviewed and reissued. Out of scope material identified and redacted - This relates to other developments around the Island | Part 1 and 2 in one document unless not possible to send due to size. | Material out of scope |
| CRHS Presentation to Treasury part 2 | Reviewed and reissued. Out of scope material identified and redacted - This relates to other developments around the Island. | Material out of scope | |
| CRHS redevelopment business case | Reviewed and reissued. | Treasury figures redacted and signatures redacted | s 30(2)(b) …. Treasury figures (See s. 1 below) S. 25 for signatures |
| Source | Internal review summary | Outcome | Exemptions relied upon |
|---|---|---|---|
| CRHS financial expenditure to 31/07/2021 | Reviewed – these figures do not include school field redevelopment | No action taken | |
| CRHS Internal Block Plan First & ground floor | New document | No exemptions applied | |
| Ap03 | New document | Mobile phone number redacted | |
| ap06d | New document | Mobile phone number redacted | |
| App A – suitability report | New document | Security info redacted | s. 32 LED (see s. 4 below) |
| App B - Internal report | New document | No exemptions applied | |
| App C | New document | No exemptions applied | |
| App D | New document | Security info redacted | s. 32 LED (see s. 4 below) |
| App E - Structural report | New document | Signatures redacted | s. 25 |
| App E - Structural report – drawings 001 to 004 | New documents | No exemptions applied | |
| App F - Civil and Structural works report | New document | Signatures redacted | s. 25 |
| App F - Civil and Structural works report - drawing 005 to 009 | New documents | No exemptions applied | |
| App G - CDM compliance report | New document | Security info redacted | s. 32 LED (see s. 4 below) |
| App H - CRHS Business Case Option Costs 210617 | New document | Treasury figures redacted | s. 30(2)(b) …. Treasury figures (See s. 1 below) |
| App I - Maintenance and Energy Cost forecast | New document | Treasury figures redacted | s. 30(2)(b) …. Treasury figures (See s. 1 below) |
| App I - Maintenance and Energy Cost forecast_MASTER document | New document | Treasury figures redacted | s. 30(2)(b) …. Treasury figures (See s. 1 below) |
| ns04b | New document | Mobile phone number redacted | |
| Phases-2017b | New document | Mobile phone number redacted |
| Source | Internal review summary | Outcome | Exemptions relied upon |
|---|---|---|---|
| Treasury proposal - review | New document | Some material out of scope as it relates to other projects. Treasury figures redacted | s. 30(2)(b) …. Treasury figures (See s. 1 below) |
| Treasury Queries - Secondary strategy | New document | Some material out of scope as it relates to other projects. |
| For disclosure | Weight | Against disclosure | Weight |
|---|---|---|---|
| Transparency – Disclosure of the information would support transparency and promote openness and accountability to the general public in relation to proposed funding for the development of a new Castle Rushen High School. | 5 | Treasury policy from 2007 is to keep the budgeted level of funding redacted until funding is agreed by Tynwald | 5 |
| Releasing the information would indicate the level of funding proposed to support the building of a new school for CRHS by Treasury. | 5 | Disclosing the information would prejudice the tendering process in terms of potential collusion prior to the tendering exercise and potential bids received from contractors and this could put some contractors at an unfair advantage, and others at a disadvantage. | 5 |
| Disclosure would facilitate public debate about the level of funding that should be considered for a new school | 4 | The costs of capital programme future schemes within the Isle of Man Government’s 2021/22 budget have not been released. Disclosure may set a precedent for estimated costings to be disclosed by Government pre- tender exercise. The cumulative impact of this on Government’s ability to achieve value for money when purchasing services could be substantial and this would not be in the public interest. | 5 |
| There is only a limited budget available to IOM Government and no matter how much discussion and debate there is this will not alter the funding available to Treasury | 2 | ||
|---|---|---|---|
| Total | 14 | Total | 20 |
| For disclosure | Weight | Against disclosure | Weight |
|---|---|---|---|
| Transparency – Disclosure of the information would support transparency and promote openness and accountability to the general public in relation to proposed funding for the development of a new Castle Rushen High School. | 5 | DESC have been advised that these figures are commercially sensitive and should not be shared in the public domain | 5 |
| Enables a comparison of monies incurred in relation to schools elsewhere with what is proposed | 5 | Disclosure of the figures would undermine the relationship of DESC with Turner and Townsend | 4 |
| Disclosure undermines trust with Turner and Townsend and with the schools that allowed DESC officials to visit and review what they saw | 3 |
| Total | 10 | Total | 13 |
| For disclosure | Weight | Against disclosure | Weight |
|---|---|---|---|
| Transparency – Disclosure of the information (names / initials) would support transparency and promote openness and accountability to the general public in relation to discussion around aspects of the new Castle Rushen High School and views about some of the schools visited. | 5 | Disclosure may inhibit future discussion and willingness to express views, with people being guarded in what they say. | 5 |
| Releasing the information would indicate who had said what and what their views are. | 4 | Particular criticism may be levelled against particular individuals for what they may have said or think. | 3 |
| Disclosure may affect views about named individuals being able to revisit particular schools or facilities | 2 | ||
| Total | 9 | Total | 10 |
| For disclosure | Weight | Against disclosure | Weight |
|---|---|---|---|
| Transparency as to the range of factors taken into account when considering the business case. | 2 | Information disclosure could risk the security of a public school facility, which is not in the public interest. | 4 |
| Spaces | Direct Impact on Education | H & S/ Security | Disabled Access | Comments | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Typ | Category | |||||||||||||||
| euqinU mooR feR | noitangiseD mooR edoC | epahS/eziS | tnemnorivnE | noitacoL | erutinruF dexiF | erutcurtsarfnI TCI | A | B | C | D | hgiH | muideM | woL | seY | oN | |
| Entrance | 1 | Area used for several purposes creating a congested feel to the space. | ||||||||||||||
| 2 | Automatic doors do not ameliorate the effect of the wind entering the building. | |||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| Deliveries are made through the main entrance. Deliveries are left in the area for subsequent pickup. | ||||||||||||||||
| Reception | A102 | 1 | Space behind reception desk is restricted. | |||||||||||||
| 2 | Area very cold in winter due to poorly designed front entrance. | |||||||||||||||
| 0 | ||||||||||||||||
| 2 | Reception desk not sufficiently large to cater for staff and storage of items/equipment required | |||||||||||||||
| 0 | ||||||||||||||||
| Congested area creating trip hazards. | ||||||||||||||||
| Spaces | Direct Impact on Education | H & S/ Security | Disabled Access | Comments | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Typ | Category | |||||||||||||||
| loohcS mooR feR | tessA mooR edoC | epahS/eziS | tnemnorivnE | noitacoL | erutinruF dexiF | erutcurtsarfnI TCI | A | B | C | D | hgiH | muideM | woL | seY | oN | |
| Admin corridor | A103 | 0 | ||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| Storage of items awaiting pickup due to lack of storage. | ||||||||||||||||
| Doors off to accommodation are narrower than required by current legislation. | ||||||||||||||||
| General office | A105 | 1 | Awkward shape for furniture layout. | |||||||||||||
| 1 | Cold in winter as door to reception is open due to restricted layout. | |||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| 1 | Lack of data and power sockets. | |||||||||||||||
| Storage of items awaiting pickup due to lack of storage. | ||||||||||||||||
| Access doors are narrower than required by current legislation. | ||||||||||||||||
| Office | A106 | 0 | ||||||||||||||
| 2 | No direct daylight or natural ventilation. | |||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| Electronic door lock due to storage of sensitive information. | ||||||||||||||||
| Access doors are narrower than required by current legislation. |
| Spaces | Direct Impact on Education | H & S/ Security | Disabled Access | Comments | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Typ | Category | |||||||||||||||
| loohcS mooR feR | tessA mooR edoC | epahS/eziS | tnemnorivnE | noitacoL | erutinruF dexiF | erutcurtsarfnI TCI | A | B | C | D | hgiH | muideM | woL | seY | oN | |
| Male staff toilet | A107 | 0 | ||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| Disabled toilet provision adjacent. | ||||||||||||||||
| Photo copier | A108 | 1 | Small room with inadequate space for materials and personnel. | |||||||||||||
| 1 | Minimal mechanical ventilation. Hot in summer. | |||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| Congested space. | ||||||||||||||||
| Access door is narrower than required by current legislation. No space to manoeuvre. | ||||||||||||||||
| Store | A109 | 0 | ||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| Narrow door width does not comply with current requirements for wheelchair access. |
| Spaces | Direct Impact on Education | H & S/ Security | Disabled Access | Comments | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Typ | Category | |||||||||||||||
| loohcS mooR feR | tessA mooR edoC | epahS/eziS | tnemnorivnE | noitacoL | erutinruF dexiF | erutcurtsarfnI TCI | A | B | C | D | hgiH | muideM | woL | seY | oN | |
| Office | A110 | 0 | ||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| Narrow door width does not comply with current requirements for wheelchair access. | ||||||||||||||||
| Female staff toilet | A111 | 0 | ||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| Disabled toilet adjacent. | ||||||||||||||||
| Deputy Head’s office | A112 | 0 | ||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| Narrow door width does not comply with current requirements for wheelchair access. |
| Spaces | Direct Impact on Education | H & S/ Security | Disabled Access | Comments | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Typ | Category | |||||||||||||||
| loohcS mooR feR | tessA mooR edoC | epahS/eziS | tnemnorivnE | noitacoL | erutinruF dexiF | erutcurtsarfnI TCI | A | B | C | D | hgiH | muideM | woL | seY | oN | |
| Disabled toilet | A113 | 0 | ||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| Narrow door width does not comply with current requirements for wheelchair access. | ||||||||||||||||
| Deputy Head’s office | A114 | 0 | ||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| Narrow door width does not comply with current requirements for wheelchair access. | ||||||||||||||||
| Head Teacher’s office | A115 | 1 | Room’s poor shape limits furniture layout options. | |||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| Narrow door width does not comply with current requirements for wheelchair access. |
| Spaces | Direct Impact on Education | H & S/ Security | Disabled Access | Comments | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Typ | Category | |||||||||||||||
| loohcS mooR feR | tessA mooR edoC | epahS/eziS | tnemnorivnE | noitacoL | erutinruF dexiF | erutcurtsarfnI TCI | A | B | C | D | hgiH | muideM | woL | seY | oN | |
| Office | A116 | 0 | ||||||||||||||
| 1 | Area generally lacking heating. | |||||||||||||||
| 2 | No disabled access from main school accommodation. | |||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| Access door is narrower than required by current legislation. Access for wheelchair bound person requires them to exit the school and re-enter adjacent to this room due to stairs in corridor from admin area | ||||||||||||||||
| Corridor | A119 | 0 | ||||||||||||||
| 0 | ||||||||||||||||
| 2 | No disabled access from main school accommodation. | |||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| No disabled access from within main school building. | ||||||||||||||||
| Office Listening | A120 | 0 | ||||||||||||||
| 0 | ||||||||||||||||
| 2 | No disabled access from main school accommodation. | |||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| Narrow door width does not comply with current requirements for wheelchair access. |
| Spaces | Direct Impact on Education | H & S/ Security | Disabled Access | Comments | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Typ | Category | |||||||||||||||
| loohcS mooR feR | tessA mooR edoC | epahS/eziS | tnemnorivnE | noitacoL | erutinruF dexiF | erutcurtsarfnI TCI | A | B | C | D | hgiH | muideM | woL | seY | oN | |
| Toilet | A122 | 0 | ||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| No disabled toilet provision on this level. | ||||||||||||||||
| Medical room | A124 | 0 | ||||||||||||||
| 1 | Area generally lacking heating. | |||||||||||||||
| 2 | No disabled access to medical room without having to exit the main building and re-enter. | |||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| Access door is narrower than required by current legislation. Access for wheelchair bound person requires them to exit the school and re-enter adjacent to this room due to stairs in corridor from admin area. | ||||||||||||||||
| Corridor | A125 | 0 | ||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| Spaces | Direct Impact on Education | H & S/ Security | Disabled Access | Comments | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Typ | Category | |||||||||||||||
| loohcS mooR feR | tessA mooR edoC | epahS/eziS | tnemnorivnE | noitacoL | erutinruF dexiF | erutcurtsarfnI TCI | A | B | C | D | hgiH | muideM | woL | seY | oN | |
| Staffroom | A127 | 1 | Not sufficiently large to comfortably allow full staff meetings. | |||||||||||||
| 0 | ||||||||||||||||
| 1 | Remote from remainder of school. Not heavily utilised. | |||||||||||||||
| 0 | ||||||||||||||||
| 1 | Lack of data and power outlets. | |||||||||||||||
| Narrow door width does not comply with current requirements for wheelchair access. | ||||||||||||||||
| Stair | A(cid:1005)25 | 0 | ||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| No disabled access to the upper floor meeting rooms. | ||||||||||||||||
| Kitchen | A461 | 0 | ||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| Narrow door width does not comply with current requirements for wheelchair access. |
| Spaces | Direct Impact on Education | H & S/ Security | Disabled Access | Comments | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Typ | Category | |||||||||||||||
| loohcS mooR feR | tessA mooR edoC | epahS/eziS | tnemnorivnE | noitacoL | erutinruF dexiF | erutcurtsarfnI TCI | A | B | C | D | hgiH | muideM | woL | seY | oN | |
| Conference room | A462a | 0 | ||||||||||||||
| ? | ||||||||||||||||
| 2 | No disabled access to this level. | |||||||||||||||
| 0 | ||||||||||||||||
| ? | ||||||||||||||||
| No disabled access to this level. | ||||||||||||||||
| Meeting room | A426 | 0 | ||||||||||||||
| ? | ||||||||||||||||
| 2 | No disabled access to this level. | |||||||||||||||
| 0 | ||||||||||||||||
| ? | ||||||||||||||||
| No disabled access to this level. |
| Spaces | Direct Impact on Education | H & S/ Security | Disabled Access | Comments | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Type | Category | |||||||||||||||
| euqinU mooR feR | noitangiseD mooR edoC | epahS/eziS | tnemnorivnE | noitacoL | erutinruF dexiF | erutcurtsarfnI TCI | A | B | C | D | hgiH | muideM | woL | seY | oN | |
| Class 1 | R151 | 2 | Room size well below recommended standard class area (BB98) | |||||||||||||
| 1 | Lighting poor. | |||||||||||||||
| 0 | ||||||||||||||||
| 2 | Student lockers in classroom, reduce space, access difficulties, lack of use. | |||||||||||||||
| 0 | 0 | |||||||||||||||
| Lockers access and lack of space for disabled | ||||||||||||||||
| Narrow door does not comply with current requirements. | ||||||||||||||||
| Class 2 | H304 | 1 | Room area marginal. | |||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| Narrow door does not comply with current requirements. |
| Spaces | Direct Impact on Education | H & S/ Security | Disabled Access | Comments | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Type | Category | |||||||||||||||
| euqinU mooR feR | noitangiseD mooR edoC | epahS/eziS | tnemnorivnE | noitacoL | erutinruF dexiF | erutcurtsarfnI TCI | A | B | C | D | hgiH | muideM | woL | seY | oN | |
| Class 3 | R161 | 2 | Room size well below recommended standard class area (BB98) | |||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| 2 | Student lockers in classroom, reduce space, access difficulties, lack of use. | |||||||||||||||
| 0 | ||||||||||||||||
| Lockers access and lack of space for disabled | ||||||||||||||||
| Narrow door does not comply with current requirements. | ||||||||||||||||
| Class 4 | R163 | 1 | Room area marginal. | |||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| 2 | Student lockers in classroom, reduce space, access difficulties, lack of use. | |||||||||||||||
| 0 | ||||||||||||||||
| Lockers access and lack of space for disabled | ||||||||||||||||
| Narrow door does not comply with current requirements. | ||||||||||||||||
| Office 5 | R167 | 0 | ||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| Narrow door does not comply with current requirements. | ||||||||||||||||
| Spaces | Direct Impact on Education | H & S/ Security | Disabled Access | Comments | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Type | Category | |||||||||||||||
| euqinU mooR feR | noitangiseD mooR edoC | epahS/eziS | tnemnorivnE | noitacoL | erutinruF dexiF | erutcurtsarfnI TCI | A | B | C | D | hgiH | muideM | woL | seY | oN | |
| Class 6 | R181 | 2 | Room size well below recommended standard class area (BB98) | |||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| 2 | Student lockers in classroom, reduce space, access difficulties, lack of use. | |||||||||||||||
| 0 | ||||||||||||||||
| Lockers access and lack of space for disabled | ||||||||||||||||
| Narrow door does not comply with current requirements. | ||||||||||||||||
| Class 7 | R183 | 1 | Room area marginal. | |||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| 2 | Student lockers in classroom, reduce space, access difficulties, lack of use. | |||||||||||||||
| 0 | ||||||||||||||||
| Lockers access and lack of space for disabled | ||||||||||||||||
| Narrow door does not comply with current requirements. |
| Spaces | Direct Impact on Education | H & S/ Security | Disabled Access | Comments | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Type | Category | |||||||||||||||
| euqinU mooR feR | noitangiseD mooR edoC | epahS/eziS | tnemnorivnE | noitacoL | erutinruF dexiF | erutcurtsarfnI TCI | A | B | C | D | hgiH | muideM | woL | seY | oN | |
| Lab 1 | L405 | 0/1 | Room area marginal. | |||||||||||||
| 1 | No blackout provision limits experiments. Mechanical vent. | |||||||||||||||
| 2 | At extreme end of ‘string’ of science labs, poor relationship to resources and Science staff facilities. Lack of prep room. | |||||||||||||||
| 1 | Fixed furniture layout restricts flexibility and supervision. Fume cupboards against wall limits visibility of experiments by students. | |||||||||||||||
| 0 | WIFI enabled | |||||||||||||||
| Single means of escape from room | ||||||||||||||||
| Narrow door does not meet current requirements. Access by way of poor quality lift opening directly into Lab 2 | ||||||||||||||||
| Lan 1x | L407 | 0/1 | Small group room. | |||||||||||||
| 0 | ||||||||||||||||
| 2 | At extreme end of ‘string’ of science labs, poor relationship to resources and Science staff facilities. | |||||||||||||||
| 0 | ||||||||||||||||
| 0 | WIFI enabled | |||||||||||||||
| Single means of escape from room if used for experiments. | ||||||||||||||||
| Narrow door does not meet current requirements. Access by way of poor quality lift opening directly into Lab 2 |
| Spaces | Direct Impact on Education | H & S/ Security | Disabled Access | Comments | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Type | Category | |||||||||||||||
| feR euqinU mooR | noitangiseD mooR edoC | epahS/eziS | tnemnorivnE | noitacoL | erutinruF dexiF | erutcurtsarfnI TCI | A | B | C | D | hgiH | muideM | woL | seY | oN | |
| Lab 2 | L406 | 0/1 | Room area marginal. | |||||||||||||
| 1 | No blackout provision limits experiments. No mechanical vent. | |||||||||||||||
| 1 | Poor relationship to Science staff facilities. | |||||||||||||||
| 1 | Fixed furniture layout restricts flexibility and supervision. Fume cupboards against wall limits visibility of experiments by students. | |||||||||||||||
| 0 | WIFI enabled | |||||||||||||||
| Ramped floor at main access to lab. Second escape through chemical store/prep room. | ||||||||||||||||
| Access by way of poor quality lift opening directly into Lab 2 | ||||||||||||||||
| Lab 2x | L404 | 0/1 | Small group room set up as computer room. | |||||||||||||
| 1 | Poor ventilation | |||||||||||||||
| 1 | Poor relationship to Science staff facilities. | |||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| Narrow door does not meet current requirements. Access by way of poor quality lift opening directly into Lab 2 | ||||||||||||||||
| Prep 2/3 | L408 | 0 | ||||||||||||||
| 1 | Poor ventilation | |||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| Lab 3 and 4 second means of escape is through the prep area, potentially impeded by furniture and equipment. | ||||||||||||||||
| Narrow door does not meet current requirements. Access by way of poor quality lift opening directly into Lab 2 |
| Spaces | Direct Impact on Education | H & S/ Security | Disabled Access | Comments | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Type | Category | |||||||||||||||
| feR euqinU mooR | noitangiseD mooR edoC | epahS/eziS | tnemnorivnE | noitacoL | erutinruF dexiF | erutcurtsarfnI TCI | A | B | C | D | hgiH | muideM | woL | seY | oN | |
| Lab 3 | L410 | 0/1 | Room area marginal. | |||||||||||||
| 1 | No blackout provision limits experiments. No mechanical ventilation. | |||||||||||||||
| 1 | Poor relationship to Science staff facilities. | |||||||||||||||
| 1 | Fixed furniture layout restricts flexibility and supervision. Fume cupboards against wall limits visibility of experiments by students. | |||||||||||||||
| 0 | WIFI enabled | |||||||||||||||
| Second means of escape through chemical store/prep room. | ||||||||||||||||
| Narrow door does not meet current requirements. Access by way of poor quality lift opening directly into Lab 2 | ||||||||||||||||
| Lab 4 | L(cid:1008)14 | 0/1 | Room area below norm. | |||||||||||||
| 1 | No blackout provision limits experiments. Mechanical vent. | |||||||||||||||
| 1 | Poor relationship to Science staff facilities. | |||||||||||||||
| 1 | Fixed furniture layout restricts flexibility and supervision. Fume cupboards against wall limits visibility of experiments by students. | |||||||||||||||
| 0 | WIFI enabled | |||||||||||||||
| Second means of escape through chemical store/prep room. | ||||||||||||||||
| Access by way of poor quality lift opening directly into Lab 2 | ||||||||||||||||
| Spaces | Direct Impact on Education | H & S/ Security | Disabled Access | Comments | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Type | Category | |||||||||||||||
| feR euqinU mooR | noitangiseD mooR edoC | epahS/eziS | tnemnorivnE | noitacoL | erutinruF dexiF | erutcurtsarfnI TCI | A | B | C | D | hgiH | muideM | woL | seY | oN | |
| Prep 4/5 | L(cid:1008)16 | 0 | ||||||||||||||
| 1 | Poor ventilation | |||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| Lab 3 and 4 second means of escape is through the prep area, potentially impeded by furniture and equipment. | ||||||||||||||||
| Room layout makes use and access difficult. | ||||||||||||||||
| Lab 5 | L(cid:1008)20 | 0/1 | Room area marginal. | |||||||||||||
| 1 | No blackout provision limits experiments. Mechanical vent. | |||||||||||||||
| 1 | Poor relationship to Science staff facilities. | |||||||||||||||
| 1 | Fixed furniture layout restricts flexibility and supervision. | |||||||||||||||
| 0 | WIFI e nabled | |||||||||||||||
| Second means of escape through chemical store/prep room. | ||||||||||||||||
| Access by way of poor quality lift opening directly into Lab 2 at far end of science ‘string’ of rooms | ||||||||||||||||
| Lab 6 | L(cid:1008)4(cid:1006) | 0/1 | Room area marginal. | |||||||||||||
| 1 | No blackout provision limits experiments. Mechanical ventilation. | |||||||||||||||
| 1 | Poor relationship to Science staff facilities. | |||||||||||||||
| 1 | Fixed furniture layout restricts flexibility and supervision. Lack of storage | |||||||||||||||
| 0 | WIFI e nabled | |||||||||||||||
| Second means of escape through chemical store/prep room. | ||||||||||||||||
| Access by way of poor quality lift opening directly into Lab 2 then lengthy narrow corridor. | ||||||||||||||||
| Spaces | Direct Impact on Education | H & S/ Security | Disabled Access | Comments | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Type | Category | |||||||||||||||
| euqinU mooR feR | noitangiseD mooR edoC | epahS/eziS | tnemnorivnE | noitacoL | erutinruF dexiF | erutcurtsarfnI TCI | A | B | C | D | hgiH | muideM | woL | seY | oN | |
| Prep 6/7 | L(cid:1008)4(cid:1007)A | 0 | ||||||||||||||
| 1 | Poor ventilation | |||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| Door widths and layout make use and access difficult. | ||||||||||||||||
| Lab 6 and 7 second means of escape for each classroom is through the prep area and adjoining classroom, potentially impeded by furniture and equipment. | ||||||||||||||||
| Lab 7 | L443 | 1 | Room area below norm. | |||||||||||||
| 1 | No blackout provision limits experiments. No mechanical vent. | |||||||||||||||
| 2 | Bad relationship to other science rooms due to linear layout and lack of corridor access | |||||||||||||||
| 1 | Fixed furniture layout restricts flexibility and supervision. Fume cupboards against wall limits visibility of experiments by students. | |||||||||||||||
| 0 | WIFI enabled | |||||||||||||||
| Second means of escape through chemical store/prep room and adjacent classroom. | ||||||||||||||||
| Access by way of poor quality lift opening directly into Lab 2 and then along narrow corridor and through adjacent classroom and prep areas. | ||||||||||||||||
| Staff | L(cid:1008)45 | 0 | ||||||||||||||
| 0 | ||||||||||||||||
| 2 | Bad relationship to other science rooms due to linear layout and lack of corridor access | |||||||||||||||
| 0 | ||||||||||||||||
| 0 | WIFI enabled | |||||||||||||||
| But access is through adjacent classrooms and prep room. |
| Spaces | Direct Impact on Education | H & S/ Security | Disabled Access | Comments | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Type | Category | |||||||||||||||
| euqinU mooR feR | noitangiseD mooR edoC | epahS/eziS | tnemnorivnE | noitacoL | erutinruF dexiF | erutcurtsarfnI TCI | A | B | C | D | hgiH | muideM | woL | seY | oN | |
| Lab 8 | C355 | 0/1 | Room area marginal. | |||||||||||||
| 0 | ||||||||||||||||
| 2 | Remote from remainder of science accommodation. On ground floor 150m from nearest science room. | |||||||||||||||
| 2 | No fume cupboard. | |||||||||||||||
| 0 | WIFI enabled | |||||||||||||||
| Remote from remainder of department. Staffing issues. | ||||||||||||||||
| Classroom used if there is a need for disabled access due to difficulties of using existing lift. |
| Spaces | Direct Impact on Education | H & S/ Security | Disabled Access | Comments | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Typ | Category | |||||||||||||||
| loohcS mooR feR | tessA mooR edoC | epahS/eziS | tnemnorivnE | noitacoL | erutinruF dexiF | erutcurtsarfnI TCI | A | B | C | D | hgiH | muideM | woL | seY | oN | |
| Room 8 classroom | R185 | 2 | Room severely undersized. | |||||||||||||
| 1 | Wind noise and draughts. | |||||||||||||||
| 0 | ||||||||||||||||
| 1 | Lockers in room reduces usable area. | |||||||||||||||
| 0 | ||||||||||||||||
| Shortage of space around furniture. | ||||||||||||||||
| Narrow doorways do not meet current requirements. | ||||||||||||||||
| Room9 classroom | R189 | 2 | Room severely undersized. | |||||||||||||
| 1 | Wind noise and draughts. | |||||||||||||||
| 0 | ||||||||||||||||
| 1 | Lockers in room reduces usable area. | |||||||||||||||
| 0 | ||||||||||||||||
| Shortage of space around furniture. | ||||||||||||||||
| Narrow doorways do not meet current requirements. | ||||||||||||||||
| Spaces | Direct Impact on Education | H & S/ Security | Disabled Access | Comments | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Typ | Category | |||||||||||||||
| loohcS mooR feR | tessA mooR edoC | epahS/eziS | tnemnorivnE | noitacoL | erutinruF dexiF | erutcurtsarfnI TCI | A | B | C | D | hgiH | muideM | woL | seY | oN | |
| Room 10 classroom | R202 | 2 | Room severely undersized. | |||||||||||||
| 1 | Wind noise and draughts. | |||||||||||||||
| 0 | ||||||||||||||||
| 1 | Lockers in room reduces usable area. | |||||||||||||||
| 0 | ||||||||||||||||
| Shortage of space around furniture. | ||||||||||||||||
| Narrow doorways do not meet current requirements. | ||||||||||||||||
| Room 11 classroom | R203 | 2 | Room severely undersized. | |||||||||||||
| 1 | Wind noise and draughts. | |||||||||||||||
| 0 | ||||||||||||||||
| 1 | Lockers in room reduces usable area. | |||||||||||||||
| 0 | ||||||||||||||||
| Shortage of space around furniture. | ||||||||||||||||
| Narrow doorways do not meet current requirements. | ||||||||||||||||
| Store | R204 | 1 | Small room | |||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| Narrow doorways do not meet current requirements. |
| Spaces | Direct Impact on Education | H & S/ Security | Disabled Access | Comments | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Typ | Category | |||||||||||||||
| loohcS mooR feR | tessA mooR edoC | epahS/eziS | tnemnorivnE | noitacoL | erutinruF dexiF | erutcurtsarfnI TCI | A | B | C | D | hgiH | muideM | woL | seY | oN | |
| Room 12 classroom | R206 | 1 | Room slightly undersized. | |||||||||||||
| 1 | Wind noise and draughts. Audible footfall from laboratory above. | |||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| Store | R206a | 1 | Small store. | |||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| Narrow doorways do not meet current requirements. | ||||||||||||||||
| Room 13 staffroom | R207 | 0 | ||||||||||||||
| 1 | Wind noise and draughts. | |||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| Narrow doorway does not meet current requirements. |
| Spaces | Direct Impact on Education | H & S/ Security | Disabled Access | Comments | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Typ | Category | |||||||||||||||
| loohcS mooR feR | tessA mooR edoC | epahS/eziS | tnemnorivnE | noitacoL | erutinruF dexiF | erutcurtsarfnI TCI | A | B | C | D | hgiH | muideM | woL | seY | oN | |
| Room PS2 classroom | U2(cid:1008)(cid:1005) | 2 | Room severely undersized. | |||||||||||||
| 0 | ||||||||||||||||
| 1 | Remote from remainder of maths classrooms | |||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| Shortage of space around furniture. | ||||||||||||||||
| Narrow doorways do not meet current requirements. | ||||||||||||||||
| Store | U2(cid:1008)(cid:1005)a | 1 | Small store. | |||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| Narrow doorway does not meet current requirements. | ||||||||||||||||
| Spaces | Direct Impact on Education | H & S/ Security | Disabled Access | Comments | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Type | Category | |||||||||||||||
| euqinU mooR feR | noitangiseD mooR edoC | epahS/eziS | tnemnorivnE | noitacoL | erutinruF dexiF | erutcurtsarfnI TCI | A | B | C | D | hgiH | muideM | woL | seY | oN | |
| Classrm F2 | F339 | Room size well below standards (BB98) | ||||||||||||||
| 1 | Poor lighting and no mechanical vent. Acoustic separation poor. Adjacent occupiers concerned about level of noise from classrooms. | |||||||||||||||
| 1 | Extremity of dead end corridor | |||||||||||||||
| 0 | ||||||||||||||||
| 1 | Lack of data and power outlets | |||||||||||||||
| Narrow corridors and dead end location results in overcrowding of corridors during class change. Layout of rooms inhibits supervision of corridor spaces. | ||||||||||||||||
| Narrow corridors hampers free movement. Narrow doorways do not meet current requirements. | ||||||||||||||||
| Classrm F3 | F338 | 1 | Room size well below standards (BB98) | |||||||||||||
| 1 | Acoustic separation poor. Adjacent occupiers concerned about level of noise from classrooms. | |||||||||||||||
| 1 | Extremity of dead end corridor | |||||||||||||||
| 0 | ||||||||||||||||
| 1 | Lack of data and power outlets | |||||||||||||||
| Narrow corridors and dead end location results in overcrowding of corridors during class change. | ||||||||||||||||
| Narrow co rridors hampe rs free move m ent. Narr ow doo rways do not meet current requirements. |
| Spaces | Direct Impact on Education | H & S/ Security | Disabled Access | Comments | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Type | Category | |||||||||||||||
| euqinU mooR feR | noitangiseD mooR edoC | epahS/eziS | tnemnorivnE | noitacoL | erutinruF dexiF | erutcurtsarfnI TCI | A | B | C | D | hgiH | muideM | woL | seY | oN | |
| Classrm F4 | F336 | 1 | Room size well below standards (BB98) | |||||||||||||
| 1 | Acoustic separation poor. Adjacent occupiers concerned about level of noise from classrooms. | |||||||||||||||
| 1 | Extremity of dead end corridor | |||||||||||||||
| 0 | ||||||||||||||||
| 1 | Lack of data and power outlets | |||||||||||||||
| Narrow corridors and dead end location results in overcrowding of corridors during class change. Layout of rooms inhibits supervision of corridor spaces. Windows open over external path. | ||||||||||||||||
| Narrow corridors hampers free movement. Narrow doorways do not meet current requirements. | ||||||||||||||||
| Group room F5 | F341 | 0 | ||||||||||||||
| 1 | Acoustic separation poor. Adjacent occupiers concerned about level of noise from classrooms. | |||||||||||||||
| 1 | Extremity of dead end corridor | |||||||||||||||
| 0 | ||||||||||||||||
| 1 | Lack of data and power outlets | |||||||||||||||
| Narrow corridors and dead end location results in overcrowding of corridors during class change. Layout of rooms inhibits supervision of corridor spaces. Windows open over external path. | ||||||||||||||||
| Narrow corridors hampers free movement. | ||||||||||||||||
| Group room F6 | F340 | 0 | ||||||||||||||
| 1 | Acoustic separation poor. Adjacent occupiers concerned about level of noise from classrooms. | |||||||||||||||
| 1 | Extremity of dead end corridor | |||||||||||||||
| 0 | ||||||||||||||||
| 1 | Lack of data and power outlets | |||||||||||||||
| Narrow corridors and dead end location results in overcrowding of corridors during class change. Layout of rooms inhibits supervision of corridor spaces. Windows open over external path. | ||||||||||||||||
| Narrow corridors hampers free movement. Narrow doorways do not meet current requirements. | ||||||||||||||||
| Spaces | Direct Impact on Education | H & S/ Security | Disabled Access | Comments | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Type | Category | |||||||||||||||
| euqinU mooR feR | noitangiseD mooR edoC | epahS/eziS | tnemnorivnE | noitacoL | erutinruF dexiF | erutcurtsarfnI TCI | A | B | C | D | hgiH | muideM | woL | seY | oN | |
| Office F7 | F331 | 0 | Doubles as small ‘speaking room’ | |||||||||||||
| 0 | ||||||||||||||||
| 1 | Extremity of dead end corridor | |||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| Narrow corridors and dead end location results in overcrowding of corridors during class change. Layout of rooms inhibits supervision of corridor spaces. | ||||||||||||||||
| Narrow corridors hampers free movement. Narrow doorways do not meet current requirements. | ||||||||||||||||
| Store F8 | F334 | 0 | ||||||||||||||
| 0 | ||||||||||||||||
| 1 | Extremity of dead end corridor | |||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| Narrow corridors and dead end location results in overcrowding of corridors during class change. | ||||||||||||||||
| Narrow co rridors hampe rs free move m ent. | ||||||||||||||||
| Staff room | 0 | |||||||||||||||
| 1 | Acoustic separation poor. Skylight only natural light. | |||||||||||||||
| 1 | Extremity of dead end corridor | |||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| Narrow corridors and dead end location results in overcrowding of corridors during class change. Layout of rooms inhibits supervision of corridor spaces. | ||||||||||||||||
| Narrow corridors hampers free movement. Narrow doorways do not meet current requirements. |
| Spaces | Direct Impact on Education | H & S/ Security | Disabled Access | Comments | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Type | Category | |||||||||||||||
| loohcS mooR fer | tessA mooR edoC | epahS/eziS | tnemnorivnE | noitacoL | erutinruF dexiF | erutcurtsarfnI TCI | A | B | C | D | hgiH | muideM | woL | seY | oN | |
| Classrm H6 | H322 | 0 | ||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| Risks from corridor congestion | ||||||||||||||||
| Narrow doors do not meet current regulations. | ||||||||||||||||
| Store | H322a | 0 | ||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| Risks from corridor congestion | ||||||||||||||||
| Narrow doors do not meet current regulations. |
| Spaces | Direct Impact on Education | H & S/ Security | Disabled Access | Comments | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Type | Category | |||||||||||||||
| loohcS mooR fer | tessA mooR edoC | epahS/eziS | tnemnorivnE | noitacoL | erutinruF dexiF | erutcurtsarfnI TCI | A | B | C | D | hgiH | muideM | woL | seY | oN | |
| Classrm H7 | H320 | 1 | Good sized room but without storage cbd/room. | |||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| Risks from corridor congestion | ||||||||||||||||
| Narrow doors do not meet current regulations. | ||||||||||||||||
| Office | H318 | 1 | Small staff base and office for Humanities Department. 8 staff. | |||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| Lack of privacy for individual Heads of Subject. | ||||||||||||||||
| Narrow doors do not meet current regulations. | ||||||||||||||||
| Classrm H8 | H316 | 1 | Room area marginal | |||||||||||||
| 1 | Room overheats. | |||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| Risks from corridor congestion | ||||||||||||||||
| Narrow doors do not meet current regulations. |
| Spaces | Direct Impact on Education | H & S/ Security | Disabled Access | Comments | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Type | Category | |||||||||||||||
| loohcS mooR fer | tessA mooR edoC | epahS/eziS | tnemnorivnE | noitacoL | erutinruF dexiF | erutcurtsarfnI TCI | A | B | C | D | hgiH | muideM | woL | seY | oN | |
| Classrm C1 | C350 | 2 | Room severely undersized. | |||||||||||||
| 0 | ||||||||||||||||
| 1 | Not adjoining C2. | |||||||||||||||
| 1 | Fixed furniture to rear of room limits capacity. | |||||||||||||||
| 0 | ||||||||||||||||
| Lack of space around desks. | ||||||||||||||||
| Narrow doors do not meet current regulations. Lack of space restricts movement of wheelchairs. | ||||||||||||||||
| Store C1 | C350a | 1 | Store too small for needs resulting in books being stored in classroom which is already too small. | |||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| Spaces | Direct Impact on Education | H & S/ Security | Disabled Access | Comments | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Type | Category | |||||||||||||||
| loohcS mooR fer | tessA mooR edoC | epahS/eziS | tnemnorivnE | noitacoL | erutinruF dexiF | erutcurtsarfnI TCI | A | B | C | D | hgiH | muideM | woL | seY | oN | |
| Classrm C3 | C356 | 2 | Room severely undersized. | |||||||||||||
| 0 | ||||||||||||||||
| 1 | Not adjoining C2. | |||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| Lack of space around desks. | ||||||||||||||||
| Narrow doors do not meet current regulations. Lack of space restricts movement of wheelchairs. | ||||||||||||||||
| Store C3 | C356a | 1 | Store too small for needs resulting in books being stored in classroom which is already too small. | |||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| Spaces | Direct Impact on Education | H & S/ Security | Disabled Access | Comments | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Type | Category | |||||||||||||||
| euqinU mooR feR | noitangiseD mooR edoC | epahS/eziS | tnemnorivnE | noitacoL | erutinruF dexiF | erutcurtsarfnI TCI | A | B | C | D | hgiH | muideM | woL | seY | oN | |
| Common room | U426 | 1 | Not sufficient space for entire 6th Form of 140-150 students. Lack of spaces for individual study. | |||||||||||||
| 2 | Extremes of temperature and very bad acoustics limit use of space. | |||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| Y13 common room | U415 | 1 | Insufficient space for private study for Y13 | |||||||||||||
| 1 | Poor environmental control. | |||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| Narrow door widths do not comply with current requirements for wheelchair access. | ||||||||||||||||
| Spaces | Direct Impact on Education | H & S/ Security | Disabled Access | Comments | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Type | Category | |||||||||||||||
| euqinU mooR feR | noitangiseD mooR edoC | epahS/eziS | tnemnorivnE | noitacoL | erutinruF dexiF | erutcurtsarfnI TCI | A | B | C | D | hgiH | muideM | woL | seY | oN | |
| Study room | U427 | 0 | ||||||||||||||
| 1 | Wide seasonal temperature variations and poor acoustics. | |||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| Computer area | 1 | Too small to meet demand for computer facilities. | ||||||||||||||
| 1 | Temp variations and poor acoustics. | |||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| Emotional First aid | U429 | 0 | ||||||||||||||
| 1 | No natural daylight. | |||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| Narrow door widths do not comply with current requirements for wheelchair access. |
| Spaces | Direct Impact on Education | H & S/ Security | Disabled Access | Comments | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Type | Category | |||||||||||||||
| euqinU mooR feR | noitangiseD mooR edoC | epahS/eziS | tnemnorivnE | noitacoL | erutinruF dexiF | erutcurtsarfnI TCI | A | B | C | D | hgiH | muideM | woL | seY | oN | |
| Group room | U422 | 0 | ||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| Narrow door widths do not comply with current requirements for wheelchair access. | ||||||||||||||||
| Head’s office | U424 | 0 | ||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| Door width too narrow. | ||||||||||||||||
| Teaching room | U430 | 1 | Classroom too small for year group. | |||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| Narrow door widths do not comply with current requirements for wheelchair access. |
| Spaces | Direct Impact on Education | H & S/ Security | Disabled Access | Comments | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Type | Category | |||||||||||||||
| loohcS mooR fer | tessA mooR edoC | epahS/eziS | tnemnorivnE | noitacoL | erutinruF dexiF | erutcurtsarfnI TCI | A | B | C | D | hgiH | muideM | woL | seY | oN | |
| Classrm H1 | H311 | 1 | Room of insufficient area for class size. Working area per student is insufficient. | |||||||||||||
| 1 | Lack of suitable temperature and ventilation. Room hot and stuffy throughout the year. | |||||||||||||||
| 1 | Location on narrow corridor which serves classrooms on both sides creates issues re class change. | |||||||||||||||
| 1 | Centrally located fixed furniture can obscure view of teacher and white board. | |||||||||||||||
| 0 | ||||||||||||||||
| Door width does not meet current requirements re wheelchair access. | ||||||||||||||||
| Classrm H2 | H313 | 1 | Room of insufficient area for class size. Far corner of room too far from teaching area/whiteboards. | |||||||||||||
| 1 | Lack of suitable temperature and ventilation. Room hot and stuffy throughout the year. | |||||||||||||||
| 1 | Location on narrow corridor which serves classrooms on both sides creates issues re class change. | |||||||||||||||
| 1 | Centrally located fixed furniture can obscure view of teacher and white board. | |||||||||||||||
| 0 | ||||||||||||||||
| Door width does not meet current requirements re wheelchair access. |
| Spaces | Direct Impact on Education | H & S/ Security | Disabled Access | Comments | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Type | Category | |||||||||||||||
| loohcS mooR fer | tessA mooR edoC | epahS/eziS | tnemnorivnE | noitacoL | erutinruF dexiF | erutcurtsarfnI TCI | A | B | C | D | hgiH | muideM | woL | seY | oN | |
| Office | H315 | 0 | ||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| Door width does not meet current requirements re wheelchair access. | ||||||||||||||||
| Small group room | H315a | 0 | ||||||||||||||
| 1 | Constant noise from IT cabinet renders the room unsuitable for sound recording and a poor space for teaching. Lack of adequate ventilation. | |||||||||||||||
| 1 | Access through office or Classroom H2 | |||||||||||||||
| 0 | ||||||||||||||||
| 1 | Noise from IT cabinet. | |||||||||||||||
| Door width does not meet current requirements re wheelchair access. |
| Spaces | Direct Impact on Education | H & S/ Security | Disabled Access | Comments | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Type | Category | |||||||||||||||
| euqinU mooR feR | noitangiseD mooR edoC | epahS/eziS | tnemnorivnE | noitacoL | erutinruF dexiF | erutcurtsarfnI TCI | A | B | C | D | hgiH | muideM | woL | seY | oN | |
| Studio | D211 | 1 | Small studio | |||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| Narrow doors do not meet current requirements for wheelchair access. | ||||||||||||||||
| Store | D211a | 1 | Small store | |||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| Narrow doors do not meet current requirements for wheelchair access. |
| Spaces | Direct Impact on Education | H & S/ Security | Disabled Access | Comments | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Type | Category | |||||||||||||||
| euqinU mooR feR | noitangiseD mooR edoC | epahS/eziS | tnemnorivnE | noitacoL | erutinruF dexiF | erutcurtsarfnI TCI | A | B | C | D | hgiH | muideM | woL | seY | oN | |
| Studio | D212 | 1 | Shape of space creates difficulties in teaching and supervision of students. | |||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| Store | D212a | 1 | ||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| Narrow door does not meet current requirements for wheelchair access. | ||||||||||||||||
| Anti room | D212b | 0 | ||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| Narrow door does not meet current requirements for wheelchair access. |
| Spaces | Direct Impact on Education | H & S/ Security | Disabled Access | Comments | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Type | Category | |||||||||||||||
| euqinU mooR feR | noitangiseD mooR edoC | epahS/eziS | tnemnorivnE | noitacoL | erutinruF dexiF | erutcurtsarfnI TCI | A | B | C | D | hgiH | muideM | woL | seY | oN | |
| Dark room | D212c | 0 | Not currently used as a dark room. | |||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| Studio | D213 | 1 | D1113 and D1114 are combined to form KS4 studio. | |||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| Kiln room | D213a | 0 | Not currently used. | |||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| Spaces | Direct Impact on Education | H & S/ Security | Disabled Access | Comments | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Type | Category | |||||||||||||||
| euqinU mooR feR | noitangiseD mooR edoC | epahS/eziS | tnemnorivnE | noitacoL | erutinruF dexiF | erutcurtsarfnI TCI | A | B | C | D | hgiH | muideM | woL | seY | oN | |
| Store | D213b | 1 | Small store. | |||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| Narrow door does not meet current requirements for wheelchair access. | ||||||||||||||||
| Store | D213c | 1 | ||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| Narrow door does not meet current requirements for wheelchair access. | ||||||||||||||||
| Studio | D214 | 1 | D1113 and D1114 are combined to form KS4 studio. | |||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| Spaces | Direct Impact on Education | H & S/ Security | Disabled Access | Comments | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Type | Category | |||||||||||||||
| euqinU mooR feR | noitangiseD mooR edoC | epahS/eziS | tnemnorivnE | noitacoL | erutinruF dexiF | erutcurtsarfnI TCI | A | B | C | D | hgiH | muideM | woL | seY | oN | |
| Store | D214a | 1 | Small store | |||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| Narrow door does not meet current requirements for wheelchair access. | ||||||||||||||||
| 6th form studio | D215 | 1 | Small studio restricts number of students and size of work pieces. | |||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| Store | D215a | 1 | ||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| Narrow door does not meet current requirements for wheelchair access. |
| Spaces | Direct Impact on Education | H & S/ Security | Disabled Access | Comments | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Type | Category | |||||||||||||||
| euqinU mooR feR | noitangiseD mooR edoC | epahS/eziS | tnemnorivnE | noitacoL | erutinruF dexiF | erutcurtsarfnI TCI | A | B | C | D | hgiH | muideM | woL | seY | oN | |
| Store | D214b | 0 | ||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| Narrow door does not meet current requirements for wheelchair access. |
| Spaces | Direct Impact on Education | H & S/ Security | Disabled Access | Comments | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Type | Category | |||||||||||||||
| euqinU mooR feR | noitangiseD mooR edoC | epahS/eziS | tnemnorivnE | noitacoL | erutinruF dexiF | erutcurtsarfnI TCI | A | B | C | D | hgiH | muideM | woL | seY | oN | |
| Teaching area | D217 | 0 | ||||||||||||||
| 1 | Large expanse of basic glazing leads to wide variations in temperature. | |||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| This room leads onto other labs and is therefore a bit of a corridor. | ||||||||||||||||
| Wkshop and staff base | D218 | 0 | ||||||||||||||
| 1 | Only natural light is from a skylight. | |||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| No facility for undertaking prep work producing fumes or dust – has to be carried out in classrooms. | ||||||||||||||||
| Spaces | Direct Impact on Education | H & S/ Security | Disabled Access | Comments | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Type | Category | |||||||||||||||
| euqinU mooR feR | noitangiseD mooR edoC | epahS/eziS | tnemnorivnE | noitacoL | erutinruF dexiF | erutcurtsarfnI TCI | A | B | C | D | hgiH | muideM | woL | seY | oN | |
| Head’s office | D219 | 0 | ||||||||||||||
| 1 | ||||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| Narrow door does not meet current requirements for wheelchair access. | ||||||||||||||||
| Wkshop/ main store | D218a | 1 | Shape/size of workshop preludes the correct setting out of major timber cutting equipment. | |||||||||||||
| 1 | Noisy when in use. Dust extract system for DT dept in corner of room. | |||||||||||||||
| 0 | ||||||||||||||||
| 1 | Fixed items hamper distribution of stores. | |||||||||||||||
| 0 | ||||||||||||||||
| Lack of suitable work area markings around machinery. Poor floor finish. | ||||||||||||||||
| Store | D220 | 0 | ||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| Narrow door does not meet current requirements for wheelchair access. |
| Spaces | Direct Impact on Education | H & S/ Security | Disabled Access | Comments | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Type | Category | |||||||||||||||
| euqinU mooR feR | noitangiseD mooR edoC | epahS/eziS | tnemnorivnE | noitacoL | erutinruF dexiF | erutcurtsarfnI TCI | A | B | C | D | hgiH | muideM | woL | seY | oN | |
| Graphics classrm DT6 | D223 | 1 | Small classroom – tight for groups of 22+ students. | |||||||||||||
| 1 | ||||||||||||||||
| 0 | ||||||||||||||||
| 1 | Plotter and 3D printers reduce usable space in room. | |||||||||||||||
| 0 | ||||||||||||||||
| Congestion in small room creates hazard. | ||||||||||||||||
| Heat treatmt room | D222 | 2 | Room too small to allow adequate supervision or teaching. Restricts number of students able to use. | |||||||||||||
| 2 | Size of room exacerbates issues with fume extract and heat buildup. | |||||||||||||||
| 0 | ||||||||||||||||
| 1 | Items of equipment take up large proportion of floor space. | |||||||||||||||
| 0 | ||||||||||||||||
| Tight space and hazardous processes increase health and safety risks. | ||||||||||||||||
| Wheelchair maneuverability severely restricted by size of room and fixed equipment. | ||||||||||||||||
| Lab DT7 | D225 | 1 | Small classroom – tight for groups of 22+ students doing practicals. | |||||||||||||
| 1 | No mechanical ventilation other than dust extract from machines. | |||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| Tight space for practical work. | ||||||||||||||||
| Spaces | Direct Impact on Education | H & S/ Security | Disabled Access | Comments | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Type | Category | |||||||||||||||
| euqinU mooR feR | noitangiseD mooR edoC | epahS/eziS | tnemnorivnE | noitacoL | erutinruF dexiF | erutcurtsarfnI TCI | A | B | C | D | hgiH | muideM | woL | seY | oN | |
| Lab DT 8 | D224 | 2 | Very small laboratory, use restricted to A level students due to size limitations. | |||||||||||||
| 1 | No mechanical vent, room warm in summer term. | |||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| Constricted space with consequential trip hazards. | ||||||||||||||||
| Food room DT1 | D245 | 1 | Lab too small for class sizes. No prep room | |||||||||||||
| 1 | Lab very warm, windows do not open far enough to help with ventilation. Condensation renders floors slippy. Noisy window fans. | |||||||||||||||
| 0 | ||||||||||||||||
| 1 | Insufficient space in lab for fridges etc. no provision for cooling food. | |||||||||||||||
| 1 | No IT provision in room. | |||||||||||||||
| Environmental conditions and lack of space generates a high H&S risk. No hand wash facility. | ||||||||||||||||
| Narrow door does not meet current requirements for wheelchair access. | ||||||||||||||||
| Lab DT2 | D243 | 1 | Small general teaching laboratory. | |||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| Narrow door does not meet current requirements for wheelchair access. |
| Spaces | Direct Impact on Education | H & S/ Security | Disabled Access | Comments | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Type | Category | |||||||||||||||
| euqinU mooR feR | noitangiseD mooR edoC | epahS/eziS | tnemnorivnE | noitacoL | erutinruF dexiF | erutcurtsarfnI TCI | A | B | C | D | hgiH | muideM | woL | seY | oN | |
| Store | D244 | 1 | Store too small, adjacent corridor used for storage. | |||||||||||||
| 0 | ||||||||||||||||
| 1 | Storage of foodstuffs should be in classroom. | |||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| Risk of contamination during movement of foodstuffs. | ||||||||||||||||
| Narrow door does not meet current requirements for wheelchair access. | ||||||||||||||||
| Store | D244a | 1 | Store too small, adjacent corridor used for storage. | |||||||||||||
| 0 | ||||||||||||||||
| 1 | Storage of foodstuffs should be in classroom. | |||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| Risk of contamination during movement of foodstuffs. | ||||||||||||||||
| Narrow door does not meet current requirements for wheelchair access. | ||||||||||||||||
| Lab Textiles DT3 | D236 | 1 | Redundant food preparation area limits functionality. | |||||||||||||
| 1 | Room generally cold. | |||||||||||||||
| 0 | ||||||||||||||||
| 1 | Insufficient space for sewing machines. | |||||||||||||||
| 0 | ||||||||||||||||
| Narrow door does not meet current requirements for wheelchair access. |
| Spaces | Direct Impact on Education | H & S/ Security | Disabled Access | Comments | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Type | Category | |||||||||||||||
| euqinU mooR feR | noitangiseD mooR edoC | epahS/eziS | tnemnorivnE | noitacoL | erutinruF dexiF | erutcurtsarfnI TCI | A | B | C | D | hgiH | muideM | woL | seY | oN | |
| Store | D236a | 1 | Small store, not large enough for rolls of material or large work pieces. | |||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| Narrow door does not meet current requirements for wheelchair access. | ||||||||||||||||
| Store | D252 | 1 | Large store but aspect ratio renders much of the space useless. | |||||||||||||
| 1 | No control of condition for storage of materials or work pieces. | |||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| Narrow door does not meet current requirements for wheelchair access. | ||||||||||||||||
| Textiles Classrm DT4 | D254 | 1 | Room of insufficient size for KS3 classes of 22+ students. No dedicated space for A Level students. | |||||||||||||
| 1 | Cold room with no specific ventilation. | |||||||||||||||
| 1 | Remote from Art Dept for A Level Art Design Textiles students and shared technician. | |||||||||||||||
| 1 | Washing facilitates for dying and cleaning of work pieces is insufficient. | |||||||||||||||
| 0 | ||||||||||||||||
| Narrow door does not meet current requirements for wheelchair access. |
| Spaces | Direct Impact on Education | H & S/ Security | Disabled Access | Comments | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Type | Category | |||||||||||||||
| loohcS mooR feR | tessA mooR edoC | epahS/eziS | tnemnorivnE | noitacoL | erutinruF dexiF | erutcurtsarfnI TCI | A | B | C | D | hgiH | muideM | woL | seY | oN | |
| Studio 1 | H310 | 2 | Good sized space seriously compromised by two columns near the centre of the room | |||||||||||||
| 1 | Hard acoustic and lack of soundproofing | |||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| 1 | Poor provision of data and power outlets | |||||||||||||||
| Lack of storage space. | ||||||||||||||||
| Narrow door width does not comply with current requirements for wheelchair access. | ||||||||||||||||
| Studio 2 | H314 | 1 | Small space well below recommended area (BB98) | |||||||||||||
| 1 | Hard acoustic and lack of soundproofing | |||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| 1 | Poor provision of data and power outlets | |||||||||||||||
| Lack of storage space. Narrow adjacent corridors. | ||||||||||||||||
| Narrow door width does not comply with current requirements for wheelchair access. | ||||||||||||||||
| Spaces | Direct Impact on Education | H & S/ Security | Disabled Access | Comments | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Type | Category | |||||||||||||||
| euqinU mooR feR | noitangiseD mooR edoC | epahS/eziS | tnemnorivnE | noitacoL | erutinruF dexiF | erutcurtsarfnI TCI | A | B | C | D | hgiH | muideM | woL | seY | oN | |
| Classrm 1 | M170 | 0 | ||||||||||||||
| 1 | Hard acoustic and lack of soundproofing | |||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| Lack of storage space for instruments leading to storage in corridors. Narrow corridors. | ||||||||||||||||
| Narrow doors to accommodation from narrow corridors and ramped access corridor. | ||||||||||||||||
| Classrm 2 | M172 | 0 | ||||||||||||||
| 1 | Hard acoustic and lack of soundproofing | |||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| Lack of storage space for instruments leading to storage in corridors. Narrow corridors. | ||||||||||||||||
| Narrow doors to accommodation from narrow corridors and ramped access corridor. | ||||||||||||||||
| Spaces | Direct Impact on Education | H & S/ Security | Disabled Access | Comments | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Type | Category | |||||||||||||||
| euqinU mooR feR | noitangiseD mooR edoC | epahS/eziS | tnemnorivnE | noitacoL | erutinruF dexiF | erutcurtsarfnI TCI | A | B | C | D | hgiH | muideM | woL | seY | oN | |
| Practice 1 | M166 | 1 | Small room with limited capacity for group practice. | |||||||||||||
| 1 | Poor acoustic isolation | |||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| 1 | Poor provision of data and power outlets | |||||||||||||||
| Lack of storage space for instruments leading to storage in corridors. Narrow corridors. | ||||||||||||||||
| Narrow doors to accommodation from narrow corridors | ||||||||||||||||
| Practice 2 | M168 | 1 | ||||||||||||||
| 1 | ||||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| 1 | ||||||||||||||||
| Lack of storage space for instruments leading to storage in corridors. Narrow corridors. | ||||||||||||||||
| Narrow doors to accommodation from narrow corridors and ramped corridor. | ||||||||||||||||
| IT room | M170a | 1 | Small internal room too small for large group work | |||||||||||||
| 1 | No natural light or ventilation | |||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| Narrow doors to accommodation from narrow corridors and ramped corridor. |
| Spaces | Direct Impact on Education | H & S/ Security | Disabled Access | Comments | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Typ | Category | |||||||||||||||
| euqinU mooR feR | noitangiseD mooR edoC | epahS/eziS | tnemnorivnE | noitacoL | erutinruF dexiF | erutcurtsarfnI TCI | A | B | C | D | hgiH | muideM | woL | seY | oN | |
| Library | P137 | 0 | ||||||||||||||
| 1 | Stuffy and warm in summer, air movement supplemented by floor mounted fans. Acoustics generally good but can be affected by footfall from 6th Form area above. | |||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| Supervision by single member of staff. | ||||||||||||||||
| Library office | P192 | 0 | ||||||||||||||
| 1 | Very warm all year. | |||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| Narrow doors do not meet current requirements. |
| Spaces | Direct Impact on Education | H & S/ Security | Disabled Access | Comments | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Typ | Category | |||||||||||||||
| loohcS mooR feR | tessA mooR edoC | epahS/eziS | tnemnorivnE | noitacoL | erutinruF dexiF | erutcurtsarfnI TCI | A | B | C | D | hgiH | muideM | woL | seY | oN | |
| Study room | R190 | 1 | Small room for quiet study. Capacity 6. | |||||||||||||
| 1 | Mechanically ventilated but gets warm when used. | |||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| Narrow doors do not meet current regulations. | ||||||||||||||||
| Computer room | 1 | Small ‘bookable’ IT classroom with capacity of 17, remainder of class use computers in the library. | ||||||||||||||
| 1 | Mechanically ventilated but gets warm when used. | |||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| Supervision of room and library overflow not satisfactory. | ||||||||||||||||
| Spaces | Direct Impact on Education | H & S/ Security | Disabled Access | Comments | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Type | Category | |||||||||||||||
| euqinU mooR feR | noitangiseD mooR edoC | epahS/eziS | tnemnorivnE | noitacoL | erutinruF dexiF | erutcurtsarfnI TCI | A | B | C | D | hgiH | muideM | woL | seY | oN | |
| Sports hall | S(cid:1007)67 | 0 | ||||||||||||||
| 1 | Hard acoustic reduces comprehension during teaching. | |||||||||||||||
| 1 | Remote location causes loss of teaching time. | |||||||||||||||
| 0 | ||||||||||||||||
| 1 | Lack of audio or video resource | |||||||||||||||
| External access over trafficked area in front of school | ||||||||||||||||
| Some threshold issues. | ||||||||||||||||
| Sports hall storage | S(cid:1007)67a | 1 | Storage space inadequate | |||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| External access over trafficked area in front of school | ||||||||||||||||
| Spaces | Direct Impact on Education | H & S/ Security | Disabled Access | Comments | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Type | Category | |||||||||||||||
| euqinU mooR feR | noitangiseD mooR edoC | epahS/eziS | tnemnorivnE | noitacoL | erutinruF dexiF | erutcurtsarfnI TCI | A | B | C | D | hgiH | muideM | woL | seY | oN | |
| Gym | G(cid:1007)83 | 2 | Aspect ratio and size preclude use for court sports. Used as exam room. | |||||||||||||
| 1 | ||||||||||||||||
| 1 | Remote location causes loss of teaching time. | |||||||||||||||
| 0 | ||||||||||||||||
| 1 | Lack of audio or video resource | |||||||||||||||
| External access over trafficked area in front of school. | ||||||||||||||||
| Some threshold issues. | ||||||||||||||||
| Gym storage | G(cid:1007)83a | 1 | Storage space inadequate, large items stored in gym reducing usable space. | |||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| Items stored in gym. | ||||||||||||||||
| Changing Rooms | G(cid:1007)84 | 1 | Only one male and one female. | |||||||||||||
| G(cid:1007)90 | 2 | Very poor environmental conditions. | ||||||||||||||
| 1 | Remote from external playing fields. | |||||||||||||||
| 1 | Poor layout of benches, no lockers for lettings or student use. | |||||||||||||||
| 0 | ||||||||||||||||
| Spaces | Direct Impact on Education | H & S/ Security | Disabled Access | Comments | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Type | Category | |||||||||||||||
| euqinU mooR feR | noitangiseD mooR edoC | epahS/eziS | tnemnorivnE | noitacoL | erutinruF dexiF | erutcurtsarfnI TCI | A | B | C | D | hgiH | muideM | woL | seY | oN | |
| PE Classrm | G(cid:1007)81 | 0 | Size suitable but there is only one classroom. Use of another classroom in school reduces teaching time. | |||||||||||||
| 1 | Poor lighting and general ventilation conditions. Used for public lettings. | |||||||||||||||
| 1 | Remote location can cause loss of teaching time. | |||||||||||||||
| 0 | ||||||||||||||||
| 1 | Lack of data and power points. | |||||||||||||||
| External access over trafficked area in front of school. | ||||||||||||||||
| Threshold issues. | ||||||||||||||||
| Staff office | 0 | |||||||||||||||
| 0 | ||||||||||||||||
| 1 | Remote from remainder of school but centrally located in PE Dept. | |||||||||||||||
| 0 | ||||||||||||||||
| 1 | Lack of data and power points. | |||||||||||||||
| External access over trafficked area in front of school. | ||||||||||||||||
| Threshold issues. | ||||||||||||||||
| Fitness suite | S(cid:1008)71 | 1 | Small cramped space. | |||||||||||||
| 2 | Poor environmental conditions. | |||||||||||||||
| 2 | First floor with no disabled access | |||||||||||||||
| 1 | Equipment cramped in space. | |||||||||||||||
| 1 | Lack of data and power points. | |||||||||||||||
| Equipment tightly arranged, intrusive roof structure. | ||||||||||||||||
| First floor, no lift provision. |
| Spaces | Direct Impact on Education | H & S/ Security | Disabled Access | Comments | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Type | Category | |||||||||||||||
| euqinU mooR feR | noitangiseD mooR edoC | epahS/eziS | tnemnorivnE | noitacoL | erutinruF dexiF | erutcurtsarfnI TCI | A | B | C | D | hgiH | muideM | woL | seY | oN | |
| Head’s office | G(cid:1007)82 | 1 | Small room | |||||||||||||
| 1 | No external windows, poor ventilation. | |||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| Narrow door does not comply with current requirements for wheelchair access. | ||||||||||||||||
| General storage | 1 | Lack of appropriate storage, | ||||||||||||||
| 0 | ||||||||||||||||
| 2 | Items and furniture stored in corridors. | |||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| Corridors used for storage creates hazard. | ||||||||||||||||
| Narrow door does not comply with current requirements for wheelchair access. | ||||||||||||||||
| External fields | 0 | |||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| Spaces | Direct Impact on Education | H & S/ Security | Disabled Access | Comments | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Type | Category | |||||||||||||||
| loohcS mooR fer | tessA mooR edoC | epahS/eziS | tnemnorivnE | noitacoL | erutinruF dexiF | erutcurtsarfnI TCI | A | B | C | D | hgiH | muideM | woL | seY | oN | |
| SENCO office | F(cid:1007)32 | 0 | ||||||||||||||
| 0 | ||||||||||||||||
| 1 | Fragmented disposition of accommodation results in management and staffing difficulties. | |||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| Access door is narrower than required by current requirements.. | ||||||||||||||||
| SC 1 | H(cid:1007)2(cid:1008) | 2 | Cognitive area – lack of area severely restricts usage by vulnerable students particularly at lunchtime. There are 227 students who are recognized as potential users of the accommodation. | |||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| 1 | Lack of data and power outlets | |||||||||||||||
| Access door is narrower than required by current legislation. External thresholds do not meet current regulations. |
| Spaces | Direct Impact on Education | H & S/ Security | Disabled Access | Comments | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Type | Category | |||||||||||||||
| loohcS mooR fer | tessA mooR edoC | epahS/eziS | tnemnorivnE | noitacoL | erutinruF dexiF | erutcurtsarfnI TCI | A | B | C | D | hgiH | muideM | woL | seY | oN | |
| SC 2 | H(cid:1007)(cid:1006)(cid:1008)a | 2 | Nurture area – use restricted by current size of room. | |||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| 1 | Lack of data and power outlets. | |||||||||||||||
| Access door is narrower than required by current requirements for wheelchair access. | ||||||||||||||||
| Kitchen | 0 | |||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| SC 3 unit | H(cid:1007)19 | 1/2 | Adequacy of space varies from year to year depending on specific needs of students. | |||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| 1 | Lack of data and power outlets. | |||||||||||||||
| Access door is narrower than required by current requirements. External thresholds do not meet current regulations. |
| Spaces | Direct Impact on Education | H & S/ Security | Disabled Access | Comments | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Type | Category | |||||||||||||||
| loohcS mooR fer | tessA mooR edoC | epahS/eziS | tnemnorivnE | noitacoL | erutinruF dexiF | erutcurtsarfnI TCI | A | B | C | D | hgiH | muideM | woL | seY | oN | |
| Unit Physio/ shower | H(cid:1007)(cid:1006)(cid:1005) | 0 | ||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| Access door is narrower than required by current requirements for wheelchair access. | ||||||||||||||||
| Unit physio/ wc | H327 | 0 | ||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| Access door is narrower than required by current requirements for wheelchair access. | ||||||||||||||||
| Unit Sensory room | H(cid:1007)17 | 1 | Small space off of corridor. | |||||||||||||
| 1 | Curtained off space. | |||||||||||||||
| 2 | Located off of corridor – lack of privacy | |||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| Spaces | Direct Impact on Education | H & S/ Security | Disabled Access | Comments | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Type | Category | |||||||||||||||
| loohcS mooR fer | tessA mooR edoC | epahS/eziS | tnemnorivnE | noitacoL | erutinruF dexiF | erutcurtsarfnI TCI | A | B | C | D | hgiH | muideM | woL | seY | oN | |
| Unit Group room | H(cid:1007)25 | 0 | ||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| Access door is narrower than required by current requirements for wheelchair access. | ||||||||||||||||
| Unit office | H300 | 1 | Small room unsuited to current use | |||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| Access door is narrower than required by current requirements for wheelchair access. | ||||||||||||||||
| Unit ‘prefab’ | (cid:1009) (cid:1011) | 0 | ||||||||||||||
| 0 | ||||||||||||||||
| 2 | Remote from remainder of unit and consequently difficult to manage and underused. | |||||||||||||||
| 0 | ||||||||||||||||
| 1 | Lack of data and power outlets | |||||||||||||||
| Access door is narrower than required by current requirements. External thresholds do not meet current regulations. Access by ramp. |
| Spaces | Direct Impact on Education | H & S/ Security | Disabled Access | Comments | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Type | Category | |||||||||||||||
| loohcS mooR fer | tessA mooR edoC | epahS/eziS | tnemnorivnE | noitacoL | erutinruF dexiF | erutcurtsarfnI TCI | A | B | C | D | hgiH | muideM | woL | seY | oN | |
| SC 4 Mobile | (cid:1009) (cid:1008) | 0 | ||||||||||||||
| 0 | ||||||||||||||||
| 2 | Remote from remainder of unit and consequently difficult to manage. Two staff required at all times. | |||||||||||||||
| 0 | ||||||||||||||||
| 1 | Lack of data and power outlets. | |||||||||||||||
| Access door is narrower than required by current requirements. External thresholds do not meet |
| Spaces | Direct Impact on Education | H & S/ Security | Disabled Access | Comments | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Type | Category | |||||||||||||||
| euqinU mooR feR | noitangiseD mooR edoC | epahS/eziS | tnemnorivnE | noitacoL | erutinruF dexiF | erutcurtsarfnI TCI | A | B | C | D | hgiH | muideM | woL | seY | oN | |
| Entrance | 1 | Small entrance foyer space. Congested at break and lunch times. Used for deliveries. | ||||||||||||||
| 2 | Cold and draughty space during inclement weather. | |||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| Can become cluttered. | ||||||||||||||||
| Admin corridor | A103 | 1 | Narrow corridor occasionally used for storage of incoming goods. | |||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| Spaces | Direct Impact on Education | H & S/ Security | Disabled Access | Comments | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Type | Category | |||||||||||||||
| euqinU mooR feR | noitangiseD mooR edoC | epahS/eziS | tnemnorivnE | noitacoL | erutinruF dexiF | erutcurtsarfnI TCI | A | B | C | D | hgiH | muideM | woL | seY | oN | |
| Staff corridor | A125 | 0 | ||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| Congestion related risks | ||||||||||||||||
| Only wheelchair accessible from outside. Steps on corridor to admin area. | ||||||||||||||||
| English corridor | R153 | 1 | Narrow corridor with high usage resulting in congestion. | |||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| Congestion related risks. | ||||||||||||||||
| English corridor | R159 | 1 | Narrow corridor with high usage resulting in congestion. | |||||||||||||
| 1 | Toilet hand driers create acoustic problems. | |||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| Congestion related risks | ||||||||||||||||
| Spaces | Direct Impact on Education | H & S/ Security | Disabled Access | Comments | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Type | Category | |||||||||||||||
| euqinU mooR feR | noitangiseD mooR edoC | epahS/eziS | tnemnorivnE | noitacoL | erutinruF dexiF | erutcurtsarfnI TCI | A | B | C | D | hgiH | muideM | woL | seY | oN | |
| English corridor | R165 | 1 | Narrow corridor junction with stair from upper floor. | |||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| Congestion related risks | ||||||||||||||||
| Maths corridor | R(cid:1005) (cid:1011) | 1 | Narrow corridor with high usage resulting in congestion. | |||||||||||||
| 1 | Toilet hand driers create acoustic problems. | |||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| Congestion related risks | ||||||||||||||||
| Maths corridor | R210 | 1 | Narrow corridor junction with stair from upper floor. | |||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| Congestion related risks | ||||||||||||||||
| Spaces | Direct Impact on Education | H & S/ Security | Disabled Access | Comments | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Type | Category | |||||||||||||||
| euqinU mooR feR | noitangiseD mooR edoC | epahS/eziS | tnemnorivnE | noitacoL | erutinruF dexiF | erutcurtsarfnI TCI | A | B | C | D | hgiH | muideM | woL | seY | oN | |
| Art Corridor | D210 | 1 | Narrow dead end corridor. | |||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| Congestion related risks | ||||||||||||||||
| No wheelchair access other than through classrooms. | ||||||||||||||||
| D&T corridor | 1 | Narrow corridor. | ||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| D&T corridor | D(cid:1006)50 | 1 | Narrow corridor. | |||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| Spaces | Direct Impact on Education | H & S/ Security | Disabled Access | Comments | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Type | Category | |||||||||||||||
| euqinU mooR feR | noitangiseD mooR edoC | epahS/eziS | tnemnorivnE | noitacoL | erutinruF dexiF | erutcurtsarfnI TCI | A | B | C | D | hgiH | muideM | woL | seY | oN | |
| Access to D&T/Art | D(cid:1006)(cid:1007)(cid:1009) | 1 | Narrow corridor at junction of main thoroughfare. | |||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| Congestion related risks. | ||||||||||||||||
| Wheelchair access to D&T and Art by way of platform lift. | ||||||||||||||||
| Cooking corridor | D(cid:1006)(cid:1008)(cid:1006) | 1 | Narrow corridor. | |||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| 1 | Storage cupboards and filing cabinets along walls. | |||||||||||||||
| 0 | ||||||||||||||||
| Congestion related risks. | ||||||||||||||||
| Library corridor | P135 | 1 | Wide corridor with severe bottlenecks at each end. Sometimes used as a chair/table store. | |||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| Congestion related risks. | ||||||||||||||||
| Spaces | Direct Impact on Education | H & S/ Security | Disabled Access | Comments | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Type | Category | |||||||||||||||
| euqinU mooR feR | noitangiseD mooR edoC | epahS/eziS | tnemnorivnE | noitacoL | erutinruF dexiF | erutcurtsarfnI TCI | A | B | C | D | hgiH | muideM | woL | seY | oN | |
| Music corridor | M149 | 1 | Very narrow, partially sloping dead end corridor. | |||||||||||||
| 1 | Poor acoustics. | |||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| Congestion related risks. | ||||||||||||||||
| Music corridor | M1(cid:1008) | 1 | Very narrow dead end corridor | |||||||||||||
| 1 | Poor acoustics. | |||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| Congestion related risks. | ||||||||||||||||
| Human’ corridor | H326 | 1 | Narrow partially sloping corridor | |||||||||||||
| 1 | Poor acoustics. | |||||||||||||||
| 0 | ||||||||||||||||
| 1 | Filing cabinets and other storage along walls. | |||||||||||||||
| 0 | ||||||||||||||||
| Congestion related risks. Classrooms both sides of narrow corridor. | ||||||||||||||||
| Spaces | Direct Impact on Education | H & S/ Security | Disabled Access | Comments | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Type | Category | |||||||||||||||
| euqinU mooR feR | noitangiseD mooR edoC | epahS/eziS | tnemnorivnE | noitacoL | erutinruF dexiF | erutcurtsarfnI TCI | A | B | C | D | hgiH | muideM | woL | seY | oN | |
| Human’ corridor | H3(cid:1009)(cid:1005) | 1 | Narrow corridor. | |||||||||||||
| 1 | P oor acoustics | |||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| Congestion related risks. | ||||||||||||||||
| Language corridor | F330 | 1 | Narrow partially sloping corridor. | |||||||||||||
| 1 | Poor acoustics. | |||||||||||||||
| 1 | Dead end corridor. | |||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| Congestion related risks. | ||||||||||||||||
| Human’ corridor | C351 | 1 | Corridor constricted at each end. | |||||||||||||
| 1 | Poor acoustics. | |||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| Congestion related risks. | ||||||||||||||||
| Spaces | Direct Impact on Education | H & S/ Security | Disabled Access | Comments | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Type | Category | |||||||||||||||
| euqinU mooR feR | noitangiseD mooR edoC | epahS/eziS | tnemnorivnE | noitacoL | erutinruF dexiF | erutcurtsarfnI TCI | A | B | C | D | hgiH | muideM | woL | seY | oN | |
| PE corridor | C365 | 1 | Narrow corridor. | |||||||||||||
| 1 | Poor acoustics. | |||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| Congestion related risks. | ||||||||||||||||
| Staff corridor First floor | A(cid:1008)(cid:1010) | 0 | ||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| No lift to first floor in this area. | ||||||||||||||||
| Science corridor | L400 | 1 | Narrow corridor. | |||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| Congestion related risks | ||||||||||||||||
| Spaces | Direct Impact on Education | H & S/ Security | Disabled Access | Comments | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Type | Category | |||||||||||||||
| euqinU mooR feR | noitangiseD mooR edoC | epahS/eziS | tnemnorivnE | noitacoL | erutinruF dexiF | erutcurtsarfnI TCI | A | B | C | D | hgiH | muideM | woL | seY | oN | |
| Science/ 6th form corridor | L409 | 1 | Narrow, partially sloping corridor | |||||||||||||
| 2 | Extremes of temperature and very poor aesthetics – roof ductwork, ponding etc. | |||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| Congestion related risks. | ||||||||||||||||
| By way of small lift which opens out into Lab 2. | ||||||||||||||||
| Science/ 6th form corridor | L411 | 1 | Narrow corridor | |||||||||||||
| 2 | Extremes of temperature and very poor aesthetics – roof ductwork, ponding etc. | |||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| Congestion related risks. | ||||||||||||||||
| By way of small lift which opens out into Lab 2. | ||||||||||||||||
| Science/ 6th form corridor | L418 | 1 | Narrow corridor | |||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| Congestion related risks. | ||||||||||||||||
| By way of small lift which opens out into Lab 2. |
| Spaces | Direct Impact on Education | H & S/ Security | Disabled Access | Comments | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Type | Category | |||||||||||||||
| euqinU mooR feR | noitangiseD mooR edoC | epahS/eziS | tnemnorivnE | noitacoL | erutinruF dexiF | erutcurtsarfnI TCI | A | B | C | D | hgiH | muideM | woL | seY | oN | |
| Stairwell | R208 | 1 | Narrow stair. | |||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| Congestion related risks. | ||||||||||||||||
| No lift access to first floor in this area. |
| Spaces | Direct Impact on Education | H & S/ Security | Disabled Access | Comments | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Type | Category | |||||||||||||||
| loohcS mooR fer | tessA mooR edoC | epahS/eziS | tnemnorivnE | noitacoL | erutinruF dexiF | erutcurtsarfnI TCI | A | B | C | D | hgiH | muideM | woL | seY | oN | |
| Dining room | K130 | 2 | Dining hall vastly undersized. Main hall has to be used to cater for the numbers of diners. | |||||||||||||
| 0 | ||||||||||||||||
| 1 | Proximity to main entrance causes congestion at break and lunch times. | |||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| Lack of space between tables and around server area creates potential hazard. | ||||||||||||||||
| Frozen goods store | K132 | 1 | Large freezer in rear of store. Inefficient use of space. | |||||||||||||
| 1 | Condensation/moisture from freezer affecting ceiling finish in store room. | |||||||||||||||
| 2 | Frozen goods store accessed from dining area and stocked by way of main school entrance. | |||||||||||||||
| 1 | Freezer takes up much of the available space with the door swing further limiting storage. | |||||||||||||||
| 0 | ||||||||||||||||
| Potential hazard moving goods into and out of store. | ||||||||||||||||
| Narrow door does not meet current requirements for wheelchair access. |
| Spaces | Direct Impact on Education | H & S/ Security | Disabled Access | Comments | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Type | Category | |||||||||||||||
| loohcS mooR fer | tessA mooR edoC | epahS/eziS | tnemnorivnE | noitacoL | erutinruF dexiF | erutcurtsarfnI TCI | A | B | C | D | hgiH | muideM | woL | seY | oN | |
| Kitchen | K134 | 2 | Kitchen area very constrained limiting opportunities. | |||||||||||||
| 1 | Acoustics poor. | |||||||||||||||
| 0 | ||||||||||||||||
| 2 | Congested area. | |||||||||||||||
| 0 | ||||||||||||||||
| Congested kitchen area - risk of injury. | ||||||||||||||||
| No space for maneuvering of wheelchairs. Kitchen not set up for wheelchair use. | ||||||||||||||||
| Servery | K134 | 2 | Server area severely congested at lunch times. | |||||||||||||
| 1 | Acoustics poor. | |||||||||||||||
| 0 | ||||||||||||||||
| 1 | Till layout determined by available space. Queuing requires supervision. | |||||||||||||||
| 0 | ||||||||||||||||
| Congested area – risk of injury. | ||||||||||||||||
| Wheelchair accessible but constrained space. |
| Spaces | Direct Impact on Education | H & S/ Security | Disabled Access | Comments | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Type | Category | |||||||||||||||
| loohcS mooR fer | tessA mooR edoC | epahS/eziS | tnemnorivnE | noitacoL | erutinruF dexiF | erutcurtsarfnI TCI | A | B | C | D | hgiH | muideM | woL | seY | oN | |
| Office | R155 | 1 | Small office for site manager and assistant. | |||||||||||||
| 1 | No natural light | |||||||||||||||
| 0 | ||||||||||||||||
| 0 | ||||||||||||||||
| 1 | Lack of data and power outlets | |||||||||||||||
| Narrow door does not comply with current requirements re wheelchair access. |
| Zone | |
|---|---|
| 1 – Entrance area | Lack of visual ‘presence’ and gravitas. |
| 2 – Admin area | A mix of single and two storey flat and pitched roof structures, vaguely ‘Art Deco’ in style. Centrally located offices and service accommodation. |
| 3 – Kitchen/dining/hall | Centrally located facility but location close to main entrance causes congestion at break and lunch times. Combined area of hall and dining area just sufficient to deal with in excess of 700 meals at lunch time. No adequate storage space for tables and chairs when not in use. |
| 4 – English, maths and science | Two storey brick structure with pitched slated roof. Maths and English classrooms generally below acceptable area for class sizes. Science classrooms on first floor generally closer to minimum area required for class sizes. Corridors feeding these rooms well below acceptable width. |
| 5 – Humanities | Humanities subjects relatively closely grouped but without sufficient classrooms for all teachers. Geography classrooms generously sized and linked by a folding partition. |
| 6 – Languages | Single storey masonry construction under a tiled pitched roof. Dead end location. |
| 7 – PE | Remotely located facility housed in a mix of old military accommodation and newer sports hall. Changing and gymnasium facilities are well below standard. |
| 8 – D&T/Art | Main portion of department housed within Vic Hallam Derwent System modular timber framed single storey building which allows a significant level of flexibility in layout but which suffers from a lack of environmental control and age related decay. The structure was built in the late 1950’s with an expected life span of xx years. Wheelchair access by way of small platform lift adjacent to interface with Hall. Remainder of department housed in single storey flat roofed structure. |
| 9 – Library/6th form | ‘Lightweight’ interjection into former open quad. Completed in 2000? Very poor environmental conditions and acoustics due to inappropriate roof covering. |
| 10 – Music and Drama | Music and Drama facilities lacking in rehearsal and performance space. Location remote from Art negatively impacts on cooperation between the creative arts. |
|---|---|
| 11 - SEN | Slightly fragmented facility across two main building areas and two external ‘mobile classrooms’ caused issues with supervision and control. No dedicated external activity area. |
| A ‐1 East 1 | Single Story Wall Elevation partly above A‐7 | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| A | 1 | East | 1 | Item | Element | Material | % | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| A | 1 | East | 1 | Wall | Cover | Dash | C | 1 | Cracks in several areas including some >3mm | ||||
| A | 1 | East | 1 | Wall | Doorways | Rendered | C | 1 | Cracks in several areas including some >3mm. Poor finishes and no mastic seal around the frame | ||||
| A | 1 | East | 1 | Wall | Doors | Timber | A | 3 | |||||
| A | 1 | East | 1 | Wall | Screens | Timber | A | 3 | |||||
| A | 1 | East | 1 | Wall | RWP Downpipes | Aluminium | C | 3 | Oxidisation is evident below the powdered coated surface, and the surface is discoloured | ||||
| A | 1 | East | 1 | Wall | Penetrations | Services | A | 3 | |||||
| A | 1 | East | 1 | Wall | Fixings | Services | C | 2 | Corrosion evident to brackets and fixings | ||||
| A | 1 | East | 1 | Wall | Pathways | Macadam | A | 3 |
| A ‐1 North 1 | Single Story Wall Elevation (Painted) | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| A | 1 | North | 1 | Item | Element | Material | % | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| A | 1 | North | 1 | Wall | Cover | Rendered | A | 3 | |||||
| A | 1 | North | 1 | Wall | Window Apertures | Concrete | C | 2 | Local area of spalling on the precast concrete | ||||
| A | 1 | North | 1 | Wall | Window Apertures | Rendered | A | 3 | |||||
| A | 1 | North | 1 | Wall | Windows | Timber | A | 2 | |||||
| A | 1 | North | 1 | Wall | Sills | Concrete | A | 3 | |||||
| A | 1 | North | 1 | Wall | RWP Downpipes | Aluminium | C | 3 | Oxidisation is evident below the powdered coated surface, and the surface is discoloured | ||||
| A | 1 | North | 1 | Wall | Fixings | Proprietary | D | 1 | Sign fixings are failing sign is falling off the wall | Yes | |||
| A | 1 | North | 1 | Wall | Pathways | Macadam | B | 3 | Wear and tear | ||||
| A | 1 | North | 1 | Wall | Penetrations | Timber | C | 3 | Timber louver grille has corroding fixings | ||||
| A | 1 | North | 1 | Wall | Penetrations | Services | B | 3 | Wear and tear |
| A ‐1 Roof 1 | Flat Roof abutting A‐4 and joining A‐2, A‐5 Roof | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| A | 1 | Roof | 1 | Item | Element | Material | % | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| A | 1 | Roof | 1 | Roof | Cover | Mineral Felt | C | 3 | Repairs are visible | ||||
| A | 1 | Roof | 1 | Roof | Eaves/Fascia | Timber | B | 3 | Wear and tear | ||||
| A | 1 | Roof | 1 | Roof | Soffit | Soffit Brd | C | 2 | Corrosion evident to the fixings | ||||
| A | 1 | Roof | 1 | Roof | Soffit | Concrete | B | 2 | Corrosion and spalling concrete locally | ||||
| A | 1 | Roof | 1 | Roof | RWP Guttering | Aluminium | C | 3 | Oxidisation is evident below the powdered coated surface, and the surface is discoloured | ||||
| A | 1 | Roof | 1 | Roof | Parapets | Mineral Felt | C | 3 | Wear and tear | ||||
| A | 1 | Roof | 1 | Roof | Flashing | Copper | D | 3 | Copper flashings are deteriorated and breaking up in places | ||||
| A | 1 | Roof | 1 | Roof | Fixings | Services | D | 3 | Service pipe cover and insulation is deformed and insulation values have been deteriorated |
| A ‐2 North 1 | Single Story Wall Elevation (Face Brick) | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| A | 2 | North | 1 | Item | Element | Material | % | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| A | 2 | North | 1 | Wall | Cover | Brick | A | 3 | |||||
| A | 2 | North | 1 | Wall | Window Apertures | Brick | C | 2 | Sections of mastic missing and incomplete | Yes | |||
| A | 2 | North | 1 | Wall | Windows | UPVC | B | 2 | Mastic is breaking down | ||||
| A | 2 | North | 1 | Wall | Sills | Concrete | C | 3 | Damage to one sill unit | ||||
| A | 2 | North | 1 | Wall | Fixings | Proprietary | C | 3 | Lights and school signage with heavy corrosion to some fittings and fixtures | Yes | |||
| A | 2 | North | 1 | Wall | Pathways | Macadam | B | 3 | General wear and tear |
| A ‐2 North 2 | Single Story Wall Elevation (Timber Cladding) | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| A | 2 | North | 2 | Item | Element | Material | % | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| A | 2 | North | 2 | Wall | Cover | Timber | A | 3 | |||||
| A | 2 | North | 2 | Wall | Doorways | Timber | A | 3 | |||||
| A | 2 | North | 2 | Wall | Doors | Aluminium | A | 3 | |||||
| A | 2 | North | 2 | Wall | Screens | Aluminium | A | 3 | |||||
| A | 2 | North | 2 | Wall | RWP Downpipes | UPVC | A | 3 | |||||
| A | 2 | North | 2 | Wall | Pathways | Slabs | B | 3 | General wear and tear |
| A ‐2 Roof 1 | Flat Roof abutting K‐2 & K‐4, A‐3 & A‐4 | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| A | 2 | Roof | 1 | Item | Element | Material | % | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| A | 2 | Roof | 1 | Roof | Cover | GRP | B | 2 | Deterioration is evident and detritus is building up | ||||
| A | 2 | Roof | 1 | Roof | Eaves/Fascia | Timber | B | 2 | General wear and tear | ||||
| A | 2 | Roof | 1 | Roof | Soffit | Soffit Brd | C | 2 | Corrosion evident to the fixings | ||||
| A | 2 | Roof | 1 | Roof | RWP Guttering | Aluminium | C | 3 | Oxidisation is evident below the powdered coated surface, and the surface is discoloured | ||||
| A | 2 | Roof | 1 | Roof | Fixings | Services | D | 3 | Service pipe cover and insulation is deformed and insulation values have been deteriorated | ||||
| A | 2 | Roof | 1 | Roof | Flashing | Copper | D | 3 | Copper flashings are deteriorated and breaking up in places |
| A ‐3 South 1 | Rooftop Wall Elevation above A‐5, B‐3 and below A‐4 South 1 | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| A | 3 | South | 1 | Item | Element | Material | % | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| A | 3 | South | 1 | Wall | Cover | Rendered | B | 2 | General wear and tear | ||||
| A | 3 | South | 1 | Wall | Window Apertures | Concrete | B | 3 | General wear and tear | ||||
| A | 3 | South | 1 | Wall | Windows | UPVC | A | 3 | |||||
| A | 3 | South | 1 | Wall | Sills | Concrete | A | 3 | |||||
| A | 3 | South | 1 | Wall | RWP Downpipes | Aluminium | C | 3 | Oxidisation is evident below the powdered coated surface, and the surface is discoloured | ||||
| A | 3 | South | 1 | Wall | Fixings | Services | B | 3 | General wear and tear |
| A ‐3 North 1 | Rooftop Wall Elevation above A‐2 | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| A | 3 | North | 1 | Item | Element | Material | % | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| A | 3 | North | 1 | Wall | Cover | Rendered | B | 3 | Painted over, some patching prior to painting has been undertaken | ||||
| A | 3 | North | 1 | Wall | Window Apertures | Concrete | D | 1 | Corroding reinforcement and spalling concrete on the lintels | Yes | |||
| A | 3 | North | 1 | Wall | Windows | UPVC | A | 3 | |||||
| A | 3 | North | 1 | Wall | Sills | Concrete | A | 3 | |||||
| A | 3 | North | 1 | Wall | Penetrations | Plastic | B | 3 | Vents | ||||
| A | 3 | North | 1 | Wall | Penetrations | Metal | B | 3 | Grilles |
| A ‐3 West 1 | Rooftop Wall Elevation above A‐2 & K‐4 | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| A | 3 | West | 1 | Item | Element | Material | % | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| A | 3 | West | 1 | Wall | Cover | Rendered | B | 3 | A few fixing holes exposed | ||||
| A | 3 | West | 1 | Wall | Window Apertures | Concrete | A | 3 | |||||
| A | 3 | West | 1 | Wall | Windows | UPVC | A | 2 | |||||
| A | 3 | West | 1 | Wall | Sills | Concrete | A | 3 | |||||
| A | 3 | West | 1 | Wall | Fixings | Services | C | 2 | Corrosion to fixings |
| A ‐3 Roof 1 | Flat Roof abutting A‐4 | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| A | 3 | Roof | 1 | Item | Element | Material | % | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| A | 3 | Roof | 1 | Roof | Cover | Mineral Felt | B | 2 | Lichen present and general wear and tear | ||||
| A | 3 | Roof | 1 | Roof | RWP Guttering | Mineral Felt | B | 2 | Lichen present and general wear and tear | ||||
| A | 3 | Roof | 1 | Roof | Eaves/Fascia | Concrete | A | 2 | |||||
| A | 3 | Roof | 1 | Roof | Soffit | Concrete | D | 1 | Corroding reinforcement and spalling concrete | ||||
| A | 3 | Roof | 1 | Roof | Side Abutment | Copper | C | 2 | Copper flashings are aged and have lifted | ||||
| A | 3 | Roof | 1 | Roof | Penetrations | Services | B | 3 | Wear and tear |
| A ‐4 South 1 | Rooftop Wall Elevation High level above A‐3 South 1 Wall | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| A | 4 | South | 1 | Item | Element | Material | % | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| A | 4 | South | 1 | Wall | Cover | Rendered | 70% | B | 3 | Painted over, some patching prior to painting has been undertaken | |||
| A | 4 | South | 1 | Wall | Cover | Brick | 30% | C | 2 | Mortar pointing is deteriorating in places and voids provide ingress for weathering and water. | |||
| A | 4 | South | 1 | Wall | Sills | Concrete | A | 3 | |||||
| A | 4 | South | 1 | Wall | Parapets | Brick | C | 2 | Mortar pointing is deteriorating in places and voids provide ingress for weathering and water. | ||||
| A | 4 | South | 1 | Wall | Fixings | Proprietary | B | 2 | Solar Heating panel |
| A ‐4 East 1 | Rooftop Wall Elevation above A‐1 | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| A | 4 | East | 1 | Item | Element | Material | % | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| A | 4 | East | 1 | Wall | Cover | Rendered | 80% | B | 3 | Painted over, some patching prior to painting has been undertaken | |||
| A | 4 | East | 1 | Wall | Cover | Brick | 20% | C | 2 | Mortar pointing is deteriorating in places and voids provide ingress for weathering and water. | |||
| A | 4 | East | 1 | Wall | Window Apertures | Concrete | D | 2 | Corroding reinforcement and spalling concrete on the lintels | ||||
| A | 4 | East | 1 | Wall | Window Apertures | Concrete | B | 2 | Mastic around the frames is shrinking and cracking | Yes | |||
| A | 4 | East | 1 | Wall | Windows | UPVC | A | 3 | |||||
| A | 4 | East | 1 | Wall | Sills | Concrete | A | 3 | |||||
| A | 4 | East | 1 | Wall | Parapets | Brick | C | 2 | Mortar pointing is deteriorating in places and voids provide ingress for weathering and water. | ||||
| A | 4 | East | 1 | Wall | Penetrations | Services | A | 2 | |||||
| A | 4 | East | 1 | Wall | Capping | Concrete | C | 2 | Mortar pointing is deteriorating in places and voids provide ingress for weathering and water. | ||||
| A | 4 | East | 1 | Wall | SVP | Plastic | A | 2 |
| A ‐4 North 1 | Rooftop Wall Elevation above A‐2 | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| A | 4 | North | 1 | Item | Element | Material | % | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| A | 4 | North | 1 | Wall | Cover | Rendered | 80% | B | 3 | Painted over, some patching prior to painting has been undertaken | |||
| A | 4 | North | 1 | Wall | Cover | Brick | 15% | C | 2 | Mortar pointing is deteriorating in places and voids provide ingress for weathering and water. | |||
| A | 4 | North | 1 | Wall | Cover | Timber | 5% | B | 3 | Lead dressed over sill, Mastic around the frames is shrinking and cracking | |||
| A | 4 | North | 1 | Wall | Window Apertures | Concrete | B | 3 | Lead dressed over sill, Mastic around the frames is shrinking and cracking | ||||
| A | 4 | North | 1 | Wall | Windows | UPVC | A | 3 | |||||
| A | 4 | North | 1 | Wall | Sills | Concrete | B | 2 | Lead has been dressed over the sills, mastic to the ends is starting to crack and shrink back leaving openings | ||||
| A | 4 | North | 1 | Wall | Parapets | Brick | C | 2 | Mortar pointing is deteriorating in places and voids provide ingress for weathering and water. | ||||
| A | 4 | North | 1 | Wall | Penetrations | Services | B | 3 | Openings are not sealed and access is difficult adjacent to the services | ||||
| A | 4 | North | 1 | Wall | Capping | Concrete | C | 2 | Mortar pointing is deteriorating in places and voids provide ingress for weathering and water. | ||||
| A | 4 | North | 1 | Wall | Fixings | Proprietary | B | 2 | Clock face and electrical boxes |
| A ‐4 West 1 | Rooftop Wall Elevation above A‐3 | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| A | 4 | West | 1 | Item | Element | Material | % | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| A | 4 | West | 1 | Wall | Cover | Rendered | 75% | A | 3 | ||||
| A | 4 | West | 1 | Wall | Cover | Brick | 25% | C | 2 | Mortar pointing is deteriorating in places and voids provide ingress for weathering and water. | |||
| A | 4 | West | 1 | Wall | Doorways | Rendered | A | 3 | |||||
| A | 4 | West | 1 | Wall | Doors | Timber | D | 2 | Plywood door is aged | ||||
| A | 4 | West | 1 | Wall | Fixings | Services | A | 2 |
| A ‐4 Roof 1 | Roof | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| A | 4 | Roof | 1 | Item | Element | Material | % | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| A | 4 | Roof | 1 | Roof | Cover | GRP | B | 3 | Detritus build‐up | ||||
| A | 4 | Roof | 1 | Roof | Flashing | Copper | C | 2 | Copper flashings are aged and are lifting | ||||
| A | 4 | Roof | 1 | Roof | Parapets | Concrete | B | 3 | Corners have broke of parapet copings on places | ||||
| A | 4 | Roof | 1 | Roof | Chimney | Brick | D | 1 | There is a large crack >10mm to the brickwork on the roof side of the stack | ||||
| A | 4 | Roof | 1 | Roof | RWP Guttering | GRP | C | 2 | There is detritus building up on the rood and in the GRP channel guttering | ||||
| A | 4 | Roof | 1 | Roof | Roof Terminals | Metal | D | 1 | Weather cowl is missing from one flue | Yes |
| A ‐5 South 1 | Single Story Wall Elevation in Courtyard | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| A | 5 | South | 1 | Item | Element | Material | % | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| A | 5 | South | 1 | Wall | Cover | Brick | 50% | A | 3 | ||||
| A | 5 | South | 1 | Wall | Cover | Dash | 50% | C | 2 | cracks are present in numerous areas including continuous vertical cracking adjacent to the external corner section | |||
| A | 5 | South | 1 | Wall | Window Apertures | Concrete | B | 3 | Reveals are contaminates with old adhesive for plating to previous window installation | ||||
| A | 5 | South | 1 | Wall | Windows | UPVC | A | 3 | |||||
| A | 5 | South | 1 | Wall | Sills | Concrete | A | 3 | |||||
| A | 5 | South | 1 | Wall | RWP Downpipes | Aluminium | C | 3 | Oxidisation is evident below the powdered coated surface, and the surface is discoloured. | ||||
| A | 5 | South | 1 | Wall | Fixings | Services | D | 2 | Horizontal steel conduit along the wall below the eaves is corroding badly |
| A ‐5 Roof 1 | Flat Roof abutting A‐3, A‐4, A‐6, B‐3 and joining A‐1, H‐1 | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| A | 5 | Roof | 1 | Item | Element | Material | % | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| A | 5 | Roof | 1 | Roof | Cover | Mineral Felt | B | 2 | 50% covering has been relayed | ||||
| A | 5 | Roof | 1 | Roof | Eaves/Fascia | Timber | B | 2 | Paint is beginning to age and start delaminate in small areas | ||||
| A | 5 | Roof | 1 | Roof | Soffit | Soffit Brd | C | 2 | Soffit is aged and discoloured, with some corrosion to fixings | ||||
| A | 5 | Roof | 1 | Roof | Flashing | Lead | B | 2 | There are no flashings installed to the low levels windows on the South elevation rooftop | ||||
| A | 5 | Roof | 1 | Roof | Parapets | Mineral Felt | B | 2 | Wear & tear | ||||
| A | 5 | Roof | 1 | Roof | RWP Guttering | Aluminium | C | 3 | Oxidisation is evident below the powdered coated surface, and the surface is discoloured. |
| A ‐6 South 1 | Rooftop Wall Elevation above H‐1 | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| A | 6 | South | 1 | Item | Element | Material | % | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| A | 6 | South | 1 | Wall | Cover | Dash | C | 3 | General discolouration to the dash finish | ||||
| A | 6 | South | 1 | Wall | Window Apertures | Rendered | C | 3 | Reveals have not been made good and sealed around the replacement window sills | ||||
| A | 6 | South | 1 | Wall | Windows | UPVC | A | 3 | |||||
| A | 6 | South | 1 | Wall | Sills | Concrete | A | 3 |
| A ‐6 East 1 | Two Story Wall Elevation partly above H‐1 | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| A | 6 | East | 1 | Item | Element | Material | % | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| A | 6 | East | 1 | Wall | Cover | Dash | C | 3 | Some cracking is evident to the dash in places. The dash layer is showing signs at some openings of delamination starting to occur | ||||
| A | 6 | East | 1 | Wall | Windows | UPVC | A | 3 | |||||
| A | 6 | East | 1 | Wall | Window Apertures | Rendered | C | 3 | Mastic is splitting and de‐bonding in small sections around frames | ||||
| A | 6 | East | 1 | Wall | Sills | Concrete | A | 3 | |||||
| A | 6 | East | 1 | Wall | Fixings | Proprietary | C | 3 | Grille installed has not been sealed around the perimeter | Yes | |||
| A | 6 | East | 1 | Wall | Pathways | Concrete | B | 3 | Wear and tear |
| A ‐6 North 1 | Two Story Wall Elevation | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| A | 6 | North | 1 | Item | Element | Material | % | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| A | 6 | North | 1 | Wall | Cover | Dash | 80% | B | 3 | Minor damage to dash locally. General discolouration to the dash finish | |||
| A | 6 | North | 1 | Wall | Cover | Brick | 20% | A | 3 | ||||
| A | 6 | North | 1 | Wall | Window Apertures | Rendered | D | 2 | Heavy corrosion to the metal lintels above the window | ||||
| A | 6 | North | 1 | Wall | Windows | UPVC | A | 3 | |||||
| A | 6 | North | 1 | Wall | Sills | Concrete | A | 3 | |||||
| A | 6 | North | 1 | Wall | RWP Downpipes | Aluminium | C | 3 | Oxidisation is evident below the powdered coated surface, and the surface is discoloured | ||||
| A | 6 | North | 1 | Wall | Fixings | Proprietary | B | 3 | School bell, light, signage | ||||
| A | 6 | North | 1 | Wall | Pathways | Macadam | B | 3 | Wear and tear |
| A ‐6 West 1 | Two Story Wall Elevation above A‐7 & A‐1 | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| A | 6 | West | 1 | Item | Element | Material | % | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| A | 6 | West | 1 | Wall | Cover | Dash | B | 3 | General discolouration to the dash finish | ||||
| A | 6 | West | 1 | Wall | Window Apertures | Rendered | A | 3 | |||||
| A | 6 | West | 1 | Wall | Windows | UPVC | A | 3 | |||||
| A | 6 | West | 1 | Wall | Sills | Concrete | A | 3 | |||||
| A | 6 | West | 1 | Wall | RWP Downpipes | Aluminium | A | 3 | |||||
| A | 6 | West | 1 | Wall | Fixings | Proprietary | B | 3 | Light fitting |
| A ‐6 Roof 1 | Roof Pitched | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| A | 6 | Roof | 1 | Item | Element | Material | % | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| A | 6 | Roof | 1 | Roof | Cover | Concrete | B | 3 | Wear and tear | ||||
| A | 6 | Roof | 1 | Roof | Ridge | Concrete | B | 3 | Wear and tear | ||||
| A | 6 | Roof | 1 | Roof | Hip | Concrete | B | 3 | Wear and tear | ||||
| A | 6 | Roof | 1 | Roof | Eaves/Fascia | Timber | C | 3 | Some local delamination of paint from the fascia board | ||||
| A | 6 | Roof | 1 | Roof | Soffit | Soffit Brd | D | 1 | Metal vent covers are corroded and deteriorating badly | ||||
| A | 6 | Roof | 1 | Roof | RWP Guttering | Aluminium | C | 3 | Oxidisation is evident below the powdered coated surface, and the surface is discoloured |
| A ‐7 North 1 | Single Story Wall Elevation (Small) | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| A | 7 | North | 1 | Item | Element | Material | % | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| A | 7 | North | 1 | Wall | Doors | Timber | B | 2 | Wear and tear | ||||
| A | 7 | North | 1 | Wall | Windows | Timber | B | 2 | Wear and tear | ||||
| A | 7 | North | 1 | Wall | Fixings | Proprietary | C | 2 | Redundant box dangling from installation cable | Yes | |||
| A | 7 | North | 1 | Wall | Pathways | Concrete | B | 3 | Wear and tear |
| A ‐7 Roof 1 | Roof Flat abutting A‐6 & A‐1 | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| A | 7 | Roof | 1 | Item | Element | Material | % | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| A | 7 | Roof | 1 | Roof | Cover | Mineral Felt | B | 2 | Wear and tear | ||||
| A | 7 | Roof | 1 | Roof | Eaves/Fascia | Timber | B | 2 | Wear and tear | ||||
| A | 7 | Roof | 1 | Roof | RWP Guttering | Aluminium | C | 3 | Oxidisation is evident below the powdered coated surface, and the surface is discoloured | ||||
| A | 7 | Roof | 1 | Roof | Flashing | Lead | C | 2 | Lead flashing is not installed to the short south section and not likely to be chased in on the west side because access around services and eaves |
| B‐1 South 1 | Two Story Wall Elevation (Left Side as viewed including Balcony) | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| B | 1 | South | 1 | Item | Element | Material | % | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| B | 1 | South | 1 | Wall | Cover | Brick | 30% | C | 3 | Continuous vertical crack to the corner adjacent to B‐2 | |||
| B | 1 | South | 1 | Wall | Cover | Dash | 30% | C | 3 | Cracking and spalling to the panels between windows, some remedial have been undertaken to 1FL | |||
| B | 1 | South | 1 | Wall | Cover | Rendered | 30% | C | 3 | Cracking to rendering in numerous areas, and damage to areas including along the bell cast molding. There is some spalling to the render band below DPC | |||
| B | 1 | South | 1 | Wall | Cover | Concrete | 10% | C | 3 | Cracking and spalling to vertical and horizontal structural members, corrosion is visible to the underside of the horizontal members in several places | |||
| B | 1 | South | 1 | Wall | Window Apertures | Concrete | C | 3 | Cracking and spalling to vertical and horizontal structural members, corrosion is visible to the underside of the horizontal members in several places | ||||
| B | 1 | South | 1 | Wall | Windows | UPVC | B | 2 | Wear and Tear | ||||
| B | 1 | South | 1 | Wall | Sills | Concrete | C | 3 | Cracking and spalling to vertical and horizontal structural members, corrosion is visible to the underside of the horizontal members in several places | ||||
| B | 1 | South | 1 | Wall | Doorways | Brick | C | 3 | Wear and Tear | ||||
| B | 1 | South | 1 | Wall | Doors | Metal | C | 2 | Door closer is not suitably connected | Yes | |||
| B | 1 | South | 1 | Wall | RWP Downpipes | Aluminium | C | 3 | Oxidisation is evident below the powdered coated surface, and the surface is discoloured. | ||||
| B | 1 | South | 1 | Wall | SVP | Plastic | C | 3 | There are support brackets missing. Bird cage is not installed to the top of the pipe | ||||
| B | 1 | South | 1 | Wall | SVP | Aluminium | C | 3 | There are support brackets missing | ||||
| B | 1 | South | 1 | Wall | Penetrations | Plastic | C | 2 | Redundant plastic pipes have been cut off and foam filled, leaving open to the weather and water ingress | ||||
| B | 1 | South | 1 | Wall | Pathways | Macadam | B | 3 | Wear and Tear | ||||
| B | 1 | South | 1 | Balcony | Fixings | Services | C | 2 | Lightning conductor straps are severely corroding/oxidising | ||||
| B | 1 | South | 1 | Balcony | Cover | Mineral Felt | C | 2 | Wear and Tear | ||||
| B | 1 | South | 1 | Balcony | Eaves/Fascia | UPVC | B | 1 | Wear and Tear | ||||
| B | 1 | South | 1 | Balcony | Soffit | Soffit Brd | C | 1 | Soffit has delaminated paint and corrosion at the fixings | ||||
| B | 1 | South | 1 | Balcony | Top Abutment | Lead | C | 2 | Cover flashing is missing from the side/soffit, open mortar joints are exposed to the weather and rain | ||||
| B | 1 | South | 1 | Balcony | Railing | Metal | D | 1 | Railing to the balcony is severely corroded along with its fixing points | ||||
| B | 1 | South | 1 | Balcony | Posts | Metal | C | 1 | Structural posts have corrosion beading through the paint finishes |
| B‐1 South 2 | Two Story Wall Elevation (Right Side as viewed) | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| B | 1 | South | 2 | Item | Element | Material | % | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| B | 1 | South | 2 | Wall | Cover | Dash | 90% | C | 3 | There are holes in the covering from redundant fixing locations | |||
| B | 1 | South | 2 | Wall | Cover | Concrete | 10% | C | 3 | Cracking and spalling to vertical and horizontal structural members, corrosion is visible to the underside of the horizontal members in several places | |||
| B | 1 | South | 2 | Wall | Window Apertures | Concrete | C | 3 | Cracking and spalling to vertical and horizontal structural members, corrosion is visible to the underside of the horizontal members in several places | ||||
| B | 1 | South | 2 | Wall | Windows | UPVC | B | 2 | Wear and Tear | ||||
| B | 1 | South | 2 | Wall | Sills | Concrete | C | 3 | Cracking and spalling to vertical and horizontal structural members, corrosion is visible to the underside of the horizontal members in several places | ||||
| B | 1 | South | 2 | Wall | RWP Downpipes | Aluminium | C | 3 | Oxidisation is evident below the powdered coated surface, and the surface is discoloured and fixings are corroding | ||||
| B | 1 | South | 2 | Wall | Pathways | Macadam | B | 3 | Wear and Tear | ||||
| B | 1 | South | 2 | Wall | Ramps | Concrete | B | 3 | Wear and Tear |
| B‐1 East 1 | Two Story Wall Elevation in 2 courtyards and partly above E‐3, E‐6 & A‐5 | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| B | 1 | East | 1 | Item | Element | Material | % | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| B | 1 | East | 1 | Wall | Cover | Dash | 90% | B | 3 | Cracking underneath the ground floor sill in small courtyard | |||
| B | 1 | East | 1 | Wall | Window Apertures | Concrete | 10% | C | 1 | Cracking and spalling to vertical and horizontal structural members, corrosion is visible to the underside of the horizontal members in several places, some remedial works have been undertaken. There is old discoloration/mastic remnants for plates fitted around the window locations | |||
| B | 1 | East | 1 | Wall | Windows | UPVC | C | 2 | Corrosion staining is visible from the weep holes in the UPVC units suggests corrosion of the subframe and of fixings | ||||
| B | 1 | East | 1 | Wall | Windows | Timber | D | 2 | Timber frames are starting to deteriorate | ||||
| B | 1 | East | 1 | Wall | Sills | Concrete | C | 2 | Cracking and spalling to vertical and horizontal structural members, corrosion is visible to the underside of the horizontal members in several places, some remedial works have been undertaken. There is old discoloration/mastic remnants for plates fitted around the window locations | ||||
| B | 1 | East | 1 | Wall | RWP Downpipes | Aluminium | C | 2 | Oxidisation is evident below the powdered coated surface, and the surface is discoloured. | ||||
| B | 1 | East | 1 | Wall | RWP Downpipes | Plastic | C | 2 | Wear and Tear | ||||
| B | 1 | East | 1 | Wall | SVP | Plastic | C | 2 | Wear and Tear | ||||
| B | 1 | East | 1 | Wall | Fixings | Services | C | 3 | Gas pipe. Power cables in small courtyard adjacent to A‐5 South 1 | ||||
| B | 1 | East | 1 | Wall | Fixings | Services | C | 3 | TV aerial post is corroded |
| B‐1 North 1 | Rooftop Wall Elevation above J‐4 | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| B | 1 | North | 1 | Item | Element | Material | % | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| B | 1 | North | 1 | Wall | Cover | Concrete | 90% | D | 1 | Corroding sections of reinforcement has resulted in large section of spalling concrete to one column | |||
| B | 1 | North | 1 | Wall | Cover | Rendered | 10% | D | 1 | There is a continuous vertical crack off the corner adjacent to B‐2 (recessed wall section) | |||
| B | 1 | North | 1 | Wall | Window Apertures | Concrete | A | 3 | |||||
| B | 1 | North | 1 | Wall | Windows | Timber | D | 1 | Timber (high level) windows have lost paint coating and are rotting | ||||
| B | 1 | North | 1 | Wall | Windows | UPVC | A | 2 | |||||
| B | 1 | North | 1 | Wall | Sills | Concrete | A | 3 | |||||
| B | 1 | North | 1 | Wall | Sills | UPVC | A | 3 | |||||
| B | 1 | North | 1 | Wall | RWP Downpipes | Aluminium | C | 3 | Oxidisation is evident below the powdered coated surface, and the surface is discoloured | ||||
| B | 1 | North | 1 | Wall | Penetrations | Services | A | 3 | |||||
| B | 1 | North | 1 | Wall | Fixings | Services | C | 2 | Brackets/Fixings supporting services are heavily corroded | ||||
| B | 1 | North | 1 | Wall | SVP | Aluminium | B | 3 | Wear and tear |
| B‐1 West 1 | Rooftop Wall Elevation above B‐2 | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| B | 1 | West | 1 | Item | Element | Material | % | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| B | 1 | West | 1 | Wall | Cover | GRP | A | 3 |
| B‐1 Roof 1 | Pitched Roof Running East/West | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| B | 1 | Roof | 1 | Item | Element | Material | % | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| B | 1 | Roof | 1 | Roof | Cover | Concrete | E | 1 | The roof has exceeded its life cycle, there are numerous broken concrete tiles that leave holes through the roof covering. Tiles have started to slip in several places including hips and Vallie's | ||||
| B | 1 | Roof | 1 | Roof | Ridge | Concrete | E | 1 | Mortar bedded ridge tiles have started to become loose in several places, the dental tile and mortar bed has debonded and fallen out in several places | ||||
| B | 1 | Roof | 1 | Roof | Hip | Concrete | D | 1 | Hip tile displaced above roof B‐3/B‐4. hip irons are corroding badly | Yes | |||
| B | 1 | Roof | 1 | Roof | Valley | Concrete | D | 2 | Concrete valley tile, detritus and vegetation is present preventing closer visual inspection, tiles and mortar are displaced adjacent to the valley | ||||
| B | 1 | Roof | 1 | Roof | Eaves/Fascia | Timber | B | 2 | Wear and tear | ||||
| B | 1 | Roof | 1 | Roof | Soffit | Soffit Brd | C | 3 | Corrosion is evident at fixing points. Paint is delaminating from the board all along the north elevation | ||||
| B | 1 | Roof | 1 | Roof | RWP Guttering | Aluminium | C | 2 | Oxidisation is evident below the powdered coated surface, and the surface is discoloured. | ||||
| B | 1 | Roof | 1 | Roof | RWP Guttering | Aluminium | C | 3 | Vegetation is growing from the guttering | Yes | |||
| B | 1 | Roof | 1 | Roof | Roof Terminals | Proprietary | C | 2 | Sealant has been utilised to close the gap around the flashing to services, flaunching to cut tiles has broken away in many areas Weather cowls have been displaced for the top of pipes and are lying on the north pitch of the roof adjacent to L‐1 Roof |
| B‐1 Roof 2 | Pitched Roof Running North/South | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| B | 1 | Roof | 2 | Item | Element | Material | % | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| B | 1 | Roof | 2 | Roof | Cover | Concrete | E | 1 | Close examination was restricted by access, the roof appears to be in similar condition to the connecting B‐1 Roof 1. One bird nest is present. Tiles are aged and likely to be porous | ||||
| B | 1 | Roof | 2 | Roof | Ridge | E | 1 | Close examination was restricted by access, the ridge appears to be in similar condition to the connecting B‐1 Roof 1 | |||||
| B | 1 | Roof | 2 | Roof | Hip | D | 1 | Hip Irons are corroding heavily | |||||
| B | 1 | Roof | 2 | Roof | Valley | Concrete | D | 2 | Concrete valley tile, detritus is present preventing closer visual inspection, tiles and mortar are displaced adjacent to the valley | ||||
| B | 1 | Roof | 2 | Roof | Valley | Lead | B | 2 | Vegetation is growing in the valley | ||||
| B | 1 | Roof | 2 | Roof | Eaves/Fascia | Timber | C | 2 | Paint is delaminating from the boards locally | ||||
| B | 1 | Roof | 2 | Roof | Soffit | Soffit Brd | C | 3 | Corrosion is evident at fixing points. Paint is delaminating from the board all along the north elevation | ||||
| B | 1 | Roof | 2 | Roof | RWP Guttering | C | 2 | Oxidisation is evident below the powdered coated surface, and the surface is discoloured. Vegetation is growing in the guttering | |||||
| B | 1 | Roof | 2 | Roof | Roof Terminals | C | 2 | Close inspection was not possible assumed to be similar to connected roof B‐1 Roof 1 | |||||
| B | 1 | Roof | 2 | Roof | Sprocket | Cement | C | 2 | Cement Parging above the lead flashing for the glazed screen (B‐4) is breaking down |
| B‐2 South 1 | Two Story Wall Elevation | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| B | 2 | South | 1 | Item | Element | Material | % | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| B | 2 | South | 1 | Wall | Cover | Dash | A | 3 | |||||
| B | 2 | South | 1 | Wall | Penetrations | Services | B | 3 | Air extraction grilles | ||||
| B | 2 | South | 1 | Wall | Fixings | Services | B | 3 | Surface mounted drainage has corroding fixings | ||||
| B | 2 | South | 1 | Wall | Fixings | Metal | C | 3 | There are numerous redundant fixing points and fitting that are corroding |
| B‐2 North 1 | Rooftop Wall Elevation above J‐4 | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| B | 2 | North | 1 | Item | Element | Material | % | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| B | 2 | North | 1 | Wall | Cover | Dash | B | 3 |
| B‐2 Roof 1 | Flat Roof abutting M‐1, B‐1 | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| B | 2 | Roof | 1 | Item | Element | Material | % | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| B | 2 | Roof | 1 | Roof | Cover | GRP | A | 3 | |||||
| B | 2 | Roof | 1 | Roof | Eaves/Fascia | UPVC | A | 3 | |||||
| B | 2 | Roof | 1 | Roof | RWP Hopper | GRP | B | 3 | The GRP outlet from M‐1 roof has been formed untidily, however appears to be functional | ||||
| B | 2 | Roof | 1 | Roof | Flashing | GRP | A | 3 | No cover flashing has been installed under the very adjacent B‐1 eaves |
| B‐3 East 1 | Rooftop Wall Elevation (Small) above A‐5 | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| B | 3 | East | 1 | Item | Element | Material | % | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| B | 3 | East | 1 | Wall | Cover | Dash | B | 3 | Repairs have been undertaken to the side of window frame and above A‐5 flashings | ||||
| B | 3 | East | 1 | Wall | Window Apertures | Rendered | B | 2 | repairs have been undertaken | ||||
| B | 3 | East | 1 | Wall | Windows | Timber | D | 2 | Timber frames are starting to deteriorate | ||||
| B | 3 | East | 1 | Wall | Sills | Copper | B | 2 | Old cover flashings appear to be functional |
| B‐3 Roof 1 | Flat Roof abutting A‐3 & B‐1 | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| B | 3 | Roof | 1 | Item | Element | Material | % | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| B | 3 | Roof | 1 | Roof | Cover | Mineral Felt | A | 2 | |||||
| B | 3 | Roof | 1 | Roof | Eaves/Fascia | Concrete | A | 3 | |||||
| B | 3 | Roof | 1 | Roof | Soffit | Concrete | A | 3 | |||||
| B | 3 | Roof | 1 | Roof | Side Abutment | Lead | B | 3 | Side laps are very short against A‐3 abutment(20mm), lead is starting to lift locally. It is likely there is no lead installed and minimal cover flashing to the elevation abutting B‐1 eaves. One bird nest is present |
| B‐4 South 1 | Rooftop Glazed Screen/Canopy above L‐2 | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| B | 4 | South | 1 | Item | Element | Material | % | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| B | 4 | South | 1 | Wall | Cover | Metal | A | 3 | |||||
| B | 4 | South | 1 | Wall | Windows | Metal | B | 3 | Panels to the sloped roof are heavily soiled | ||||
| B | 4 | South | 1 | Wall | RWP Downpipes | Plastic | B | 3 | Wear and tear | ||||
| B | 4 | South | 1 | Roof | Hip | Metal | B | 3 | Lichen growing locally | ||||
| B | 4 | South | 1 | Roof | Eaves/Fascia | Metal | B | 3 | Lichen growing locally | ||||
| B | 4 | South | 1 | Roof | RWP Guttering | Plastic | C | 1 | Detritus and vegetation in the guttering | Yes | |||
| B | 4 | South | 1 | Roof | Top Abutment | Lead | C | 1 | Lead cover flashing deformed locally | Yes |
| B‐4 West 1 | Rooftop Glazed Screen/Canopy above K‐4 & K‐5 | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| B | 4 | North | 1 | Item | Element | Material | % | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| B | 4 | North | 1 | Wall | Cover | Metal | A | 3 | |||||
| B | 4 | North | 1 | Wall | Windows | Metal | B | 3 | Panels to the sloped roof are heavily soiled | ||||
| B | 4 | North | 1 | Wall | RWP Downpipes | Plastic | B | 3 | Wear and tear | ||||
| B | 4 | North | 1 | Roof | Valley | Metal | B | 3 | Lichen growing locally | ||||
| B | 4 | North | 1 | Roof | Eaves/Fascia | Metal | B | 3 | Lichen growing locally | ||||
| B | 4 | North | 1 | Roof | RWP Guttering | Plastic | C | 1 | Detritus and vegetation in the guttering | Yes | |||
| B | 4 | North | 1 | Roof | Top Abutment | Lead | C | 1 | Lead cover flashing deformed locally | Yes |
| B‐4 North 1 | Rooftop Glazed Screen/Canopy (Link) abutting L‐1 | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| B | 4 | West | 1 | Item | Element | Material | % | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| B | 4 | West | 1 | Wall | Cover | Metal | A | 3 | |||||
| B | 4 | West | 1 | Wall | Windows | Metal | B | 3 | Panels to the sloped roof are heavily soiled | ||||
| B | 4 | West | 1 | Wall | RWP Downpipes | Plastic | B | 3 | Wear and tear | ||||
| B | 4 | West | 1 | Roof | Valley | Metal | B | 3 | Lichen growing locally | ||||
| B | 4 | West | 1 | Roof | Eaves/Fascia | Metal | B | 3 | Lichen growing locally | ||||
| B | 4 | West | 1 | Roof | RWP Guttering | Plastic | C | 1 | Detritus and vegetation in the guttering | Yes | |||
| B | 4 | West | 1 | Roof | Top Abutment | Lead | C | 1 | Lead cover flashing deformed locally | Yes |
| C‐1 South 1 | Single Story Wall Elevation Gable | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| C | 1 | South | 1 | Item | Element | Material | % | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| C | 1 | South | 1 | Wall | Cover | Dash | C | 3 | Dash has broken off local to the handrail fixings | ||||
| C | 1 | South | 1 | Wall | Doorways | Rendered | C | 3 | Gaps around the doorframe have been filled with foam filler, not trimmed nor sealed | ||||
| C | 1 | South | 1 | Wall | Doors | Timber | C | 3 | Paint is peeling of the frame and door, deterioration and rot is evident. Door furniture is corroding | ||||
| C | 1 | South | 1 | Wall | Fixings | Proprietary | B | 3 | School bell | ||||
| C | 1 | South | 1 | Wall | Fixings | Metal | B | 3 | Cable shroud | ||||
| C | 1 | South | 1 | Wall | Pathways | Concrete | B | 3 | Wear and tear | ||||
| C | 1 | South | 1 | Wall | Railing | Metal | C | 3 | Light local corrosion on the railings, fixings are corroding |
| C‐1 East 1 | Single Story Wall Elevation | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| C | 1 | East | 1 | Item | Element | Material | % | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| C | 1 | East | 1 | Wall | Cover | Dash | C | 3 | Cracking and general deterioration | ||||
| C | 1 | East | 1 | Wall | Window Apertures | Rendered | A | 3 | |||||
| C | 1 | East | 1 | Wall | Windows | Timber | C | 3 | Paint is peeling from the window frame and frame is deteriorating. Retro fitted screws appear to be securing some openings | ||||
| C | 1 | East | 1 | Wall | Sills | Concrete | A | 3 | |||||
| C | 1 | East | 1 | Wall | RWP Downpipes | Plastic | A | 2 | |||||
| C | 1 | East | 1 | Wall | Pathways | Slabs | A | 3 |
| C‐1 North 1 | Rooftop Wall Elevation Gable above F‐2 Roof | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| C | 1 | North | 1 | Item | Element | Material | % | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| C | 1 | North | 1 | Wall | Cover | Dash | B | 3 | Wear and tear | ||||
| C | 1 | North | 1 | Wall | Fixings | Metal | C | 2 | TV Aerial | ||||
| C | 1 | North | 1 | Wall | Penetrations | Services | C | 3 | Wall has not been sealed around the cable penetration |
| C‐1 West 1 | Rooftop Wall Elevation above C‐4 Roof | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| C | 1 | West | 1 | Item | Element | Material | % | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| C | 1 | West | 1 | Wall | Cover | Dash | A | 3 | |||||
| C | 1 | West | 1 | Wall | RWP Downpipes | Plastic | A | 3 |
| C‐1 Roof 1 | Pitched Roof | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| C | 1 | Roof | 1 | Item | Element | Material | % | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| C | 1 | Roof | 1 | Roof | Cover | Concrete | B | 3 | Local repair undertaken | ||||
| C | 1 | Roof | 1 | Roof | Ridge | Concrete | B | 3 | Wear and tear | ||||
| C | 1 | Roof | 1 | Roof | Eaves/Fascia | Timber | C | 3 | Paint is delaminating from the fascia | ||||
| C | 1 | Roof | 1 | Roof | Soffit | B | 3 | Wear and tear | |||||
| C | 1 | Roof | 1 | Roof | Verge | Cement | C | 3 | Parging is cracking and starting to deteriorate on the south side | ||||
| C | 1 | Roof | 1 | Roof | RWP Guttering | Plastic | B | 3 | Wear and tear |
| C‐2 South 1 | Rooftop Wall Elevation Gable above F‐2 | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| C | 2 | South | 1 | Item | Element | Material | % | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| C | 2 | South | 1 | Wall | Cover | Dash | B | 3 | Wear and tear | ||||
| C | 2 | South | 1 | Wall | Fixings | Metal | D | 2 | TV aerial, and redundant brackets are corroding badly | ||||
| C | 2 | South | 1 | Wall | Penetrations | Services | C | 3 | Wall has not been sealed around the cable penetration, redundant holes have not been sealed |
| C‐2 South 3 | Two Story Wall Elevation Half Gable | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| C | 2 | South | 3 | Item | Element | Material | % | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| C | 2 | South | 3 | Wall | Cover | Dash | A | 2 | |||||
| C | 2 | South | 3 | Wall | Windows | Timber | B | 2 | Early deterioration of timber is visible | ||||
| C | 2 | South | 3 | Wall | Sills | Concrete | A | 2 | |||||
| C | 2 | South | 3 | Wall | Doorways | Rendered | C | 1 | Heavy corrosion to the lintels above the large garage 2 openings | Yes | |||
| C | 2 | South | 3 | Wall | Doors | Timber | C | 3 | Paint is delaminating generally, and fixings are corroding on the garage doors | Yes | |||
| C | 2 | South | 3 | Wall | Pathways | Concrete | B | 3 | Wear and tear |
| C‐2 South 2 | Rooftop Wall Elevation Gable above C‐2 Roof | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| C | 2 | South | 2 | Item | Element | Material | % | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| C | 2 | South | 2 | Wall | Cover | Dash | A | 3 |
| C‐2 East 1 | Single Story Wall Elevation | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| C | 2 | East | 1 | Item | Element | Material | % | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| C | 2 | East | 1 | Wall | Cover | Dash | 75% | C | 3 | Cracks to the remedial patches (following window installations) and to render band. | |||
| C | 2 | East | 1 | Wall | Cover | Brick | 25% | A | 3 | ||||
| C | 2 | East | 1 | Wall | Windows | UPVC | A | 3 | |||||
| C | 2 | East | 1 | Wall | Sills | Concrete | C | 3 | Minor damage with small areas broken away | ||||
| C | 2 | East | 1 | Wall | RWP Downpipes | Plastic | A | 3 | |||||
| C | 2 | East | 1 | Wall | Fixings | Proprietary | C | 3 | Light fittings are oxidising |
| C‐2 East 2 | Two Story Wall Elevation | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| C | 2 | East | 2 | Item | Element | Material | % | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| C | 2 | East | 2 | Wall | Cover | Dash | 80% | C | 3 | Dash has fallen off local to removed downpipe fixings points | |||
| C | 2 | East | 2 | Wall | Cover | Brick | 20% | B | 3 | Mortar pointing is deteriorating in places and voids provide ingress for weathering and water. | |||
| C | 2 | East | 2 | Wall | Chimney | Brick | B | 3 | Mortar pointing is deteriorating in places and voids provide ingress for weathering and water. | ||||
| C | 2 | East | 2 | Wall | Windows | Timber | B | 2 | Wear and tear | ||||
| C | 2 | East | 2 | Wall | Sills | Concrete | A | 3 | |||||
| C | 2 | East | 2 | Wall | Doorways | Rendered | C | 1 | Heavy corrosion to the lintels above the large garage openings | Yes | |||
| C | 2 | East | 2 | Wall | Doors | Timber | C | 3 | Glazing putty is breaking away, paint is delaminating generally, and fixings are corroding on the garage doors | Yes | |||
| C | 2 | East | 2 | Wall | RWP Downpipes | Aluminium | B | 3 | Wear and tear | ||||
| C | 2 | East | 2 | Wall | Fixings | Proprietary | C | 2 | Light fittings have oxidised and corrosion is heavy | ||||
| C | 2 | East | 2 | Wall | Fixings | Proprietary | C | 2 | Light fittings have oxidised and corrosion is heavy |
| C‐2 East 3 | Single Story Wall Elevation | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| C | 2 | East | 3 | Item | Element | Material | % | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| C | 2 | East | 3 | Wall | Cover | Dash | B | 2 | There are holes from old gutter brackets that have not been sealed, render has broken away local to the window sill locally | ||||
| C | 2 | East | 3 | Wall | Windows | Timber | C | 3 | Gaps between frames and reveals and sealant is missing | ||||
| C | 2 | East | 3 | Wall | Sills | Concrete | A | 3 | |||||
| C | 2 | East | 3 | Wall | RWP Downpipes | Aluminium | C | 3 | Powder coated aluminium is oxidising |
| C‐2 North 1 | Two Story Wall Elevation | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| C | 2 | North | 1 | Item | Element | Material | % | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| C | 2 | North | 1 | Wall | Cover | Brick | A | 3 | |||||
| C | 2 | North | 1 | Wall | Window Apertures | Brick | A | 3 | |||||
| C | 2 | North | 1 | Wall | Windows | Timber | B | 3 | Timber frame is ageing | ||||
| C | 2 | North | 1 | Wall | Fixings | Proprietary | A | 3 | Lighting, signage, services |
| C‐2 West 1 | Rooftop Wall Elevation above P‐3 | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| C | 2 | West | 1 | Item | Element | Material | % | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| C | 2 | West | 1 | Wall | Cover | Dash | B | 3 | Wear and tear | ||||
| C | 2 | West | 1 | Wall | RWP Downpipes | Metal | C | 2 | Corroding downpipes discharging on to P‐3 Roof |
| C‐2 West 2 | Single Story Wall Elevation | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| C | 2 | West | 2 | Item | Element | Material | % | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| C | 2 | West | 2 | Wall | Cover | Dash | 90% | C | 3 | Cracking visible in a few places, including window reveal | |||
| C | 2 | West | 2 | Wall | Cover | Brick | 10% | A | 3 | ||||
| C | 2 | West | 2 | Wall | Windows | UPVC | A | 3 | |||||
| C | 2 | West | 2 | Wall | Sills | Concrete | A | 3 | |||||
| C | 2 | West | 2 | Wall | RWP Downpipes | Metal | C | 3 | Cast iron down pipes and fixings have corrosion | ||||
| C | 2 | West | 2 | Wall | Fixings | Proprietary | B | 3 | Light fittings are oxidising |
| C‐2 West 3 | Rooftop Wall Elevation above C‐3 | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| C | 2 | West | 3 | Item | Element | Material | % | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| C | 2 | West | 3 | Wall | Cover | Dash | A | 3 | |||||
| C | 2 | West | 3 | Wall | RWP Downpipes | Plastic | B | 2 | New gutters discharge into old downpipes | ||||
| C | 2 | West | 3 | Wall | Fixings | Plastic | C | 3 | Conduit fixings are not secured | Yes |
| C‐2 Roof 1 | Pitched Roof | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| C | 2 | Roof | 1 | Item | Element | Material | % | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| C | 2 | Roof | 1 | Roof | Cover | Concrete | B | 3 | Wear & tear | ||||
| C | 2 | Roof | 1 | Roof | Ridge | Concrete | B | 3 | Wear & tear | ||||
| C | 2 | Roof | 1 | Roof | Eaves/Fascia | UPVC | B | 3 | Wear & tear | ||||
| C | 2 | Roof | 1 | Roof | Soffit | UPVC | B | 3 | Wear & tear | ||||
| C | 2 | Roof | 1 | Roof | Verge | Cement | D | 2 | Verge pointing has cracks and is incomplete in places by P‐3, C‐3, C‐2 South 2, C‐2 South 3, C‐2 North 1 and above F‐2 | ||||
| C | 2 | Roof | 1 | Roof | RWP Guttering | Plastic | C | 2 | One outlet connection is twisted, restricting flow | Yes | |||
| C | 2 | Roof | 1 | Roof | RWP Guttering | Plastic | C | 2 | Guttering connections are not correctly formed, sealed with mastic and likely to leak, and bracket missing | Yes | |||
| C | 2 | Roof | 1 | Roof | Side Abutment | Lead | B | 2 | Gutter valley and cover flashings to C‐2 South 2 |
| C‐3 West 1 | Single Story Wall Elevation | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| C | 3 | West | 1 | Item | Element | Material | % | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| C | 3 | West | 1 | Wall | Cover | Brick | A | ||||||
| C | 3 | West | 1 | Wall | Doorways | Brick | A | ||||||
| C | 3 | West | 1 | Wall | Doors | Metal | A | ||||||
| C | 3 | West | 1 | Wall | RWP Downpipes | Metal | B | 2 | Corroding metal downpipe collecting from plastic guttering | ||||
| C | 3 | West | 1 | Wall | Fixings | Proprietary | C | 1 | Light fittings, one is deteriorating | Yes | |||
| C | 3 | West | 1 | Wall | Penetrations | Services | C | 2 | Vents have no bird/insect covers fitted |
| C‐3 East 1 | Rooftop Wall Elevation Parapet between F‐2 Roof | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| C | 3 | East | 1 | Item | Element | Material | % | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| C | 3 | East | 1 | Wall | Cover | Brick | C | 2 | Mortar pointing is deteriorating in places and voids provide ingress for weathering and water | ||||
| C | 3 | East | 1 | Wall | Capping | Concrete | B | 3 | Wear and tear |
| C‐3 Roof 1 | Flat Roof abutting H‐1, C‐1, C‐2, F‐2 and connected to C‐4 Roof | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| C | 3 | Roof | 1 | Item | Element | Material | % | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| C | 3 | Roof | 1 | Roof | Cover | Mineral Felt | B | 3 | Standing water is present | ||||
| C | 3 | Roof | 1 | Roof | Soffit | UPVC | A | 3 | |||||
| C | 3 | Roof | 1 | Roof | RWP Guttering | Plastic | B | 3 | Plastic guttering discharges into cast iron downpipe | ||||
| C | 3 | Roof | 1 | Roof | RWP Guttering | Aluminium | C | 2 | Aluminium gutter sections are oxidising | ||||
| C | 3 | Roof | 1 | Roof | Flashing | Lead | C | 1 | Lead flashings are damaged and lifting in places. Mortar has not been completed in along C‐3 East 1 parapet | Yes | |||
| C | 3 | Roof | 1 | Roof | Roof Lights | Metal | B | 3 | Wear and tear |
| C‐4 South 1 | Single Story Wall Elevation (Two small elevations) | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| C | 4 | South | 1 | Item | Element | Material | % | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| C | 4 | South | 1 | Wall | Cover | Dash | A | 3 | |||||
| C | 4 | South | 1 | Wall | Window Apertures | Rendered | C | 3 | Gaps around the rotting window sill | ||||
| C | 4 | South | 1 | Wall | Windows | Timber | C | 3 | Paint is peeling from the window frame and frame is deteriorating | ||||
| C | 4 | South | 1 | Wall | Sills | Concrete | A | 3 | |||||
| C | 4 | South | 1 | Wall | RWP Downpipes | Aluminium | C | 3 | Oxidisation is evident below the powdered coated surface, and the surface is discoloured. | ||||
| C | 4 | South | 1 | Wall | Parapets | Dash | A | 3 | |||||
| C | 4 | South | 1 | Wall | Capping | Concrete | B | 3 | Wear and tear | ||||
| C | 4 | South | 1 | Wall | Penetrations | Services | C | 3 | Small gaps around pipe penetrations have not been sealed | ||||
| C | 4 | South | 1 | Wall | Ramps | Concrete | B | 3 | Wear and tear |
| C‐4 Roof 1 | Flat Roof abutting H‐1, C‐1 & C‐3 Roof | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| C | 4 | Roof | 1 | Item | Element | Material | % | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| C | 4 | Roof | 1 | Roof | Cover | Mineral Felt | B | 2 | Detritus and lichen is present on this aging roof covering | ||||
| C | 4 | Roof | 1 | Roof | Flashing | Lead | B | 2 | Lead flashings are damaged and lifting in places | ||||
| C | 4 | Roof | 1 | Roof | Roof Lights | Metal | A | 3 | Sun Tubes |
| D‐1 South 1 | Single Story Wall Elevation in Courtyard | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| D | 1 | South | 1 | Item | Element | Material | % | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| D | 1 | South | 1 | Wall | Cover | Timber | A | 3 |
| D‐1 East 1 | Single Story Wall Elevation in Courtyard (Includes small South Side Elevation) | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| D | 1 | East | 1 | Item | Element | Material | % | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| D | 1 | East | 1 | Wall | Cover | Timber | 50% | A | 3 | ||||
| D | 1 | East | 1 | Wall | Cover | UPVC | 50% | A | 3 | ||||
| D | 1 | East | 1 | Wall | Windows | UPVC | A | 3 | |||||
| D | 1 | East | 1 | Wall | Sills | UPVC | A | 3 | |||||
| D | 1 | East | 1 | Wall | RWP Downpipes | UPVC | B | 2 | Broken brackets | Yes | |||
| D | 1 | East | 1 | Wall | Fixings | A | 3 | ||||||
| D | 1 | East | 1 | Wall | Pathways | Timber | A | 3 | |||||
| D | 1 | East | 1 | Wall | Railing | Timber | A | 3 |
| D‐1 North 1 | Single Story Wall Elevation (Includes small East Side Elevation) | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| D | 1 | North | 1 | Item | Element | Material | % | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| D | 1 | North | 1 | Wall | Cover | Brick | C | 3 | Mortar pointing is starting to deteriorate, small holes and voids are present | ||||
| D | 1 | North | 1 | Wall | Windows | Timber | B | 2 | Frames are aged | ||||
| D | 1 | North | 1 | Wall | Sills | Concrete | A | 3 | |||||
| D | 1 | North | 1 | Wall | Doorways | Brick | B | Metal trims around the frames are starting to corrode, there is no mastic seal | |||||
| D | 1 | North | 1 | Wall | Doors | Timber | C | 3 | Door furniture is corroding | ||||
| D | 1 | North | 1 | Wall | Screens | Timber | C | 3 | Sections of the surround frame timber is broken off allowing weather/water ingress | ||||
| D | 1 | North | 1 | Wall | RWP Downpipes | Plastic | C | 3 | Some brackets are broken and fixings are corroding | ||||
| D | 1 | North | 1 | Wall | Pathways | Slabs | C | 3 | Concrete slabs are starting to break in places and the stone base ground adjacent is uneven, with standing water | ||||
| D | 1 | North | 1 | Wall | Fixings | Metal | C | 3 | Fixings are corroding | ||||
| D | 1 | North | 1 | Wall | Fixings | Proprietary | B | 3 | Light fittings & CCTV |
| D‐1 West 1 | Single Story Wall Elevation (Includes small side panel RHS) | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| D | 1 | West | 1 | Item | Element | Material | % | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| D | 1 | West | 1 | Wall | Cover | Brick | C | 3 | Mortar pointing is starting to deteriorate, small holes and voids are present | ||||
| D | 1 | West | 1 | Wall | Windows | Timber | C | 3 | Paint is cracking at the frame joints, there is local lichen and deterioration. Fixings are corroding and staining the paintwork. Furniture is corroding | ||||
| D | 1 | West | 1 | Wall | Sills | Concrete | B | 3 | Wear & tear | ||||
| D | 1 | West | 1 | Wall | Screens | Timber | C | 3 | Sections of the surround frame timber is broken off allowing weather/water ingress | ||||
| D | 1 | West | 1 | Wall | RWP Downpipes | Plastic | C | 3 | Brackets are missing and broken, fixing are corroding. Cover missing from gully | ||||
| D | 1 | West | 1 | Wall | Pathways | Slabs | B | 3 | Wear & tear |
| D‐1 West 2 | Single Story Wall Elevation (Includes small North Side Elevation) | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| D | 1 | West | 2 | Item | Element | Material | % | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| D | 1 | West | 2 | Wall | Cover | Timber | C | 3 | Mortar pointing is starting to deteriorate, small holes and voids are present | ||||
| D | 1 | West | 2 | Wall | Windows | Timber | C | 3 | Paint is cracking at the frame joints, there is local lichen and deterioration. Fixings are corroding and staining the paintwork. Furniture is corroding | ||||
| D | 1 | West | 2 | Wall | Sills | Concrete | B | 3 | Wear & tear | ||||
| D | 1 | West | 2 | Wall | Doors | Timber | C | 3 | Door furniture is corroding | ||||
| D | 1 | West | 2 | Wall | Screens | Timber | C | 3 | Paint is cracking at the frame joints, there is local lichen and deterioration. Fixings are corroding and staining the paintwork. | ||||
| D | 1 | West | 2 | Wall | RWP Downpipes | Plastic | C | 3 | Some brackets are broken and fixings are corroding | ||||
| D | 1 | West | 2 | Wall | SVP | Metal | C | 3 | Cast iron pipe is corroding including the fixings, the top section of pipe has no fixing timber grounds are rotting | ||||
| D | 1 | West | 2 | Wall | Fixings | Metal | C | 3 | Fixings are corroding | ||||
| D | 1 | West | 2 | Wall | Fixings | Proprietary | B | 3 | Light fittings & CCTV | ||||
| D | 1 | West | 2 | Wall | Pathways | Slabs | C | 3 | Concrete slabs are starting to break in places and the stone base ground adjacent is uneven |
| D‐1 Roof 1 | Flat Roof abutting D‐2, D‐3, D‐4, D‐5 & M‐1 | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| D | 1 | Roof | 1 | Item | Element | Material | % | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| D | 1 | Roof | 1 | Roof | Cover | Mineral Felt | B | 2 | Wear and tear | ||||
| D | 1 | Roof | 1 | Roof | Eaves/Fascia | Timber | C | 1 | Plywood is delaminating in places and panels are not continuous | ||||
| D | 1 | Roof | 1 | Roof | Eaves/Fascia | Aluminium | A | Trim fitted in places | |||||
| D | 1 | Roof | 1 | Roof | Eaves/Fascia | UPVC | A | Trim fitted in courtyard and above D‐4 roof | |||||
| D | 1 | Roof | 1 | Roof | Soffit | Timber | B | 2 | Wear and tear | ||||
| D | 1 | Roof | 1 | Roof | RWP Hopper | Lead | B | 2 | Wear and tear | ||||
| D | 1 | Roof | 1 | Roof | Flashing | Lead | C | 2 | Abutting M‐1 | ||||
| D | 1 | Roof | 1 | Roof | Flashing | Mineral Felt | C | 2 | Abutting D‐2 | ||||
| D | 1 | Roof | 1 | Roof | Roof Lights | Metal | B | 2 | Roof lights | ||||
| D | 1 | Roof | 1 | Roof | Roof Terminals | Proprietary | B | 2 | Air extraction plant |
| D‐2 South 1 | Rooftop Elevation above D‐1 | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| D | 2 | South | 1 | Item | Element | Material | % | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| D | 2 | South | 1 | Wall | Windows | UPVC | A | 3 | |||||
| D | 2 | South | 1 | Wall | Sills | UPVC | A | 3 |
| D‐2 North 1 | Rooftop Elevation above D‐1 | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| D | 2 | North | 1 | Item | Element | Material | % | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| D | 2 | North | 1 | Wall | Windows | UPVC | A | 3 | |||||
| D | 2 | North | 1 | Wall | Sills | UPVC | A | 3 |
| D‐2 West 1 | RoRooftop Elevation above D‐1 | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| D | 2 | West | 1 | Item | Element | Material | % | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| D | 2 | West | 1 | Wall | Windows | UPVC | A | 3 | |||||
| D | 2 | West | 1 | Wall | Sills | UPVC | A | 3 | |||||
| D | 2 | West | 1 | Wall | RWP Downpipes | UPVC | A | 3 |
| D‐2 East 1 | Rooftop Elevation above D‐1 | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| D | 2 | East | 1 | Item | Element | Material | % | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| D | 2 | East | 1 | Wall | Windows | UPVC | A | 3 | |||||
| D | 2 | East | 1 | Wall | Sills | UPVC | A | 3 | |||||
| D | 2 | East | 1 | Wall | RWP Downpipes | UPVC | A | 3 |
| D‐2 Roof 1 | Flat Roof | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| D | 2 | Roof | 1 | Item | Element | Material | % | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| D | 2 | Roof | 1 | Roof | Cover | Mineral Felt | B | 3 | Wear and tear | ||||
| D | 2 | Roof | 1 | Roof | Eaves/Fascia | UPVC | A | 3 | GRP trim | ||||
| D | 2 | Roof | 1 | Roof | Soffit | UPVC | A | 3 | |||||
| D | 2 | Roof | 1 | Roof | RWP Hopper | UPVC | A | 3 | |||||
| D | 2 | Roof | 1 | Roof | Roof Lights | Metal | A | 3 |
| D‐3 South 1 | Rooftop Fascia above D‐4 | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| D | 3 | South | 1 | Item | Element | Material | % | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| D | 3 | South | 1 | Roof | Eaves/Fascia | UPVC | A | 3 |
| D‐3 East 1 | Single Story Wall Elevation | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| D | 3 | East | 1 | Item | Element | Material | % | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| D | 3 | East | 1 | Wall | Cover | Dash | B | 2 | Render beads at movement joints are corroding, and there is some damage to the bell cast molding. Redundant fixings are corroding | ||||
| D | 3 | East | 1 | Wall | Window Apertures | Rendered | A | 3 | |||||
| D | 3 | East | 1 | Wall | Windows | Timber | D | 1 | Timber frames and sills are rotting | ||||
| D | 3 | East | 1 | Wall | Sills | Concrete | A | 3 | |||||
| D | 3 | East | 1 | Wall | Doorways | Rendered | A | 3 | |||||
| D | 3 | East | 1 | Wall | Doors | Timber | A | 3 | |||||
| D | 3 | East | 1 | Wall | RWP Downpipes | UPVC | C | 3 | Fixings are corroding | ||||
| D | 3 | East | 1 | Wall | Penetrations | Services | B | 2 | Waste pipe and surface mounted gas supply pipe, corrosion to fixings | ||||
| D | 3 | East | 1 | Wall | Pathways | Concrete | B | 3 | Concrete hard standing |
| D‐3 North 1 | Single Story Wall Elevation | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| D | 3 | North | 1 | Item | Element | Material | % | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| D | 3 | North | 1 | Wall | Cover | Dash | B | 3 | Minor cracks extending from the door openings | ||||
| D | 3 | North | 1 | Wall | Doorways | Rendered | C | 3 | Minor cracks extending from the door openings. Corrosion on the lintel over the doors | ||||
| D | 3 | North | 1 | Wall | Doors | Timber | C | 3 | Door furniture is corroding | ||||
| D | 3 | North | 1 | Wall | Fixings | Proprietary | C | 3 | Light fittings, one has a cracked lens and is aged | ||||
| D | 3 | North | 1 | Wall | Pathways | Macadam | B | 2 | Wear and tear | ||||
| D | 3 | North | 1 | Wall | Ramps | Concrete | B | 2 | Wear and tear |
| D‐3 West 1 | Rooftop Fascia above D‐4 | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| D | 3 | West | 1 | Item | Element | Material | % | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| D | 3 | West | 1 | Wall | Eaves/Fascia | UPVC | A | 3 |
| D‐3 Roof 1 | Flat Roof abutting D‐1 & D‐4 | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| D | 3 | Roof | 1 | Item | Element | Material | % | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| D | 3 | Roof | 1 | Roof | Cover | Mineral Felt | B | 2 | GRP trim. Detritus and moss growth | ||||
| D | 3 | Roof | 1 | Roof | Eaves/Fascia | Timber | C | 1 | Paint is delaminating and deterioration is evident | ||||
| D | 3 | Roof | 1 | Roof | Eaves/Fascia | UPVC | B | 3 | North Elevation | ||||
| D | 3 | Roof | 1 | Roof | RWP Guttering | Plastic | C | 3 | Plastic is discoloured and fixing are corroding | ||||
| D | 3 | Roof | 1 | Roof | Penetrations | Proprietary | B | 3 | Air extraction plant |
| D‐4 South 1 | Single Story Wall Elevation (Small) and partly above D‐5 | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| D | 4 | South | 1 | Item | Element | Material | % | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| D | 4 | South | 1 | Wall | Cover | UPVC | 50% | A | 3 | ||||
| D | 4 | South | 1 | Wall | Cover | Timber | 50% | A | 3 | ||||
| D | 4 | South | 1 | Wall | Windows | UPVC | A | 3 | |||||
| D | 4 | South | 1 | Wall | Pathways | Timber | 50% | A | 3 | ||||
| D | 4 | South | 1 | Wall | Pathways | Gravel | 50% | A | 3 |
| D‐4 North 1 | Single Story Wall Elevation (No.3 Small Sections) | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| D | 4 | North | 1 | Item | Element | Material | % | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| D | 4 | North | 1 | Wall | Cover | Timber | B | 2 | Wear and tear | ||||
| D | 4 | North | 1 | Wall | Windows | UPVC | B | 3 | Wear and tear | ||||
| D | 4 | North | 1 | Wall | Sills | UPVC | B | 3 | Wear and tear | ||||
| D | 4 | North | 1 | Wall | RWP Downpipes | Plastic | B | 3 | Wear and tear | ||||
| D | 4 | North | 1 | Wall | Fixings | Services | B | 1 | Gas pipe surface mounted, one bracket is not fixed | Yes | |||
| D | 4 | North | 1 | Wall | Fixings | Services | B | 2 | Air vent covers | ||||
| D | 4 | North | 1 | Wall | Penetrations | Services | C | 1 | SVP passing through the fascia have not been sealed very well | Yes |
| D‐4 Roof 1 | Flat Roof abutting D‐1, D‐3 & D‐5, J‐2 and connected to J‐1, J‐3 | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| D | 4 | Roof | 1 | Item | Element | Material | % | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| D | 4 | Roof | 1 | Roof | Cover | GRP | B | 2 | Detritus and evidence of standing water present, repaired after removing a roof light | ||||
| D | 4 | Roof | 1 | Roof | Eaves/Fascia | Timber | D | 3 | Ply and chipboard painted fascia is deteriorating | ||||
| D | 4 | Roof | 1 | Roof | RWP Hopper | GRP | A | 3 | |||||
| D | 4 | Roof | 1 | Roof | Roof Lights | Metal | B | 3 | Roof light and sun tube | ||||
| D | 4 | Roof | 1 | Roof | Flashing | GRP | A | 3 |
| D‐5 South 1 | Single Story Wall Elevation (Conservatory) | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| D | 5 | South | 1 | Item | Element | Material | % | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| D | 5 | South | 1 | Wall | Cover | UPVC | A | 3 | |||||
| D | 5 | South | 1 | Wall | Windows | UPVC | A | 3 | |||||
| D | 5 | South | 1 | Wall | Doors | UPVC | A | 3 | |||||
| D | 5 | South | 1 | Wall | RWP Downpipes | UPVC | A | 3 | |||||
| D | 5 | South | 1 | Wall | Pathways | Timber | A | 3 | |||||
| D | 5 | South | 1 | Wall | Railing | Timber | A | 3 |
| D‐5 East 1 | Single Story Wall Elevation (Conservatory) | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| D | 5 | East | 1 | Item | Element | Material | % | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| D | 5 | East | 1 | Wall | Cover | UPVC | A | 3 | |||||
| D | 5 | East | 1 | Wall | Windows | UPVC | A | 3 | |||||
| D | 5 | East | 1 | Wall | Pathways | Timber | A | 3 |
| D‐5 Roof 1 | Conservatory abutting D‐4 & D‐1 | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| D | 5 | Roof | 1 | Item | Element | Material | % | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| D | 5 | Roof | 1 | Roof | Cover | UPVC | A | 3 | |||||
| D | 5 | Roof | 1 | Roof | Eaves/Fascia | UPVC | A | 3 | |||||
| D | 5 | Roof | 1 | Roof | Verge | GRP | A | 3 | |||||
| D | 5 | Roof | 1 | Roof | RWP Guttering | UPVC | A | 3 | |||||
| D | 5 | Roof | 1 | Roof | Top Abutment | GRP | A | 3 |
| E‐1 South 1 | Single Story Wall Elevation Gable | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| E | 1 | South | 1 | Item | Element | Material | % | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| E | 1 | South | 1 | Wall | Cover | Dash | D | 1 | Cracks are evident vertically along the left side corner and to the render band below DPC | ||||
| E | 1 | South | 1 | Wall | Window Apertures | Rendered | C | 2 | Corrosion is evident on the lintels above the windows | ||||
| E | 1 | South | 1 | Wall | Windows | Aluminium | A | 2 | |||||
| E | 1 | South | 1 | Wall | Sills | Concrete | A | 3 | |||||
| E | 1 | South | 1 | Wall | Fixings | Proprietary | B | 2 | Lighting mast and light have corrosion visible | ||||
| E | 1 | South | 1 | Wall | Pathways | Macadam | B | 3 | Wear & tear |
| E‐1 East 1 | Single Story Wall Elevation | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| E | 1 | East | 1 | Item | Element | Material | % | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| E | 1 | East | 1 | Wall | Cover | Dash | C | 3 | Cracks are evident to the dash | ||||
| E | 1 | East | 1 | Wall | Window Apertures | Rendered | C | 3 | Corrosion in evident to the lintels above the windows | ||||
| E | 1 | East | 1 | Wall | Windows | Aluminium | A | 3 | |||||
| E | 1 | East | 1 | Wall | Sills | Concrete | A | 3 | |||||
| E | 1 | East | 1 | Wall | Doorways | Rendered | C | 3 | Gaps between the frames and reveals, with local chips, there is no mastic sealant | ||||
| E | 1 | East | 1 | Wall | Doors | Metal | B | 2 | There is minor pitting and discolouration on the door furniture | ||||
| E | 1 | East | 1 | Wall | RWP Downpipes | Aluminium | C | 3 | Oxidisation is evident below the powdered coated surface, and the surface is discoloured. | ||||
| E | 1 | East | 1 | Wall | Pathways | Macadam | B | 3 | Wear & tear | ||||
| E | 1 | East | 1 | Wall | Ramps | Concrete | B | 3 | Wear & tear |
| E‐1 West 1 | Single Story Wall Elevation in Courtyard | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| E | 1 | West | 1 | Item | Element | Material | % | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| E | 1 | West | 1 | Wall | Cover | Dash | 90% | C | 3 | Cracking noted to dash coating in local areas | |||
| E | 1 | West | 1 | Wall | Cover | Brick | 10% | A | 3 | ||||
| E | 1 | West | 1 | Wall | Window Apertures | Rendered | A | 3 | |||||
| E | 1 | West | 1 | Wall | Windows | Timber | C | 2 | Window timbers are starting to deteriorate, weather protection has eroded or delaminated | ||||
| E | 1 | West | 1 | Wall | Sills | Concrete | C | 2 | Crack failure noted to one sill | ||||
| E | 1 | West | 1 | Wall | RWP Downpipes | Aluminium | C | 3 | Oxidisation is evident below the powdered coated surface, and the surface is discoloured. | ||||
| E | 1 | West | 1 | Wall | Fixings | Metal | C | 2 | Corrosion to brackets (Flower baskets) | ||||
| E | 1 | West | 1 | Wall | Pathways | Slabs | C | 2 | Vegetation growth and some unevenness |
| E‐1 Roof 1 | Pitched Roof abutting E‐2, E‐3 & E‐5 | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| E | 1 | Roof | 1 | Item | Element | Material | % | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| E | 1 | Roof | 1 | Roof | Cover | Concrete | C | 2 | Several valley tiles are broken and dislodged in valley. Repairs generally have been undertaken to tiles in several locations | ||||
| E | 1 | Roof | 1 | Roof | Ridge | Concrete | B | 2 | Wear & tear | ||||
| E | 1 | Roof | 1 | Roof | Valley | Lead | C | 1 | Tiles slipped into valley | Yes | |||
| E | 1 | Roof | 1 | Roof | Eaves/Fascia | Timber | C | 2 | Paint is delaminating to the older section of eaves adjacent to the box guttering area, suggesting the box guttering needs remedial works | ||||
| E | 1 | Roof | 1 | Roof | Soffit | Soffit Brd | D | 2 | Timbers are rotten in places, paint is delaminating and there are gaps. Fixings are corroding to the older section | ||||
| E | 1 | Roof | 1 | Roof | Verge | Cement | C | 2 | Local cracking to the small verge in the courtyard | ||||
| E | 1 | Roof | 1 | Roof | RWP Guttering | Aluminium | C | 3 | Oxidisation is evident below the powdered coated surface, and the surface is discoloured. | ||||
| E | 1 | Roof | 1 | Roof | Side Abutment | Lead | A | 3 | |||||
| E | 1 | Roof | 1 | Roof | Top Abutment | Lead | A | 3 | |||||
| E | 1 | Roof | 1 | Roof | Side Abutment | Lead | A | 3 | |||||
| E | 1 | Roof | 1 | Roof | Roof Lights | Metal | A | 3 |
| E‐2 South 1 | Rooftop Wall Elevation above E‐1 | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| E | 2 | South | 1 | Item | Element | Material | % | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| E | 2 | South | 1 | Wall | Cover | Dash | B | 3 | Repairs works have been undertaken to the cover flashings adjacent to E‐1 roof |
| E‐2 East 1 | Rooftop Wall Elevation above H‐3 | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| E | 2 | East | 1 | Item | Element | Material | % | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| E | 2 | East | 1 | Wall | Cover | Dash | B | 3 | Repairs have been undertaken to replacement flashings to roof H‐3 |
| E‐2 North 1 | Rooftop Wall Elevation Gable above E‐6 | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| E | 2 | North | 1 | Item | Element | Material | % | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| E | 2 | North | 1 | Wall | Cover | Dash | A | 3 | |||||
| E | 2 | North | 1 | Wall | Fixings | Metal | D | 2 | Redundant brackets are corroding |
| E‐2 West 1 | Rooftop Wall Elevation above E‐5 & E‐1 | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| E | 2 | West | 1 | Item | Element | Material | % | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| E | 2 | West | 1 | Wall | Cover | Dash | A | 3 | |||||
| E | 2 | West | 1 | Wall | Window Apertures | Rendered | A | 3 | |||||
| E | 2 | West | 1 | Wall | Windows | Timber | D | 2 | Timber frames are starting to deteriorate | ||||
| E | 2 | West | 1 | Wall | Sills | Concrete | B | 3 | |||||
| E | 2 | West | 1 | Wall | RWP Downpipes | Aluminium | C | 3 | Oxidisation is evident below the powdered coated surface, and the surface is discoloured. |
| E‐2 Roof 1 | Roof Pitched | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| E | 2 | Roof | 1 | Item | Element | Material | % | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| E | 2 | Roof | 1 | Roof | Cover | Concrete | C | 2 | Numerous repairs have been undertaken to the tiling. Eaves support tray has started to break up | ||||
| E | 2 | Roof | 1 | Roof | Ridge | Concrete | A | 2 | |||||
| E | 2 | Roof | 1 | Roof | Eaves/Fascia | Timber | D | 2 | Paint has delaminated and timber is deteriorating, east elevation mostly | ||||
| E | 2 | Roof | 1 | Roof | Soffit | Soffit Brd | C | 2 | Paint is delaminating from the boards | ||||
| E | 2 | Roof | 1 | Roof | Verge | Cement | A | 3 | |||||
| E | 2 | Roof | 1 | Roof | RWP Guttering | Aluminium | C | 3 | Oxidisation is evident below the powdered coated surface, and the surface is discoloured. Fixings are missing from the guttering | ||||
| E | 2 | Roof | 1 | Roof | Roof Lights | Metal | B | 3 | Wear and tear |
| E‐3 South 1 | Single Story Wall Elevation (Small) | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| E | 3 | South | 1 | Item | Element | Material | % | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| E | 3 | South | 1 | Wall | Cover | Dash | C | 3 | There is cracking to the dash, including central above one window | ||||
| E | 3 | South | 1 | Wall | Window Apertures | Rendered | C | 3 | Corrosion is present on the lintels above the windows. Remedial repairs to the reveals from window replacements have debonded in some sections | ||||
| E | 3 | South | 1 | Wall | Windows | Aluminium | A | 3 | |||||
| E | 3 | South | 1 | Wall | Sills | Concrete | A | ||||||
| E | 3 | South | 1 | Wall | RWP Downpipes | Aluminium | C | 3 | Oxidisation is evident below the powdered coated surface, and the surface is discoloured. | ||||
| E | 3 | South | 1 | Wall | Pathways | Macadam | B | 3 |
| E‐3 North 1 | Single Story Wall Elevation in Courtyard | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| E | 3 | North | 1 | Item | Element | Material | % | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| E | 3 | North | 1 | Wall | Cover | Dash | 80% | A | 3 | ||||
| E | 3 | North | 1 | Wall | Cover | Brick | 20% | A | 3 | ||||
| E | 3 | North | 1 | Wall | Window Apertures | Rendered | A | 3 | |||||
| E | 3 | North | 1 | Wall | Windows | Timber | C | 2 | Window timbers are starting to deteriorate, weather protection has eroded or delaminated | ||||
| E | 3 | North | 1 | Wall | Sills | Concrete | A | 3 | |||||
| E | 3 | North | 1 | Wall | Doorways | Rendered | C | 3 | Repairs have been undertaken locally | ||||
| E | 3 | North | 1 | Wall | Doors | Aluminium | A | 3 | |||||
| E | 3 | North | 1 | Wall | RWP Downpipes | Aluminium | C | 3 | Oxidisation is evident below the powdered coated surface, and the surface is discoloured. | ||||
| E | 3 | North | 1 | Wall | Pathways | Slabs | C | 2 | Vegetation growth and some unevenness | ||||
| E | 3 | North | 1 | Wall | Ramps | Timber | B | 2 | Aging timber |
| E‐3 West 1 | Single Story Wall Elevation (Two small elevations S & E) | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| E | 3 | West | 1 | Item | Element | Material | % | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| E | 3 | West | 1 | Wall | Cover | Dash | B | 3 | Minor cracks to the dash and render band at DPC, low level corner cracking is wide | ||||
| E | 3 | West | 1 | Wall | Window Apertures | Rendered | C | 3 | Corrosion is present on the lintels above the windows | ||||
| E | 3 | West | 1 | Wall | Windows | Timber | C | 2 | Windows are delaminating and starting rotting in places | ||||
| E | 3 | West | 1 | Wall | Sills | Concrete | A | 3 | |||||
| E | 3 | West | 1 | Wall | RWP Downpipes | Aluminium | C | 3 | Oxidisation is evident below the powdered coated surface, and the surface is discoloured. | ||||
| E | 3 | West | 1 | Wall | Pathways | Macadam | B | 3 | Wear and tear |
| E‐3 Roof 1 | Pitched Roof abutting E‐4 and Valley connection to E‐1 | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| E | 3 | Roof | 1 | Item | Element | Material | % | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| E | 3 | Roof | 1 | Roof | Cover | Concrete | C | 1 | One tile has broken/dislodged and is sitting on the roof | ||||
| E | 3 | Roof | 1 | Roof | Eaves/Fascia | Timber | B | 1 | Paint is delaminating from the boards | ||||
| E | 3 | Roof | 1 | Roof | Soffit | Soffit Brd | C | 3 | Paint is delaminating from the boards and some delamination of the boards local to joint | ||||
| E | 3 | Roof | 1 | Roof | RWP Guttering | Aluminium | C | 3 | Oxidisation is evident below the powdered coated surface, and the surface is discoloured. | ||||
| E | 3 | Roof | 1 | Roof | RWP Guttering | Aluminium | C | 3 | There is vegetation growing from the guttering | Yes | |||
| E | 3 | Roof | 1 | Roof | Side Abutment | Lead | B | 2 | |||||
| E | 3 | Roof | 1 | Roof | Verge | Cement | C | 2 | Crack mortar on the half verge | ||||
| E | 3 | Roof | 1 | Roof | Valley | Lead | C | 1 | There are bits of broken tile in the valley and mortar is deteriorating (Same item as E‐1 roof valley) | Yes |
| E‐4 South 1 | Single Story Wall Elevation and balcony above | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| E | 4 | South | 1 | Item | Element | Material | % | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| E | 4 | South | 1 | Wall | Cover | Dash | 70% | A | 3 | ||||
| E | 4 | South | 1 | Wall | Cover | Brick | 30% | A | 3 | ||||
| E | 4 | South | 1 | Wall | Window Apertures | Rendered | C | 3 | Corrosion is present on the lintels above the windows | ||||
| E | 4 | South | 1 | Wall | Windows | Timber | C | 2 | Windows are delaminating and starting rotting in places | ||||
| E | 4 | South | 1 | Wall | Sills | Concrete | A | 3 | |||||
| E | 4 | South | 1 | Wall | RWP Downpipes | Aluminium | C | 3 | Oxidisation is evident below the powdered coated surface, and the surface is discoloured. | ||||
| E | 4 | South | 1 | Wall | Pathways | Macadam | B | 3 | Wear and tear |
| E‐4 East 1 | Rooftop Wall Elevation to balcony above E‐3 | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| E | 4 | East | 1 | Item | Element | Material | % | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| E | 4 | East | 1 | Wall | Cover | Dash | A | 3 | |||||
| E | 4 | East | 1 | Wall | Railing | Proprietary | A | 3 |
| E‐4 West 1 | Single Story Wall Elevation and balcony above | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| E | 4 | West | 1 | Item | Element | Material | % | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| E | 4 | West | 1 | Wall | Cover | Dash | B | 2 | The dash above the doorway is starting to delaminate and minor cracks are present | ||||
| E | 4 | West | 1 | Wall | Doorways | Timber | C | 3 | Timber T&G board varnish is peeling off | ||||
| E | 4 | West | 1 | Wall | Doorways | Timber | C | 3 | Soffit has numerous redundant holes and varnish is peeling off | ||||
| E | 4 | West | 1 | Wall | Doorways | Rendered | C | 3 | Redundant fixing points are starting to corrode | ||||
| E | 4 | West | 1 | Wall | Doors | Metal | B | 2 | Wear and tear | ||||
| E | 4 | West | 1 | Wall | Railing | Proprietary | B | 3 | Wear and tear | ||||
| E | 4 | West | 1 | Wall | Ramps | Concrete | B | 3 | Wear and tear |
| E‐4 Balcony 1 | Flat Roof abutting B‐1 | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| E | 4 | Balcony | 1 | Item | Element | Material | % | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| E | 4 | Balcony | 1 | Balcony | Cover | GRP | A | 3 | Detritus and standing water is present | ||||
| E | 4 | Balcony | 1 | Balcony | Eaves/Fascia | Timber | C | 2 | Paint is delaminating from the boards | ||||
| E | 4 | Balcony | 1 | Balcony | Soffit | Soffit Brd | C | 2 | Paint is severely delaminating from the boards and corrosion is affecting the fixings | ||||
| E | 4 | Balcony | 1 | Balcony | RWP Guttering | Aluminium | C | 3 | Oxidisation is evident below the powdered coated surface, and the surface is discoloured. | ||||
| E | 4 | Balcony | 1 | Balcony | Top Abutment | Lead | C | 3 | Lead has not been trimmed and dressed suitably, lead is lifting in areas | ||||
| E | 4 | Balcony | 1 | Balcony | Flashing | GRP | D | 1 | Flashings have not been completed around some sections of the piers on the balcony level | ||||
| E | 4 | Balcony | 1 | Balcony | Capping | Concrete | C | 2 | Pointing has broken away leaving gaps between capping | ||||
| E | 4 | Balcony | 1 | Balcony | Railing | Proprietary | A | 3 |
| E‐5 South 1 | Single Story Wall Elevation in Courtyard partly above E‐1 | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| E | 5 | South | 1 | Item | Element | Material | % | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| E | 5 | South | 1 | Wall | Cover | Dash | B | 3 | |||||
| E | 5 | South | 1 | Wall | Window Apertures | Rendered | C | 3 | Cracking and partial failure of the render adjacent to the window sill | ||||
| E | 5 | South | 1 | Wall | Windows | UPVC | B | 3 | |||||
| E | 5 | South | 1 | Wall | Sills | Concrete | B | 3 | |||||
| E | 5 | South | 1 | Wall | Pathways | Slabs | C | 2 | Vegetation growth and some unevenness | ||||
| E | 5 | South | 1 | Wall | Fixings | Metal | A | 3 | (Trellis) |
| E‐5 North 1 | Rooftop Wall Elevation above E‐6 | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| E | 5 | North | 1 | Item | Element | Material | % | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| E | 5 | North | 1 | Wall | Cover | Dash | A | 3 |
| E‐5 West 1 | Single Story Wall Elevation in Courtyard partly above E‐6 | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| E | 5 | West | 1 | Item | Element | Material | % | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| E | 5 | West | 1 | Wall | Cover | Dash | A | 3 | |||||
| E | 5 | West | 1 | Wall | Window Apertures | Rendered | A | 3 | |||||
| E | 5 | West | 1 | Wall | Windows | UPVC | A | 3 | |||||
| E | 5 | West | 1 | Wall | Sills | Concrete | B | 3 | |||||
| E | 5 | West | 1 | Wall | RWP Downpipes | Aluminium | C | 3 | Oxidisation is evident below the powdered coated surface, and the surface is discoloured. Vegetation is growing in the gutters | ||||
| E | 5 | West | 1 | Wall | Fixings | Proprietary | B | 2 | School Bell | ||||
| E | 5 | West | 1 | Wall | Pathways | Slabs | C | 2 | Vegetation growth and some unevenness |
| E‐5 Roof 1 | Flat Roof abutting E‐2 | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| E | 5 | Roof | 1 | Item | Element | Material | % | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| E | 5 | Roof | 1 | Roof | Cover | Mineral Felt | C | 2 | Detritus and lichen is present. Standing water is present | ||||
| E | 5 | Roof | 1 | Roof | Eaves/Fascia | Timber | B | 2 | Paint has started delaminated | ||||
| E | 5 | Roof | 1 | Roof | Soffit | Soffit Brd | D | 2 | Paint is delaminating from the boards | ||||
| E | 5 | Roof | 1 | Roof | RWP Guttering | Aluminium | C | 3 | Oxidisation is evident below the powdered coated surface, and the surface is discoloured. Vegetation is growing in the gutters | ||||
| E | 5 | Roof | 1 | Roof | Flashing | Lead | A | 3 | |||||
| E | 5 | Roof | 1 | Roof | Roof Lights | Metal | A | 3 |
| E‐6 South 1 | Single Story Wall Elevation in Courtyard | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| E | 6 | South | 1 | Item | Element | Material | % | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| E | 6 | South | 1 | Wall | Cover | Dash | A | 3 | |||||
| E | 6 | South | 1 | Wall | Doorways | Rendered | A | 3 | |||||
| E | 6 | South | 1 | Wall | Doors | UPVC | A | 3 | |||||
| E | 6 | South | 1 | Wall | RWP Downpipes | Aluminium | C | 3 | Oxidisation is evident below the powdered coated surface, and the surface is discoloured. Vegetation is growing in the gutters | ||||
| E | 6 | South | 1 | Wall | Fixings | Timber | C | 2 | Trellis | ||||
| E | 6 | South | 1 | Wall | Pathways | Slabs | C | 2 | Vegetation growth and some unevenness |
| E‐6 North 1 | Single Story Wall Elevation in Courtyard Includes staircase | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| E | 6 | North | 1 | Item | Element | Material | % | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| E | 6 | North | 1 | Wall | Cover | Dash | 80% | B | 3 | Cracking is visible where movement joints have not been installed all the way to DPC bell mold | |||
| E | 6 | North | 1 | Wall | Cover | Brick | 20% | C | 2 | Mortar pointing is deteriorating in places and voids provide ingress for weathering and water | |||
| E | 6 | North | 1 | Wall | Window Apertures | Rendered | C | 2 | There is corrosion to the lintel above some window openings | ||||
| E | 6 | North | 1 | Wall | Windows | Timber | D | 2 | Timber frames are starting to deteriorate | ||||
| E | 6 | North | 1 | Wall | Sills | Concrete | A | 3 | |||||
| E | 6 | North | 1 | Wall | Doorways | Rendered | B | 3 | One frame removed | ||||
| E | 6 | North | 1 | Wall | Doors | Timber | D | 2 | Timber Doors/frames are starting to deteriorate. Door to the Staircase/Bridge has been removed | ||||
| E | 6 | North | 1 | Wall | RWP Downpipes | Aluminium | C | 3 | Oxidisation is evident below the powdered coated surface, and the surface is discoloured | ||||
| E | 6 | North | 1 | Wall | Parapets | Brick | C | 2 | Mortar pointing is deteriorating in places and voids provide ingress for weathering and water | ||||
| E | 6 | North | 1 | Wall | Penetrations | Services | C | 3 | Penetrations have not been sealed around | ||||
| E | 6 | North | 1 | Wall | Pathways | Slabs | D | 2 | Considerable vegetation growth, uneven surface | ||||
| E | 6 | North | 1 | Wall | Staircase/Bridge | Aluminium | A | 2 |
| E‐6 Roof 1 | Flat Roof abutting B‐1, E‐5, E‐2, H‐1 | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| E | 6 | Roof | 1 | Item | Element | Material | % | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| E | 6 | Roof | 1 | Roof | Cover | Mineral Felt | C | 2 | Detritus and lichen is present in areas | ||||
| E | 6 | Roof | 1 | Roof | Eaves/Fascia | Timber | B | 2 | Paint has started delaminated | ||||
| E | 6 | Roof | 1 | Roof | Soffit | Soffit Brd | C | 2 | Paint is delaminating from the boards | ||||
| E | 6 | Roof | 1 | Roof | RWP Guttering | Aluminium | C | 2 | Oxidisation is evident below the powdered coated surface, and the surface is discoloured | ||||
| E | 6 | Roof | 1 | Roof | Flashing | Lead | C | 2 | Deterioration of the lead flashing is visible | ||||
| E | 6 | Roof | 1 | Roof | Parapets | Brick | C | 2 | Mortar pointing is deteriorating in places and voids provide ingress for weathering and water | ||||
| E | 6 | Roof | 1 | Roof | Roof Lights | Metal | A | 3 | Wear and tear | ||||
| E | 6 | Roof | 1 | Roof | Capping | Concrete | A | 3 | (Around the steps) | ||||
| E | 6 | Roof | 1 | Roof | Penetrations | Proprietary | A | 3 | Vent cowls |
| F‐1 South 1 | Single Story Wall Elevation | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| F | 1 | South | 1 | Item | Element | Material | % | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| F | 1 | South | 1 | Wall | Brick | C | 3 | Local areas of pointing have deteriorated, including directly above the lintels | |||||
| F | 1 | South | 1 | Wall | Windows | UPVC | C | 3 | Seals have started to breakdown around the casements in places | ||||
| F | 1 | South | 1 | Wall | Windows | UPVC | C | 3 | Lichen has started to grow on some frames where mastic sealant has broken down, and frame seal is incomplete | ||||
| F | 1 | South | 1 | Wall | Windows | UPVC | C | 3 | Light corrosion has started to the lintels | ||||
| F | 1 | South | 1 | Wall | Sills | Brick | B | 3 | some pointing is failing locally | ||||
| F | 1 | South | 1 | Wall | RWP Downpipes | Plastic | C | 3 | Different coloured plastic parts have been used to affect repairs | ||||
| F | 1 | South | 1 | Wall | RWP Downpipes | Plastic | C | 3 | Non‐stainless steel fixings are corroding and brackets are broken and missing in places | ||||
| F | 1 | South | 1 | Wall | Fixings | Metal | D | 1 | Light fittings are heavily corroded and damaged | ||||
| F | 1 | South | 1 | Wall | Pathways | Concrete | B | 3 | Wear and tear |
| F‐1 East 1 | Single Story Wall Elevation | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| F | 1 | East | 1 | Item | Element | Material | % | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| F | 1 | East | 1 | Wall | Cover | Brick | C | 3 | Local areas of pointing have deteriorated, including directly above the lintels | ||||
| F | 1 | East | 1 | Wall | Windows | UPVC | C | 2 | Seals have started to breakdown around the casements in places | ||||
| F | 1 | East | 1 | Wall | Windows | UPVC | C | 2 | Lichen has started to grow on some frames where mastic sealant has broken down, and frame seal is incomplete | ||||
| F | 1 | East | 1 | Wall | Windows | UPVC | C | 2 | Light corrosion has started to the lintels | ||||
| F | 1 | East | 1 | Wall | Windows | UPVC | C | 2 | End cap missing from the plastic sub‐sill | ||||
| F | 1 | East | 1 | Wall | Sills | Brick | C | 2 | Pointing has failed between sill bricks in places | ||||
| F | 1 | East | 1 | Wall | Doorways | Brick | C | 3 | Mastic has debonded around the doorframe | Yes | |||
| F | 1 | East | 1 | Wall | Doorways | Brick | C | 2 | Light corrosion has started to the lintels | ||||
| F | 1 | East | 1 | Wall | Doors | UPVC | A | 2 | |||||
| Wall | RWP Downpipes | Plastic | C | 2 | Different coloured plastic parts have been used to affect repairs | ||||||||
| F | 1 | East | 1 | Wall | RWP Downpipes | Plastic | C | 1 | Pipe connection to gutter has hailed in locations | Yes | |||
| F | 1 | East | 1 | Wall | RWP Downpipes | Plastic | C | 2 | Non‐stainless steel fixings are corroding | ||||
| F | 1 | East | 1 | Wall | Fixings | Metal | D | 1 | Light fittings are heavily corroded and damaged | ||||
| F | 1 | East | 1 | Wall | Fixings | Plastic | B | 3 | (Bulkhead lights) | ||||
| F | 1 | East | 1 | Wall | Pathways | Concrete | B |
| F‐1 North 1 | Single Story Wall Elevation | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| F | 1 | North | 1 | Item | Element | Material | % | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| F | 1 | North | 1 | Wall | Brick | C | 3 | Local areas of pointing have deteriorated, including directly above the lintels | |||||
| F | 1 | North | 1 | Wall | Windows | UPVC | C | 2 | Seals have started to breakdown around the casements in places | ||||
| F | 1 | North | 1 | Wall | Windows | UPVC | C | 2 | Lichen has started to grow on some frames where mastic sealant has broken down, and frame seal is incomplete | ||||
| F | 1 | North | 1 | Wall | Windows | UPVC | C | 2 | Light corrosion has started to the lintels | ||||
| F | 1 | North | 1 | Wall | Sills | Brick | B | 2 | pointing has started to deteriorate | ||||
| F | 1 | North | 1 | Wall | RWP Downpipes | Plastic | C | 2 | Different coloured plastic parts have been used to affect repairs | ||||
| F | 1 | North | 1 | Wall | RWP Downpipes | Plastic | C | 2 | Non‐stainless steel fixings are corroding | ||||
| F | 1 | North | 1 | Wall | Fixings | Metal | D | 1 | Light fittings are heavily corroded and damaged | ||||
| F | 1 | North | 1 | Wall | Pathways | Concrete | B | 3 | Wear and tear |
| F‐1 West 1 | Single Story Wall Elevation | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| F | 1 | West | 1 | Item | Element | Material | % | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| F | 1 | West | 1 | Wall | Brick | C | 3 | Local areas of pointing have deteriorated, including directly above the lintels | |||||
| F | 1 | West | 1 | Wall | Windows | UPVC | C | 2 | Seals have started to breakdown around the casements in places | ||||
| F | 1 | West | 1 | Wall | Windows | UPVC | C | 2 | Lichen has started to grow on some frames where mastic sealant has broken down | ||||
| F | 1 | West | 1 | Wall | Sills | Brick | C | 3 | Chipped brick on sill and some breakdown of the pointing locally | ||||
| F | 1 | West | 1 | Wall | Doorways | Brick | C | 3 | Light corrosion has started to the lintels | ||||
| F | 1 | West | 1 | Wall | Doorways | Brick | C | 3 | Mastic has debonded around the doorframe | Yes | |||
| F | 1 | West | 1 | Wall | Doors | Plastic | C | 2 | Pitting on the door furniture | ||||
| F | 1 | West | 1 | Wall | RWP Downpipes | Plastic | B | 3 | Lichen and staining is evident | ||||
| F | 1 | West | 1 | Wall | RWP Downpipes | Plastic | C | 2 | Non‐stainless steel fixings are corroding | ||||
| F | 1 | West | 1 | Wall | Fixings | Metal | D | 1 | Light fittings are heavily corroded and damaged | ||||
| F | 1 | West | 1 | Wall | Fixings | Plastic | B | 2 | (Bulkhead lights) | ||||
| F | 1 | West | 1 | Wall | Pathways | Slabs | B | 3 |
| F‐1 West 2 | Single Story Wall Elevation | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| F | 1 | West | 2 | Item | Element | Material | % | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| F | 1 | West | 2 | Wall | Brick | C | 3 | Local areas of pointing have deteriorated, including directly above the lintels | |||||
| F | 1 | West | 2 | Wall | Windows | UPVC | B | 2 | Seals have started to shrink back around the glazing | ||||
| F | 1 | West | 2 | Wall | Windows | UPVC | C | 3 | Mastic has failed around the frame and lichen growth is evident | ||||
| F | 1 | West | 2 | Wall | Sills | Brick | C | 3 | Chipped brick on sill and some breakdown of the pointing locally | ||||
| F | 1 | West | 2 | Wall | Doors | Plastic | C | 3 | Pitting on the door furniture | ||||
| F | 1 | West | 2 | Wall | RWP Downpipes | Plastic | B | 2 | Lichen and staining is evident | ||||
| F | 1 | West | 2 | Wall | RWP Downpipes | Plastic | C | 3 | Non‐stainless steel fixings are corroding | ||||
| F | 1 | West | 2 | Wall | Fixings | Metal | D | 1 | Light fittings are heavily corroded and damaged | ||||
| F | 1 | West | 2 | Wall | Fixings | Plastic | B | 2 | (Bulkhead lights) | ||||
| F | 1 | West | 2 | Wall | Pathways | Slabs | B | 3 | Wear and tear |
| F‐1 Roof 1 | Pitched Roof abutting Valley connection to K‐2 | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| F | 1 | Roof | 2 | Item | Element | Material | % | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| F | 1 | Roof | 2 | Roof | Cover | Concrete | B | 3 | |||||
| F | 1 | Roof | 2 | Roof | Ridge | Concrete | B | 3 | |||||
| F | 1 | Roof | 2 | Roof | Hip | Concrete | B | 3 | |||||
| F | 1 | Roof | 2 | Roof | Valley | Lead | C | 3 | Vegetation is growing around the valley interface with F‐2 Roof 1 | ||||
| F | 1 | Roof | 2 | Roof | Eaves/Fascia | UPVC | C | 3 | Joint strips missing, | ||||
| F | 1 | Roof | 2 | Roof | Soffit | Soffit Brd | C | 3 | Lichen growth is significant to the soffit is places | ||||
| F | 1 | Roof | 2 | Roof | Barge Board | UPVC | C | 3 | |||||
| F | 1 | Roof | 2 | Roof | RWP Guttering | Plastic | C | 2 | Non stainless steel fixings are corroding, | ||||
| F | 1 | Roof | 2 | Roof | RWP Guttering | Plastic | C | 1 | Brackets are missing and connections are working loose in places | Yes | |||
| F | 1 | Roof | 2 | Roof | Verge | Cement | C | 2 | Verge mortar is cracking and some verge clip has bent | ||||
| F | 1 | Roof | 2 | Roof | Penetrations | Plastic | B | 2 |
| F‐2 South 1 | Single Story Wall Elevation partly above K‐1 | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| F | 2 | South | 1 | Item | Element | Material | % | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| F | 2 | South | 1 | Wall | Windows | Aluminium | A | 3 | |||||
| F | 2 | South | 1 | Wall | Sills | Brick | C | 3 | Local areas of pointing have deteriorated, including directly above the lintels | ||||
| F | 2 | South | 1 | Wall | Doorways | Brick | C | 3 | Light corrosion has started to the lintels | ||||
| F | 2 | South | 1 | Wall | Doors | Metal | C | 2 | Mechanical damage to the frame, seals are broken locally | ||||
| F | 2 | South | 1 | Wall | Doors | Metal | C | 2 | Pitting to the door furniture | ||||
| F | 2 | South | 1 | Wall | RWP Downpipes | Plastic | C | 2 | Combination of coloured fittings have been used to affect repairs | ||||
| F | 2 | South | 1 | Wall | RWP Downpipes | Plastic | C | 2 | Brackets are broken and missing | ||||
| F | 2 | South | 1 | Wall | RWP Downpipes | Plastic | C | 2 | Non‐stainless steel fixings are corroding | ||||
| F | 2 | South | 1 | Wall | Pathways | Macadam | B | 3 | Wear and tear | ||||
| F | 2 | South | 1 | Wall | Pathways | Slabs | B | 3 | Wear and tear |
| F‐2 North 1 | Single Story Wall Elevation partly above K‐1 | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| F | 2 | North | 1 | Item | Element | Material | % | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| F | 2 | North | 1 | Wall | Windows | Aluminium | A | 3 | |||||
| F | 2 | North | 1 | Wall | Sills | Brick | C | 3 | Local areas of pointing have deteriorated, including directly above the lintels | ||||
| F | 2 | North | 1 | Wall | Doorways | Brick | C | 3 | Corrosion has started to the lintels | ||||
| F | 2 | North | 1 | Wall | Doors | Metal | C | 2 | Heavy pitting on the furniture, and corrosion on the Hinges | ||||
| F | 2 | North | 1 | Wall | RWP Downpipes | Plastic | C | 2 | Combination of coloured fittings have been used to affect repairs | ||||
| F | 2 | North | 1 | Wall | RWP Downpipes | Plastic | C | 2 | Brackets are broken and missing | ||||
| F | 2 | North | 1 | Wall | RWP Downpipes | Plastic | C | 2 | Non‐stainless steel fixings are corroding | ||||
| F | 2 | North | 1 | Wall | Pathways | Macadam | B | 3 | |||||
| F | 2 | North | 1 | Wall | Pathways | Slabs | B | 3 |
| F‐2 West 1 | Rooftop Wall Elevation (Small parapet ) above F‐2 Roof (also C‐3 East 1) | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| F | 2 | West | 1 | Item | Element | Material | % | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| F | 2 | West | 1 | Wall | Cover | Brick | C | 2 | Mortar pointing is deteriorating in places and voids provide ingress for weathering and water | ||||
| F | 2 | West | 1 | Wall | Capping | Concrete | A | 3 | |||||
| F | 2 | West | 1 | Wall | Flashing | Lead | A | 3 |
| F‐2 Roof 1 | Pitched Roof partly abutting C‐1 & C‐2 | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| F | 2 | Roof | 1 | Item | Element | Material | % | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| F | 2 | Roof | 1 | Roof | Cover | Concrete | B | 3 | Repairs have been undertaken to concrete tiles | ||||
| F | 2 | Roof | 1 | Roof | Ridge | Concrete | A | 3 | |||||
| F | 2 | Roof | 1 | Roof | Valley | Lead | C | 2 | Vegetation is growing around the valley interface with F‐1 Roof 1 | ||||
| F | 2 | Roof | 1 | Roof | Eaves/Fascia | UPVC | A | 3 | |||||
| F | 2 | Roof | 1 | Roof | Soffit | Soffit Brd | A | 3 | |||||
| F | 2 | Roof | 1 | Roof | RWP Guttering | Plastic | C | 3 | Combination of coloured fittings have been used to affect repairs | ||||
| F | 2 | Roof | 1 | Roof | RWP Guttering | Plastic | C | 3 | Brackets are broken and missing | ||||
| F | 2 | Roof | 1 | Roof | RWP Guttering | Plastic | C | 3 | Non‐stainless steel fixings are corroding | ||||
| F | 2 | Roof | 1 | Roof | Bottom abutment | GRP | B | 3 | (GRP box gutter below C‐1 North & C‐2 South) |
| G‐1 South 1 | Single Story Wall Elevation Gable End | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| G | 1 | South | 1 | Item | Element | Material | % | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| G | 1 | South | 1 | Wall | Cover | Rendered | D | 1 | Crazing widespread to render, with local areas of de‐bonding | ||||
| G | 1 | South | 1 | Wall | Pathways | Macadam | B | 3 | Wear and tear | ||||
| G | 1 | South | 1 | Wall | Penetrations | Metal | B | 2 | Wear and tear |
| G‐1 East 1 | Single Story Wall Elevation | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| G | 1 | East | 1 | Item | Element | Material | % | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| G | 1 | East | 1 | Wall | Rendered | D | 2 | Crazing and cracks to render, with local areas of de‐bonded and spalling. | |||||
| G | 1 | East | 1 | Wall | Rendered | D | 2 | Minor damage to corner beads and sections broken off at details | |||||
| G | 1 | East | 1 | Wall | Windows | UPVC | C | 3 | Seals around glazing units have mastic repairs. Some units are marked/soiled | ||||
| G | 1 | East | 1 | Wall | Sills | Concrete | A | 3 | |||||
| G | 1 | East | 1 | Wall | RWP Downpipes | Plastic | D | 2 | Broken and missing brackets on the down water pipes, non stainless steel fixing are corroding. Failed connections between guttering and down pipes. Blocked gullies | Yes | |||
| G | 1 | East | 1 | Wall | Pathways | Macadam | B | 3 | Wear and tear |
| G‐1 North 1 | Single Story Wall Elevation (Small) | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| G | 1 | North | 1 | Item | Element | Material | % | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| G | 1 | North | 1 | Wall | Rendered | D | 2 | Crazing and cracks to render, with local areas of de‐bonded and spalling | |||||
| G | 1 | North | 1 | Wall | Fixings | Metal | C | 2 | Corroding redundant fixing to be removed | ||||
| G | 1 | North | 1 | Wall | Pathways | Macadam | B | 3 | Wear and tear |
| G‐1 Roof 1 | Single Story Pitched Roof | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| G | 1 | Roof | 1 | Item | Element | Material | % | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| G | 1 | Roof | 1 | Roof | Cover | Metal | B | 2 | Aging metal cladding has corrosion widespread and (presumed 'Plastisol' coating) has started to delaminate from the lower roofline extending to 150mm upwards; some remedial works have been undertaken | Yes | |||
| G | 1 | Roof | 1 | Roof | Ridge | Metal | C | 2 | Aging metal cladding has corrosion widespread | Yes | |||
| G | 1 | Roof | 1 | Roof | Side Abutment | Metal | C | 2 | Render failed in one area above the flashing on the high level roof G‐2 South 1 | ||||
| G | 1 | Roof | 1 | Roof | Top Abutment | Lead | A | 2 | |||||
| G | 1 | Roof | 1 | Roof | Barge Board | Metal | B | 2 | Minor deformation in places | ||||
| G | 1 | Roof | 1 | Roof | Barge Board | Metal | B | 2 | Exposed softwood timber grounds | ||||
| G | 1 | Roof | 1 | Roof | Eaves/fascia | UPVC | B | 2 | End cap loose in one place , generally discolored | ||||
| G | 1 | Roof | 1 | Roof | RWP Guttering | Metal | B | 2 | Lichen and discoloration | ||||
| G | 1 | Roof | 1 | Roof | Penetrations | Proprietary | B | 2 | A/C cowl, fixings are heavily corroded |
| G‐2 South 1 | Rooftop Wall Elevation Gable End above G‐1 & G‐3 Roof | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| G | 2 | South | 1 | Item | Element | Material | % | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| G | 2 | South | 1 | Wall | Cover | Rendered | B | 2 | Numerous cracks to the walls, some larger than 3mm open | ||||
| G | 2 | South | 1 | Wall | Cover | Rendered | C | 1 | Render failed in one area above the flashing on the high level roof G‐1 Roof 1 | Yes | |||
| G | 2 | South | 1 | Wall | Cover | Rendered | B | 2 | Staining and discolouration to the unpainted wall | ||||
| G | 2 | South | 1 | Wall | Fixings | Metal | C | 2 | TV Aerial |
| G‐2 East 1 | Two Story Wall Elevation partly above G‐1 Roof | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| G | 2 | East | 1 | Item | Element | Material | % | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| G | 2 | East | 1 | Wall | Rendered | D | 2 | Numerous cracks to the walls, some larger than 3mm open | |||||
| G | 2 | East | 1 | Wall | Rendered | D | 2 | Reveal has completely delaminated above one window and render pieces are falling to the roof below | |||||
| G | 2 | East | 1 | Wall | Windows | UPVC | B | 2 | Wear and tear | ||||
| G | 2 | East | 1 | Wall | Sills | Concrete | B | Discolouration and some minor chipping | |||||
| G | 2 | East | 1 | Wall | Doorways | Rendered | C | 3 | Cracking and some delamination to the render adjacent to the doorway | ||||
| G | 2 | East | 1 | Wall | Doors | UPVC | B | 2 | Wear and tear | ||||
| G | 2 | East | 1 | Wall | RWP Downpipes | Metal | D | 2 | Brackets are damaged and or missing in several locations | ||||
| G | 2 | East | 1 | Wall | Pathways | C | 2 | Blocked gully | Yes |
| G‐2 North 1 | Two Story Wall Elevation Gable | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| G | 2 | North | 1 | Item | Element | Material | % | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| G | 2 | North | 1 | Wall | Rendered | C | 3 | Render damage to low level appears to be vehicle impact damage | |||||
| G | 2 | North | 1 | Wall | Rendered | C | 3 | Minor cracking to the wall in several places | |||||
| G | 2 | North | 1 | Wall | Rendered | C | 3 | Discolouration and some minor chipping |
| G‐2 West 1 | Two Story Wall Elevation partly above G‐4 Roof | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| G | 2 | West | 1 | Item | Element | Material | % | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| G | 2 | West | 1 | Wall | Cover | Rendered | D | 1 | Numerous cracks to the walls, some larger than 3mm and evident movement | ||||
| G | 2 | West | 1 | Wall | Window Apertures | Rendered | D | 1 | Reveal has completely delaminated above one window and render pieces are falling to the ground below | ||||
| G | 2 | West | 1 | Wall | Windows | UPVC | B | 2 | Wear and tear | ||||
| G | 2 | West | 1 | Wall | Sills | Concrete | B | 2 | Discolouration and some minor chipping | ||||
| G | 2 | West | 1 | Wall | Doorways | Rendered | C | 2 | Cracking and some delamination to the render adjacent to the doorway | ||||
| G | 2 | West | 1 | Wall | Doors | UPVC | B | 2 | Wear and tear | ||||
| G | 2 | West | 1 | Wall | RWP Downpipes | Metal | D | 1 | Brackets are damaged and or missing in several locations, and denting to pipes appears to be from vehicles | ||||
| G | 2 | West | 1 | Wall | Pathways | Macadam | C | 1 | Blocked gully | Yes |
| G‐2 Roof 1 | Pitched Roof | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| G | 2 | Roof | 1 | Item | Element | Material | % | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| G | 2 | Roof | 1 | Roof | Cover | Metal | B | 2 | Aging metal cladding has corrosion widespread and (presumed 'Plastisol' coating) has started to delaminate from the lower roofline extending to 100mm upwards | ||||
| G | 2 | Roof | 1 | Roof | Ridge | Metal | C | 2 | Aging metal cladding has corrosion widespread | ||||
| G | 2 | Roof | 1 | Roof | Barge Board | Metal | B | 2 | Minor deformation in places | ||||
| G | 2 | Roof | 1 | Roof | Eaves/fascia | Metal | B | 2 | End cap loose in one place , generally discolored | ||||
| G | 2 | Roof | 1 | Roof | RWP Guttering | Metal | B | 2 | Lichen and discoloration | ||||
| G | 2 | Roof | 1 | Roof | Penetrations | Proprietary | B | 2 | A/C cowls have vegetation accumulating and fixings are corroded |
| G‐3 South 1 | Single Story Wall Elevation abutting G‐1 & P‐2 East 1 | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| G | 3 | South | 1 | Item | Element | Material | % | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| G | 3 | South | 1 | Wall | Cover | Cement | B | 3 | Corrosion visible to the render bead above the door and screen, and delamination cracks are starting to appear | ||||
| G | 3 | South | 1 | Wall | Doors | Metal | B | 2 | |||||
| G | 3 | South | 1 | Wall | Screens | Metal | B | 2 | |||||
| G | 3 | South | 1 | Wall | Fixings | Plastic | B | 2 | (Light fitting) | ||||
| G | 3 | South | 1 | Wall | Pathways | Concrete | B | 3 |
| G‐3 North 1 | Single Story Wall Elevation abutting G‐4 | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| G | 3 | North | 1 | Item | Element | Material | % | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| G | 3 | North | 1 | Wall | Cover | Rendered | C | 3 | Crack above the window in excess of 3mm and to the render band above. Remedial works are evident in the unpainted render finish | ||||
| G | 3 | North | 1 | Wall | Cover | Rendered | C | 3 | Small section of render broken off on corner at ground level | ||||
| G | 3 | North | 1 | Wall | Windows | UPVC | B | 2 | |||||
| G | 3 | North | 1 | Wall | Sills | Concrete | B |
| G‐3 West 1 | Single Story Wall Elevation abutting P‐2 | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| G | 3 | West | 1 | Item | Element | Material | % | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| G | 3 | West | 1 | Wall | Rendered | C | 2 | Numerous cracks to the render, mainly above windows. Lichen growth locally | |||||
| G | 3 | West | 1 | Wall | Windows | Aluminium | B | 2 | |||||
| G | 3 | West | 1 | Wall | Sills | Concrete | B | 2 | Render has started to break away at the ends of the reveals/sills | ||||
| G | 3 | West | 1 | Wall | Doorways | Rendered | C | 2 | Galvanised lintel above openings are starting to corrode | ||||
| G | 3 | West | 1 | Wall | Doorways | Rendered | C | 2 | Mastic has debonded around the frame installation, moss growing at the threshold | Yes | |||
| G | 3 | West | 1 | Wall | Doors | Metal | B | 2 | |||||
| G | 3 | West | 1 | Wall | RWP Downpipes | Plastic | C | 2 | Non‐stainless steel fixings are corroding on the gutter brackets | ||||
| G | 3 | West | 1 | Wall | Fixings | Plastic | B | 1 | Light fitting is old | Yes | |||
| G | 3 | West | 1 | Wall | Pathways | B | 3 | Combination of macadam and poorly interfaced concrete looks unsightly |
| G‐3 Roof 1 | Roof abutting G‐1 Roof, G‐2, G‐4 Roof 1, P‐2 | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| G | 3 | Roof | 1 | Item | Element | Material | % | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| G | 3 | Roof | 1 | Roof | Cover | Mineral Felt | B | 3 | Lichen, debris and old materials laying on the roof | ||||
| G | 3 | Roof | 1 | Roof | Valley | Mineral Felt | C | 2 | Detritus and vegetation is starting to grow | Yes | |||
| G | 3 | Roof | 1 | Roof | Eaves/Fascia | UPVC | B | 2 | No end cap has been fitted to the fascia abutting G‐1 South 1 | ||||
| G | 3 | Roof | 1 | Roof | Eaves/Fascia | GRP | B | 2 | Exposed plywood overhang is evident by G‐1 South 1 above the doorway | ||||
| G | 3 | Roof | 1 | Roof | Soffit | Soffit Brd | B | 2 | Corrosion is evident to the soffit fixings | ||||
| G | 3 | Roof | 1 | Roof | Flashing | C | 3 | Flashings have been poorly finished to the barge board abutment to G‐1 South 1 above the doorway RHS | |||||
| G | 3 | Roof | 1 | Roof | Flashing | B | 2 | Wear and tear | |||||
| G | 3 | Roof | 1 | Roof | RWP Hopper | Metal | B | 3 | Wear and tear | ||||
| G | 3 | Roof | 1 | Roof | Roof Lights | Proprietary | B | 3 | Wear and tear |
| G‐4 North 1 | Single Story Wall Elevation (Small) | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| G | 4 | North | 1 | Item | Element | Material | % | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| G | 4 | North | 1 | Wall | Cover | Rendered | C | 3 | Numerous cracks to the render emanating from the window aperture generally | ||||
| G | 4 | North | 1 | Wall | Windows | UPVC | A | 3 | |||||
| G | 4 | North | 1 | Wall | Sills | Concrete | A | 3 | |||||
| G | 4 | North | 1 | Wall | Pathways | Macadam | B | 3 | Wear and tear |
| G‐4 West 1 | Single Story Wall Elevation abutting P‐2 | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| G | 4 | West | 1 | Item | Element | Material | % | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| G | 4 | West | 1 | Wall | Cover | Rendered | C | 3 | Cracking in a few places, render from replacement window fitting is starting to de‐bond at some of the reveal locations | ||||
| G | 4 | West | 1 | Wall | Cover | Rendered | C | 3 | There are a couple of redundant metal fixings that are heavily corroded | ||||
| G | 4 | West | 1 | Wall | Windows | Aluminium | A | 3 |
| G‐4 Roof 1 | Roof abutting G‐3 & G‐2 | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| G | 4 | Roof | 1 | Item | Element | Material | % | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| G | 4 | Roof | 1 | Roof | Cover | Mineral Felt | A | 3 | |||||
| G | 4 | Roof | 1 | Roof | Eaves/fascia | UPVC | A | 3 | |||||
| G | 4 | Roof | 1 | Roof | Soffit | Cement Brd | B | 2 | Showing signs of age, with some sections of sealant debonded in places | ||||
| G | 4 | Roof | 1 | Roof | RWP Guttering | Plastic | B | 2 | Lichen present vegetation growing in the guttering | Yes | |||
| G | 4 | Roof | 1 | Roof | RWP Guttering | Plastic | B | 2 | Non‐stainless steel fixings are corroding and bracket missing | ||||
| G | 4 | Roof | 1 | Roof | Flashing | Lead | A | 3 |
| H‐1 South 1 | Single Story Wall Elevation abutting H‐2 & H‐3 | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| H | 1 | South | 1 | Item | Element | Material | % | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| H | 1 | South | 1 | Wall | Cover | Dash | 90% | C | 3 | Numerous cracks to the dash coating and render band at DPC | |||
| H | 1 | South | 1 | Wall | Cover | Brick | 10% | C | 3 | Local sections of pointing is breaking down | |||
| H | 1 | South | 1 | Wall | Window Apertures | Rendered | C | 2 | Softwood is exposed to the weather under the fascia and is deteriorating | ||||
| H | 1 | South | 1 | Wall | Windows | UPVC | A | 3 | |||||
| H | 1 | South | 1 | Wall | Sills | Concrete | A | 3 | |||||
| H | 1 | South | 1 | Wall | Doorways | Brick | C | 1 | Local sections of pointing is breaking down. The lintel over the doorway (South side) has cracked and corrosion is visible along the full width of the opening | Yes | |||
| H | 1 | South | 1 | Wall | Doors | Aluminium | A | 3 | |||||
| H | 1 | South | 1 | Wall | RWP Downpipes | Aluminium | C | 2 | Oxidisation is evident below the powdered coated surface, and the surface is discoloured. | ||||
| H | 1 | South | 1 | Wall | Fixings | Metal | C | 2 | Redundant metal fixings are corroding into the wall | ||||
| H | 1 | South | 1 | Wall | Penetrations | Services | C | 1 | Service pipes need to be sealed around | Yes | |||
| H | 1 | South | 1 | Wall | Pathways | Macadam | B | 3 | Wear and tear |
| H‐1 East 1 | Rooftop Wall Elevation above C‐3 & C‐4 | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| H | 1 | East | 1 | Item | Element | Material | % | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| H | 1 | East | 1 | Wall | Cover | Dash | A | 3 | |||||
| H | 1 | East | 1 | Wall | Fixings | Plastic | C | 3 | Fixings not secured on conduit |
| H‐1 North 1 | Single Story Wall Elevation abutting A‐6 | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| H | 1 | North | 1 | Item | Element | Material | % | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| H | 1 | North | 1 | Wall | Cover | Dash | C | 2 | Cracks to reveals and face in a few places. A Couple of areas of spalling to the low level render band | ||||
| H | 1 | North | 1 | Wall | Windows | UPVC | A | 2 | |||||
| H | 1 | North | 1 | Wall | Screens | Timber | C | 2 | Painted softwood shiplap timbers have delaminated paint and are starting to deteriorate | ||||
| H | 1 | North | 1 | Wall | Screens | UPVC | C | 1 | Casement mechanisms are not closing the seals on some of the units | ||||
| H | 1 | North | 1 | Wall | Screens | UPVC | C | 2 | Cracking has occurred around the perimeter of the frames, there is no mastic sealant applied | ||||
| H | 1 | North | 1 | Wall | Sills | Concrete | A | 3 | |||||
| H | 1 | North | 1 | Wall | Doorways | Rendered | C | 2 | Cracking has occurred around the perimeter of the frame, there is no mastic sealant applied | ||||
| H | 1 | North | 1 | Wall | Doors | Timber | B | 2 | Wear and tear | ||||
| H | 1 | North | 1 | Wall | Doors | UPVC | B | 2 | Wear and tear | ||||
| H | 1 | North | 1 | Wall | RWP Downpipes | Metal | C | 2 | Corrosion is evident to al the downpipes and their fixings. | ||||
| H | 1 | North | 1 | Wall | RWP Downpipes | UPVC | C | 2 | PVC pipes have been used to affect remedial works, fixings are corroding | ||||
| H | 1 | North | 1 | Wall | Parapets | GRP | A | 3 | |||||
| H | 1 | North | 1 | Wall | Penetrations | Services | C | 1 | Waste water pipes have expending foam filler over spilling and have not been sealed | Yes | |||
| H | 1 | North | 1 | Wall | Fixings | Proprietary | B | 2 | Light fittings | ||||
| H | 1 | North | 1 | Wall | Pathways | Concrete | B | 3 | Wear and tear | ||||
| H | 1 | North | 1 | Wall | Pathways | Macadam | B | 3 | Wear and tear |
| H‐1 West 1 | Single Story Wall Elevation in Courtyard | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| H | 1 | West | 1 | Item | Element | Material | % | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| H | 1 | West | 1 | Wall | Cover | Rendered | 40% | A | 3 | ||||
| H | 1 | West | 1 | Wall | Cover | Brick | 60% | A | 3 | ||||
| H | 1 | West | 1 | Wall | Window Apertures | Cement | C | 2 | Corrosion is visible above one of the window openings | ||||
| H | 1 | West | 1 | Wall | Windows | UPVC | A | 3 | |||||
| H | 1 | West | 1 | Wall | Sills | Concrete | A | 3 | |||||
| H | 1 | West | 1 | Wall | RWP Downpipes | Aluminium | C | 3 | Oxidisation is evident below the powdered coated surface, and the surface is discoloured. | ||||
| H | 1 | West | 1 | Wall | Penetrations | Services | A | 3 |
| H‐1 Roof 1 | Flat Roof abutting E‐2, E‐6 & A‐6 | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| H | 1 | Roof | 1 | Item | Element | Material | % | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| H | 1 | Roof | 1 | Roof | Cover | Mineral Felt | B | 2 | Detritus and vegetation is present. Numerous patch repairs undertaken, appearing to be roof lights removed and general repairs | ||||
| H | 1 | Roof | 1 | Roof | Eaves/Fascia | Timber | D | 1 | Small section of fascia has been completely displaced (by A‐ 6), exposing the timber grounds, rot is evident which will likely be extending into the roof and parapet construction adjacent | ||||
| H | 1 | Roof | 1 | Roof | Eaves/Fascia | Timber | C | 2 | Exposed softwood timber grounds are exposed to the atmosphere and deterioration is evident | ||||
| H | 1 | Roof | 1 | Roof | Eaves/Fascia | Timber | C | 2 | Lichen growth and discoloration is evident to sections of fascia | ||||
| H | 1 | Roof | 1 | Roof | RWP Hopper | Metal | C | 3 | Lead outlets are not aligned nor well dressed to the cast iron outlets (South side) | ||||
| H | 1 | Roof | 1 | Roof | Parapets | Mineral Felt | B | 2 | GRP trims | ||||
| H | 1 | Roof | 1 | Roof | Flashing | Lead | C | 2 | Lead flashings have started to lift along the abutment with A‐ 6 | ||||
| H | 1 | Roof | 1 | Roof | Flashing | Mineral Felt | C | 2 | Flashings have been formed against the timber fascia board for a section of E‐2 roof | ||||
| H | 1 | Roof | 1 | Roof | Penetrations | Services | B | 2 | Accessed in line with the roof cover | ||||
| H | 1 | Roof | 1 | Roof | Roof Lights | Metal | B | 3 | Repairs have been undertaken around installations | ||||
| H | 1 | Roof | 1 | Roof | RWP Guttering | Mineral Felt | B | 2 | Accessed in line with the roof cover |
| H‐2 South 1 | Single Story 3 Wall Elevations abutting H‐1 | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| H | 2 | South | 1 | Item | Element | Material | % | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| H | 2 | South | 1 | Wall | Cover | Brick | C | 2 | There are local area of pointing that have broken out and bricks locally displaced | ||||
| H | 2 | South | 1 | Wall | RWP Downpipes | Aluminium | C | 3 | Oxidisation is evident below the powdered coated surface, and the surface is discoloured. | ||||
| H | 2 | South | 1 | Wall | Fixings | Metal | C | 3 | There are a number of redundant fixing and holes that need to be removed and sealed | ||||
| H | 2 | South | 1 | Wall | Pathways | Concrete | B | 2 | Wear and tear |
| H‐2 Roof 1 | Flat Roof abutting H‐1 | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| H | 2 | Roof | 1 | Item | Element | Material | % | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| H | 2 | Roof | 1 | Roof | Cover | Mineral Felt | C | 2 | Detritus | ||||
| H | 2 | Roof | 1 | Roof | Eaves/Fascia | Aluminium | B | 3 | Aluminium Trim | ||||
| H | 2 | Roof | 1 | Roof | Flashing | Lead | C | 2 | Discolouration and deterioration of the lead flashing is visible | ||||
| H | 2 | Roof | 1 | Roof | Parapets | Mineral Felt | D | 2 | Poor flashing installation at the top of the parapet |
| H‐3 South 1 | Single Story 2 Wall Elevations abutting E‐2 & H‐1 | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| H | 3 | South | 1 | Item | Element | Material | % | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| H | 3 | South | 1 | Wall | Cover | Dash | A | 3 | |||||
| H | 3 | South | 1 | Wall | Window Apertures | Rendered | A | 3 | |||||
| H | 3 | South | 1 | Wall | Windows | Aluminium | B | 2 | Minor oxidisation is present on the powder coating | ||||
| H | 3 | South | 1 | Wall | Sills | Concrete | A | 3 | |||||
| H | 3 | South | 1 | Wall | Doorways | Rendered | B | 3 | Minor hairline crack is visible | ||||
| H | 3 | South | 1 | Wall | Doors | Aluminium | B | 3 | Lichen is present on the seals | ||||
| H | 3 | South | 1 | Wall | Fixings | Metal | C | 3 | Fixings for the handrail are corroding | ||||
| H | 3 | South | 1 | Wall | Fixings | Proprietary | A | 3 | Light fitting | ||||
| H | 3 | South | 1 | Wall | RWP Downpipes | Aluminium | C | 3 | Oxidisation is evident below the powdered coated surface, and the surface is discoloured. Includes hopper | ||||
| H | 3 | South | 1 | Wall | Parapets | Dash | A | 3 | |||||
| H | 3 | South | 1 | Wall | Capping | Concrete | C | 2 | Mortar joints have broken out on some of the parapet capping | ||||
| H | 3 | South | 1 | Wall | Ramps | Concrete | C | 1 | There is a 25mm trip hazard at the bottom of the ramp | ||||
| H | 3 | South | 1 | Wall | Pathways | Macadam | B | 3 | Wear and tear |
| H‐3 Roof 1 | Flat Roof abutting H‐1 & E‐2 | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| H | 3 | Roof | 1 | Item | Element | Material | % | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| H | 3 | Roof | 1 | Roof | Cover | Mineral Felt | A | 2 | |||||
| H | 3 | Roof | 1 | Roof | Flashing | Lead | A | 2 |
| J‐1 East 1 | Single Story Wall Elevation partly above K‐3 | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| J | 1 | East | 1 | Item | Element | Material | % | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| J | 1 | East | 1 | Wall | Cover | Dash | C | 2 | Dash is old and has lost the chipping face, cracks are widespread | ||||
| J | 1 | East | 1 | Wall | Window Apertures | Rendered | C | 2 | Cracks are evident | ||||
| J | 1 | East | 1 | Wall | Windows | Timber | D | 1 | Frames are deteriorating and starting to rot | ||||
| J | 1 | East | 1 | Wall | Sills | Timber | D | 1 | Frames are deteriorating and starting to rot | ||||
| J | 1 | East | 1 | Wall | RWP Downpipes | Aluminium | C | 3 | Oxidisation is evident below the powdered coated surface, and the surface is discoloured | ||||
| J | 1 | East | 1 | Wall | Penetrations | Services | A | 2 | |||||
| J | 1 | East | 1 | Wall | Fixings | Proprietary | B | 2 | CCTV |
| J‐1 North 1 | Single Story Wall Elevation | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| J | 1 | North | 1 | Item | Element | Material | % | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| J | 1 | North | 1 | Wall | Cover | Dash | C | 2 | Dash is old and has lost chippings and one section has debonded and broken off and the bottom of the bell cast molding is chipped | ||||
| J | 1 | North | 1 | Wall | Cover | Dash | C | 2 | Numerous redundant holes and fixing points have not been sealed | ||||
| J | 1 | North | 1 | Wall | Window Apertures | Concrete | A | 3 | |||||
| J | 1 | North | 1 | Wall | Windows | UPVC | A | 2 | |||||
| J | 1 | North | 1 | Wall | Sills | Concrete | C | 3 | Cracks have resulted with an opening between the sill units | ||||
| J | 1 | North | 1 | Wall | RWP Downpipes | Plastic | B | 2 | |||||
| J | 1 | North | 1 | Wall | Penetrations | Metal | C | 3 | Discolouration, damage and corrosion to grille covers | ||||
| J | 1 | North | 1 | Wall | Fixings | Services | A | 2 | |||||
| J | 1 | North | 1 | Wall | Pathways | Macadam | B | 2 | Wear and tear |
| J‐1 West 1 | Single Story Wall Elevation | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| J | 1 | West | 1 | Item | Element | Material | % | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| J | 1 | West | 1 | Wall | Cover | Dash | C | 2 | Dash is old and has lost chippings and the bottom of the bell cast molding is chipped | ||||
| J | 1 | West | 1 | Wall | Cover | Dash | C | 2 | Numerous redundant holes and fixing points have not been sealed | ||||
| J | 1 | West | 1 | Wall | Window Apertures | Concrete | B | 3 | Wear and tear | ||||
| J | 1 | West | 1 | Wall | Windows | UPVC | C | 2 | Mastic sealant is pulling away from the frames or reveals in places | ||||
| J | 1 | West | 1 | Wall | Sills | Concrete | C | 3 | Cracks have resulted with an opening between the sill units | ||||
| J | 1 | West | 1 | Wall | RWP Downpipes | Plastic | B | 2 | Wear and tear | ||||
| J | 1 | West | 1 | Wall | Penetrations | Services | C | 2 | Holes around the waste pipes have not been sealed, expanding foam is exposed | ||||
| J | 1 | West | 1 | Wall | Fixings | Services | B | 2 | Gas supply pipe | ||||
| J | 1 | West | 1 | Wall | Pathways | Macadam | C | 3 | Surface has sunk local to drainage and services |
| J‐1 Roof 1 | Flat Roof abutting K‐1, J‐2, connected to D‐4 & K‐2 | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| J | 1 | Roof | 1 | Item | Element | Material | % | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| J | 1 | Roof | 1 | Roof | Cover | Mineral Felt | C | 2 | Repairs have been undertaken to the junction between the GRP and Mineral felt. Grasses and vegetation is growing | ||||
| J | 1 | Roof | 1 | Roof | Cover | GRP | C | 2 | Repairs have been undertaken to the junction between the GRP and Mineral felt | ||||
| J | 1 | Roof | 1 | Roof | Eaves/Fascia | Timber | B | 2 | Wear and tear | ||||
| J | 1 | Roof | 1 | Roof | Soffit | Concrete | B | 3 | Wear and tear | ||||
| J | 1 | Roof | 1 | Roof | RWP Guttering | Aluminium | C | 3 | Oxidisation is evident below the powdered coated surface, and the surface is discoloured | ||||
| J | 1 | Roof | 1 | Roof | Roof Lights | Metal | A | 2 |
| J‐2 South 1 | Rooftop Wall Elevation above J‐3 | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| J | 2 | South | 1 | Item | Element | Material | % | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| J | 2 | South | 1 | Wall | Cover | Dash | C | 2 | Widespread loss of chippings, cracks are visible and repairs have been undertaken to the wall above the flashings above J‐ 3 roof |
| J‐2 North 1 | Rooftop Wall Elevation above J‐1 | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| J | 2 | North | 1 | Item | Element | Material | % | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| J | 2 | North | 1 | Wall | Cover | Rendered | B | 3 |
| J‐2 West 1 | Rooftop Wall Elevation above D‐4 | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| J | 2 | West | 1 | Item | Element | Material | % | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| J | 2 | West | 1 | Wall | Cover | Dash | 40% | C | 2 | Dash is delaminating and breaking off | |||
| J | 2 | West | 1 | Wall | Cover | Rendered | 60% | C | 2 | Render is rough and repairs have been undertaken | |||
| J | 2 | West | 1 | Wall | RWP Downpipes | Metal | D | 2 | Iron downpipes are corroded |
| J‐2 Roof 1 | Flat Roof abutting K‐1 | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| J | 2 | Roof | 1 | Item | Element | Material | % | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| J | 2 | Roof | 1 | Roof | Cover | Mineral Felt | B | 2 | Vegetation is growing over the material | ||||
| J | 2 | Roof | 1 | Roof | Eaves/Fascia | Concrete | C | 2 | Damaged/crack/spalling in places, reduced concrete cover to reinforcement | ||||
| J | 2 | Roof | 1 | Roof | Soffit | Concrete | C | 2 | Damaged reduced concrete cover to reinforcement | ||||
| J | 2 | Roof | 1 | Roof | RWP Guttering | Mineral Felt | B | 2 | Vegetation is growing over the material | ||||
| J | 2 | Roof | 1 | Roof | Side Abutment | Copper | C | 2 | Flashings are damaged locally and are lifting | ||||
| J | 2 | Roof | 1 | Roof | Roof Lights | Metal | A | 2 |
| J‐3 West 1 | Single Story Wall Elevation in Courtyard | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| J | 3 | West | 1 | Item | Element | Material | % | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| J | 3 | West | 1 | Wall | Cover | Rendered | B | 3 | |||||
| J | 3 | West | 1 | Wall | Window Apertures | Concrete | D | 2 | Corrosion and spalling concrete to the lintels over the window openings have been painted | ||||
| J | 3 | West | 1 | Wall | Windows | UPVC | C | 2 | First signs of weld failure to one window noted | ||||
| J | 3 | West | 1 | Wall | Sills | Concrete | A | 3 | |||||
| J | 3 | West | 1 | Wall | Doorways | Concrete | A | 3 | |||||
| J | 3 | West | 1 | Wall | Screens | UPVC | C | 2 | First signs of weld failure to one window noted | ||||
| J | 3 | West | 1 | Wall | RWP Downpipes | Aluminium | C | 3 | Oxidisation is evident below the powdered coated surface, and the surface is discoloured | ||||
| J | 3 | West | 1 | Wall | Penetrations | Services | A | 3 | |||||
| J | 3 | West | 1 | Wall | Pathways | Gravel | A | 3 |
| J‐3 South 1 | Rooftop Wall Elevation above J‐4 | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| J | 3 | South | 1 | Item | Element | Material | % | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| J | 3 | South | 1 | Wall | Cover | Dash | B | 3 | Local repair undertaken above the corner flashing |
| J‐3 Roof 1 | Flat Roof abutting L‐1, J‐2 and part of D‐4 | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| J | 3 | Roof | 1 | Item | Element | Material | % | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| J | 3 | Roof | 1 | Roof | Cover | Mineral Felt | C | 2 | Standing water is present and repairs have been undertaken. Detritus and vegetation/lichen is present | ||||
| J | 3 | Roof | 1 | Roof | Eaves/Fascia | Concrete | B | 3 | |||||
| J | 3 | Roof | 1 | Roof | Soffit | Concrete | C | 3 | Corrosion, with some cracking and spalling has been painted over | ||||
| J | 3 | Roof | 1 | Roof | Soffit | Soffit Brd | C | 3 | Small broken section at one end | ||||
| J | 3 | Roof | 1 | Roof | Flashing | Mineral Felt | C | 2 | Standing water is present and repairs have been undertaken. Detritus and vegetation/lichen is present | ||||
| J | 3 | Roof | 1 | Roof | RWP Guttering | Aluminium | C | 3 | Oxidisation is evident below the powdered coated surface, and the surface is discoloured | ||||
| J | 3 | Roof | 1 | Roof | Roof Lights | Metal | B | 2 |
| J‐4 North 1 | Single Story Wall Elevation in Courtyard | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| J | 4 | North | 1 | Item | Element | Material | % | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| J | 4 | North | 1 | Wall | Cover | Brick | 10% | A | 3 | ||||
| J | 4 | North | 1 | Wall | Screens | UPVC | 90% | A | 3 | ||||
| J | 4 | North | 1 | Wall | Windows | UPVC | A | 3 | |||||
| J | 4 | North | 1 | Wall | Doorways | Brick | A | 3 | |||||
| J | 4 | North | 1 | Wall | Doors | Aluminium | A | 3 | |||||
| J | 4 | North | 1 | Wall | Pathways | Gravel | A | 3 | |||||
| J | 4 | North | 1 | Wall | Ramps | Concrete | A | 3 |
| J‐4 Roof 1 | Flat Roof abutting B‐1, B‐2 & M‐1 | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| J | 4 | Roof | 1 | Item | Element | Material | % | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| J | 4 | Roof | 1 | Roof | Cover | Mineral Felt | C | 2 | Detritus, lichen and moss growth present | ||||
| J | 4 | Roof | 1 | Roof | Eaves/Fascia | Concrete | D | 2 | Corrosion and spalling concrete to the lintels over the porch/doorway openings has been painted | ||||
| J | 4 | Roof | 1 | Roof | RWP Guttering | Aluminium | C | 3 | Oxidisation is evident below the powdered coated surface, and the surface is discoloured | ||||
| J | 4 | Roof | 1 | Roof | Flashing | Lead | 50% | B | 2 | Lead flashing lifting in places and some local damage, repairs undertaken | |||
| J | 4 | Roof | 1 | Roof | Flashing | Mineral Felt | 50% | C | 2 | Wear and tear | |||
| J | 4 | Roof | 1 | Roof | Roof Lights | Metal | B | 2 | Wear and tear | ||||
| J | 4 | Roof | 1 | Roof | Penetrations | Services | B | 2 | Wear and tear |
| K‐1 East 1 | Rooftop Wall Elevation above K‐4 | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| K | 1 | East | 1 | Item | Element | Material | % | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| K | 1 | East | 1 | Wall | Cover | Dash | C | 3 | Aggregate has substantially eroded from the surface | ||||
| K | 1 | East | 1 | Wall | Window Apertures | Concrete | A | 3 | |||||
| K | 1 | East | 1 | Wall | Windows | Timber | D | 1 | Window frames are unpainted, boarded over and rotting | ||||
| K | 1 | East | 1 | Wall | Sills | Concrete | A | 3 | |||||
| K | 1 | East | 1 | Wall | RWP Downpipes | Plastic | B | 3 | Wear and tear | ||||
| K | 1 | East | 1 | Wall | Fixings | Services | B | 3 | Drainage pipes |
| K‐1 North 1 | Rooftop Wall Elevation above K‐2 | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| K | 1 | North | 1 | Item | Element | Material | % | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| K | 1 | North | 1 | Wall | Cover | Rendered | B | 2 | Cracking is visible to the rendered walling, some repair works undertaken | ||||
| K | 1 | North | 1 | Wall | Window Apertures | Concrete | B | 2 | Spalling concrete in local areas | ||||
| K | 1 | North | 1 | Wall | Windows | Timber | D | 1 | Timber frames have lost their paint and are rotting | ||||
| K | 1 | North | 1 | Wall | Sills | Concrete | C | 2 | Cracking is some sills | ||||
| K | 1 | North | 1 | Wall | Screens | Timber | B | 3 | Wear and tear | ||||
| K | 1 | North | 1 | Wall | Fixings | Metal | C | 2 | TV Ariel |
| K‐1 West 1 | Rooftop Wall Elevation above J‐1 & J‐2 & J‐3 | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| K | 1 | West | 1 | Item | Element | Material | % | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| K | 1 | West | 1 | Wall | Cover | Dash | C | 2 | Dash has extensive loss of aggregate, repairs have been undertaken to section adjacent to J‐3 roof flashings. There are cracks visible, including horizontally below the concrete soffit | ||||
| K | 1 | West | 1 | Wall | RWP Downpipes | Plastic | B | 2 | Wear and tear |
| K‐1 Roof 1 | Flat Roof abutting L‐1 | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| K | 1 | Roof | 1 | Item | Element | Material | % | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| K | 1 | Roof | 1 | Roof | Cover | Mineral Felt | B | 2 | Standing water is present | ||||
| K | 1 | Roof | 1 | Roof | Eaves/Fascia | Concrete | A | 3 | |||||
| K | 1 | Roof | 1 | Roof | Soffit | Concrete | C | 2 | Corrosion and spalling concrete in local areas, mainly one section on the north elevation, but small sections East and West | ||||
| K | 1 | Roof | 1 | Roof | RWP Guttering | Mineral Felt | B | 2 | Vegetation is growing in the channel guttering | ||||
| K | 1 | Roof | 1 | Roof | Flashing | Metal | A | 3 |
| K‐2 East 1 | Single Story Wall Elevation | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| K | 2 | East | 1 | Item | Element | Material | % | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| K | 2 | East | 1 | Wall | Cover | Dash | B | 3 | Local crack above one window | ||||
| K | 2 | East | 1 | Wall | Window Apertures | Rendered | A | 3 | |||||
| K | 2 | East | 1 | Wall | Windows | UPVC | A | 3 | |||||
| K | 2 | East | 1 | Wall | Sills | UPVC | A | 3 | |||||
| K | 2 | East | 1 | Wall | RWP Downpipes | Aluminium | A | 3 | |||||
| K | 2 | East | 1 | Wall | Fixings | Proprietary | B | 3 | Light fitting have oxidation and corrosion evident | ||||
| K | 2 | East | 1 | Wall | Pathways | Macadam | B | 3 | Wear and tear |
| K‐2 East 2 | Rooftop Wall Elevation above A‐2 | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| K | 2 | East | 2 | Item | Element | Material | % | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| K | 2 | East | 2 | Wall | Cover | Dash | A | 3 | |||||
| K | 2 | East | 2 | Wall | Fixings | Proprietary | A | 3 | (Sounder) |
| K‐2 North 1 | Single Story Wall Elevation | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| K | 2 | North | 1 | Item | Element | Material | % | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| K | 2 | North | 1 | Wall | Cover | Dash | A | 3 | |||||
| K | 2 | North | 1 | Wall | Window Apertures | Rendered | C | 2 | Foam fill is visible along the top of the window frames, not sealed | ||||
| K | 2 | North | 1 | Wall | Windows | UPVC | A | 2 | |||||
| K | 2 | North | 1 | Wall | Sills | Concrete | A | 3 | |||||
| K | 2 | North | 1 | Wall | Screens | Timber | A | 3 | |||||
| K | 2 | North | 1 | Wall | Penetrations | Metal | C | 2 | Discolouration, damage and corrosion to grille covers | ||||
| K | 2 | North | 1 | Wall | Fixings | Proprietary | B | 2 | Light fittings | ||||
| K | 2 | North | 1 | Wall | Pathways | Concrete | B | 3 | Wear and tear |
| K‐2 North 2 | Wall Elevation | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| K | 2 | North | 2 | Item | Element | Material | % | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| K | 2 | North | 2 | Wall | Cover | Dash | B | 3 | Cracking to high level locally | ||||
| K | 2 | North | 2 | Wall | Sills | Concrete | C | 1 | Concrete threshold has been overlaid at the doorway and has broken up and falling off | ||||
| K | 2 | North | 2 | Wall | Doorways | Concrete | A | 3 | |||||
| K | 2 | North | 2 | Wall | Doors | UPVC | C | 2 | Oxidisation is evident below the powdered coated surface of the door furniture | ||||
| K | 2 | North | 2 | Wall | RWP Downpipes | Aluminium | C | 2 | Oxidisation is evident below the powdered coated surface, and the surface is discoloured | ||||
| K | 2 | North | 2 | Wall | Pathways | Macadam | B | 3 | Wear and tear |
| K‐2 North 3 | Rooftop Wall Elevation above K‐3 | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| K | 2 | North | 2 | Item | Element | Material | % | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| K | 2 | North | 2 | Wall | Cover | Dash | C | 2 | Dash has widespread loss of the aggregate | ||||
| K | 2 | North | 2 | Wall | Window Apertures | Rendered | B | 3 | Wear and tear | ||||
| K | 2 | North | 2 | Wall | Windows | UPVC | A | 3 |
| K‐2 West 1 | Single Story Wall Elevation | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| K | 2 | West | 1 | Item | Element | Material | % | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| K | 2 | West | 1 | Wall | Cover | Dash | C | 3 | Cracking to high level below the eaves locally | ||||
| K | 2 | West | 1 | Wall | Window Apertures | Rendered | A | 3 | |||||
| K | 2 | West | 1 | Wall | Windows | UPVC | A | 3 | |||||
| K | 2 | West | 1 | Wall | Sills | Concrete | A | 3 | |||||
| K | 2 | West | 1 | Wall | Sills | UPVC | A | 3 | |||||
| K | 2 | West | 1 | Wall | Doorways | Rendered | A | 2 | |||||
| K | 2 | West | 1 | Wall | Doors | UPVC | A | 2 | |||||
| K | 2 | West | 1 | Wall | RWP Downpipes | Aluminium | C | 3 | Oxidisation is evident below the powdered coated surface, and the surface is discoloured. Connections between various sizes have been improvised from the hopper | ||||
| K | 2 | West | 1 | Wall | Fixings | Proprietary | B | 2 | Light fittings | ||||
| K | 2 | West | 1 | Wall | Penetrations | Services | B | 2 | Gas Supply | ||||
| K | 2 | West | 1 | Wall | Pathways | Macadam | B | 3 | Wear and tear |
| K‐2 West 2 | Rooftop Wall Elevation above K‐3 | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| K | 2 | West | 2 | Item | Element | Material | % | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| K | 2 | West | 2 | Wall | Cover | Dash | A | 3 | |||||
| K | 2 | West | 2 | Wall | RWP Downpipes | Aluminium | A | 3 |
| K‐2 Roof 1 | Flat Roof abutting K‐1 and connecting to K‐5 & J‐1 | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| K | 2 | Roof | 1 | Item | Element | Material | % | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| K | 2 | Roof | 1 | Roof | Cover | Mineral Felt | C | 2 | Detritus, standing water and repairs are covering large areas of this roof section | ||||
| K | 2 | Roof | 1 | Roof | Valley | Mineral Felt | A | 3 | |||||
| K | 2 | Roof | 1 | Roof | Eaves/Fascia | Timber | A | 3 | |||||
| K | 2 | Roof | 1 | Roof | Soffit | Soffit Brd | C | 2 | Fixing have corrosion evident | ||||
| K | 2 | Roof | 1 | Roof | Soffit | Soffit Brd | C | 2 | There is large gaps between the soffit and the building wall along the south elevation facade | ||||
| K | 2 | Roof | 1 | Roof | RWP Hopper | Aluminium | B | 2 | Hopper support is minimal | ||||
| K | 2 | Roof | 1 | Roof | RWP Guttering | Aluminium | B | 2 | Oxidisation is evident below the powdered coated surface | ||||
| K | 2 | Roof | 1 | Roof | Top Abutment | Copper | B | 2 | Copper flashing along k‐1 have lifted |
| K‐3 North 1 | Single Story Wall Elevation | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| K | 3 | North | 1 | Item | Element | Material | % | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| K | 3 | North | 1 | Wall | Cover | Dash | B | 3 | Wear and tear | ||||
| K | 3 | North | 1 | Wall | Window Apertures | Concrete | C | 3 | Precast framing units have un‐filled holes at the top corners of the window, remnants of mastic (presumably from PCV cover trims) remain and look unsightly | ||||
| K | 3 | North | 1 | Wall | Windows | UPVC | B | 2 | Opening casements have screw holes in the corners, suggesting there is/was a problem with the seals or security | ||||
| K | 3 | North | 1 | Wall | Sills | Concrete | C | 3 | Mortar has failed local to joints and some connections. Sills have been 'notched' roughly to install RWP downpipes | ||||
| K | 3 | North | 1 | Wall | Doorways | Concrete | C | 3 | Crack to the concrete frame/door surround, and remedial works are evident | ||||
| K | 3 | North | 1 | Wall | Doors | Timber | C | 2 | Paint is perishing to the door and frame, evidence of deterioration is present, fixings are corroding and staining paintwork | ||||
| K | 3 | North | 1 | Wall | RWP Downpipes | Aluminium | C | 2 | Oxidisation is evident below the powdered coated surface, and the surface is discoloured | ||||
| K | 3 | North | 1 | Wall | Penetrations | Services | C | 2 | Broken waste pipe | Yes | |||
| K | 3 | North | 1 | Wall | Pathways | Macadam | B | 3 | Wear and tear |
| K‐3 West 1 | Single Story Wall Elevation Ally and Undercroft | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| K | 3 | West | 1 | Item | Element | Material | % | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| K | 3 | West | 1 | Wall | Cover | Dash | C | 2 | Dash has lost chippings, very aged | ||||
| K | 3 | West | 1 | Wall | Window Apertures | Rendered | B | 2 | Wear and tear | ||||
| K | 3 | West | 1 | Wall | Windows | Timber | C | 1 | Window is boarded up | ||||
| K | 3 | West | 1 | Wall | Sills | Concrete | A | 3 | |||||
| K | 3 | West | 1 | Wall | Doorways | Rendered | C | 1 | Softwood is exposed to the elements above the double doors in the recessed area | ||||
| K | 3 | West | 1 | Wall | Doors | Timber | C | 2 | Door furniture is corroding and discoloured | ||||
| K | 3 | West | 1 | Wall | RWP Downpipes | Aluminium | C | 2 | Oxidisation is evident below the powdered coated surface, and the surface is discoloured | ||||
| K | 3 | West | 1 | Wall | Penetrations | Services | C | 2 | Broken waste pipe | Yes | |||
| K | 3 | West | 1 | Wall | Pathways | Macadam | B | 3 | Wear and tear |
| K‐3 Roof 1 | Flat Roof abutting K‐2 & J‐1 | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| K | 3 | Roof | 1 | Item | Element | Material | % | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| K | 3 | Roof | 1 | Roof | Cover | Mineral Felt | A | 2 | |||||
| K | 3 | Roof | 1 | Roof | Eaves/Fascia | Timber | C | 1 | Paint is delamination to the recessed section | ||||
| K | 3 | Roof | 1 | Roof | Eaves/Fascia | Concrete | A | 3 | |||||
| K | 3 | Roof | 1 | Roof | Soffit | Concrete | C | 1 | Cracks opening to the concrete along the soffit line | ||||
| K | 3 | Roof | 1 | Roof | Soffit | Soffit Brd | C | 2 | Paint is delaminating to the soffit in the recessed area | ||||
| K | 3 | Roof | 1 | Roof | RWP Guttering | Aluminium | C | 2 | Oxidisation is evident below the powdered coated surface, and the surface is discoloured | ||||
| K | 3 | Roof | 1 | Roof | Side Abutment | Lead | C | 2 | Lead flashings are not extending 100mm. Flashings have not been formed to the windows on the south abutting windows |
| K‐4 Roof 1 | Flat Roof abutting B‐4, L‐1, K‐1 & K‐5 | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| K | 4 | Roof | 1 | Item | Element | Material | % | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| K | 4 | Roof | 1 | Roof | Cover | Mineral Felt | C | 2 | Detritus and lichen build‐up is widespread | ||||
| K | 4 | Roof | 1 | Roof | Side Abutment | Copper | 40% | D | 2 | Copper flashings are deteriorated and breaking up in places | |||
| K | 4 | Roof | 1 | Roof | Side Abutment | Lead | 60% | A | 3 | ||||
| K | 4 | Roof | 1 | Roof | Penetrations | Services | C | 2 | Service installations are deteriorating and seals are assessed to be similar | ||||
| K | 4 | Roof | 1 | Roof | Roof Lights | Metal | A | 3 |
| K‐5 South 1 | Rooftop Wall Elevation above K‐4 | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| K | 5 | South | 1 | Item | Element | Material | % | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| K | 5 | South | 1 | Wall | Cover | Dash | C | 2 | Cracks are evident, repairs/sealing has been undertaken sections remain needing attention |
| K‐5 North 1 | Rooftop Wall Elevation above A‐2 | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| K | 5 | North | 1 | Item | Element | Material | % | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| K | 5 | North | 1 | Wall | Cover | Rendered | B | 3 | Ware and tear | ||||
| K | 5 | North | 1 | Wall | Window Apertures | Rendered | B | 3 | Ware and tear | ||||
| K | 5 | North | 1 | Wall | Windows | Timber | D | 1 | Paint has delaminated and frames are rotting | ||||
| K | 5 | North | 1 | Wall | Fixings | Proprietary | C | 3 | Intruder alarm |
| K‐5 Roof 1 | Flat Roof abutting A‐3, B‐4, K‐1 and connected to K‐2 | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| K | 5 | Roof | 1 | Item | Element | Material | % | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| K | 5 | Roof | 1 | Roof | Cover | Mineral Felt | C | 2 | Detritus build‐up | ||||
| K | 5 | Roof | 1 | Roof | Eaves/Fascia | Concrete | A | 3 | |||||
| K | 5 | Roof | 1 | Roof | Soffit | Concrete | A | 3 | |||||
| K | 5 | Roof | 1 | Roof | RWP Guttering | Aluminium | C | 3 | Oxidisation is evident below the powdered coated surface, and the surface is discoloured. |
| L‐1 East 1 | Rooftop Wall Elevation Gable, above L‐2, B‐4, K‐4 & K‐5 | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| L | 1 | East | 1 | Item | Element | Material | % | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| L | 1 | East | 1 | Wall | Cover | Metal | A | 3 | |||||
| L | 1 | East | 1 | Wall | Windows | Metal | B | 3 | Panels to the sloped roof are heavily soiled |
| L‐1 West 1 | Rooftop Wall Elevation Gable, above J‐3 | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| L | 1 | West | 1 | Item | Element | Material | % | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| L | 1 | West | 1 | Wall | Cover | Metal | 95% | C | 3 | Corrosion is evident, particularly to the flashing below the gutter on the short section. | |||
| L | 1 | West | 1 | Wall | Cover | Mineral Felt | 5% | C | 2 | Small wall section above J‐4 roof | |||
| L | 1 | West | 1 | Wall | Windows | Metal | B | 3 | Mastic is beginning to breakdown along joints and lichen growth is present | ||||
| L | 1 | West | 1 | Wall | Penetrations | Services | A | 3 | |||||
| L | 1 | West | 1 | Wall | RWP Hopper | Metal | C | 2 | Hopper at the end of the valley is corroding |
| L‐1 Roof 1 | Pitched Roof above K‐1 & abutting B‐4 | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| L | 1 | Roof | 1 | Item | Element | Material | % | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| L | 1 | Roof | 1 | Roof | Cover | Metal | 70% | B | 3 | Covering is heavily soiled and some of the fixing covers are missing, corroding fixings are visible. There is one bird nest | |||
| L | 1 | Roof | 1 | Roof | Cover | GRP | 30% | A | 3 | ||||
| L | 1 | Roof | 1 | Roof | Ridge | Metal | A | 3 | |||||
| L | 1 | Roof | 1 | Roof | Valley | Metal | A | 3 | |||||
| L | 1 | Roof | 1 | Roof | Eaves/Fascia | Metal | A | 3 | |||||
| L | 1 | Roof | 1 | Roof | Soffit | Metal | A | 3 | |||||
| L | 1 | Roof | 1 | Roof | RWP Guttering | Metal | B | 3 | Vegetation is growing on the box guttering |
| L‐2 Roof 1 | Flat Roof abutting B‐4 & L‐1 | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| L | 2 | Roof | 1 | Item | Element | Material | % | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| L | 1 | Roof | 1 | Roof | Cover | Mineral Felt | C | 2 | Detritus and debris present | ||||
| L | 1 | Roof | 1 | Roof | Side Abutment | Mineral Felt | C | 2 | Aged installations | ||||
| L | 1 | Roof | 1 | Roof | Roof Lights | Proprietary | C | 2 | Lights and sun tube terminals | ||||
| L | 1 | Roof | 1 | Roof | Roof Terminals | Proprietary | C | 2 | Aging installations |
| M‐1 South 1 | Two Story Wall Elevation | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| M | 1 | South | 1 | Item | Element | Material | % | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| M | 1 | South | 1 | Wall | Cover | Brick | 70% | C | 2 | Mortar pointing has started to fail in local areas | |||
| M | 1 | South | 1 | Wall | Cover | Dash | 30% | C | 2 | Mortar pointing has started to fail in local areas | |||
| M | 1 | South | 1 | Wall | Window Apertures | Brick | C | 2 | Mastic sealant is incomplete around some sections of the frames | ||||
| M | 1 | South | 1 | Wall | Windows | UPVC | C | 2 | Seals have shrunk back from the corners of the frames in places. There are external holes drilled into frames intermating there is water ingressing in some sections | ||||
| M | 1 | South | 1 | Wall | Sills | C | 2 | Pointing is incomplete to several sills, remedial work has been undertaken | |||||
| M | 1 | South | 1 | Wall | Penetrations | Services | C | 2 | There are numerous drainage and service penetrations through the wall which have not been sealed, allowing weather and water ingress | ||||
| M | 1 | South | 1 | Wall | Fixings | Metal | C | 3 | There are numerous redundant fixing points and fitting that are corroding | ||||
| M | 1 | South | 1 | Wall | Pathways | Macadam | B | 3 | Wear and tear |
| M‐1 East 1 | Rooftop Wall Elevation above B‐2 | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| M | 1 | East | 1 | Item | Element | Material | % | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| M | 1 | East | 1 | Wall | Cover | GRP | A | 3 |
| M‐1 East 2 | Two Story Wall Elevation partly above J‐4 | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| M | 1 | East | 2 | Item | Element | Material | % | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| M | 1 | East | 2 | Wall | Cover | Dash | 50% | B | 3 | Wear and tear | |||
| M | 1 | East | 2 | Wall | Cover | Brick | 20% | C | 2 | Mortar pointing is deteriorating in places and voids provide ingress for weathering and water. | |||
| M | 1 | East | 2 | Wall | Cover | UPVC | 20% | A | 3 | ||||
| M | 1 | East | 2 | Wall | Cover | Mineral Felt | 10% | C | 2 | Large vertical flashing covers services | |||
| M | 1 | East | 2 | Wall | Fixings | Services | C | 2 | Brackets supporting services are heavily corroded | ||||
| M | 1 | East | 2 | Wall | Screens | UPVC | A | 3 | |||||
| M | 1 | East | 2 | Wall | RWP Downpipes | UPVC | C | 1 | Broken brackets | Yes | |||
| M | 1 | East | 2 | Wall | Pathways | Gravel | C | 2 | Detritus present | ||||
| M | 1 | East | 2 | Wall | Soffit | Mineral Felt | C | 2 | The junction between floor levels has an improvised covering the soffit has holes |
| M‐1 North 1 | Rooftop Wall Elevation above D‐1 | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| M | 1 | North | 1 | Item | Element | Material | % | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| M | 1 | North | 1 | Wall | Cover | Brick | C | 2 | Mortar pointing is deteriorating in places and voids provide ingress for weathering and water. | ||||
| M | 1 | North | 1 | Wall | Window Apertures | Brick | C | 2 | Mortar pointing is deteriorating in places and voids provide ingress for weathering and water. | ||||
| M | 1 | North | 1 | Wall | Windows | Timber | D | 1 | Paint has delaminated and frame is rotting | ||||
| M | 1 | North | 1 | Wall | Sills | Concrete | A | 3 | |||||
| M | 1 | North | 1 | Wall | Fixings | Services | C | 2 | Brackets/Fixings supporting services are heavily corroded |
| M‐1 North 2 | Rooftop Wall Elevation above J‐4 | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| M | 1 | North | 2 | Item | Element | Material | % | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| M | 1 | North | 2 | Wall | Cover | Concrete | 70% | A | 3 | ||||
| M | 1 | North | 2 | Wall | Cover | Brick | 30% | C | 2 | Mortar pointing is deteriorating in places and voids provide ingress for weathering and water. | |||
| M | 1 | North | 2 | Wall | Window Apertures | Concrete | A | 3 | |||||
| M | 1 | North | 2 | Wall | Windows | UPVC | A | 3 | |||||
| M | 1 | North | 2 | Wall | Sills | UPVC | A | 3 | |||||
| M | 1 | North | 2 | Wall | Fixings | Services | C | 2 | Brackets/Fixings supporting services are heavily corroded. Aerial TV | ||||
| M | 1 | North | 2 | Wall | Penetrations | Services | B | 3 | Grilles have been installed, dash finish is not close fitted nor sealed |
| M‐1 West 1 | Two Story Wall Elevation | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| M | 1 | West | 1 | Item | Element | Material | % | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| M | 1 | West | 1 | Wall | Cover | Brick | 50% | C | 2 | Mortar pointing is deteriorating in places and voids provide ingress for weathering and water. There is cracking across pillars and perpendicular and bed joint have cracked. Several chipped and damaged bricks | |||
| M | 1 | West | 1 | Wall | Cover | Dash | 50% | C | 2 | Cracks >3mm and pieces fallen out on one location, Remedial work has been undertaken to 1FL | |||
| M | 1 | West | 1 | Wall | Window Apertures | Brick | C | 2 | Mortar pointing is deteriorating in places and voids provide ingress for weathering and water | ||||
| M | 1 | West | 1 | Wall | Windows | UPVC | D | 2 | Frames deflect easily, suggesting it has insufficient or failed fixings; the frames have opened around the perimeters and open joints provide ingress for weather and water. PVC plates have fallen away and mastic is unsightly. Covers are missing from drainage holes | ||||
| M | 1 | West | 1 | Wall | Sills | Concrete | C | 1 | Sections have broken off locally | ||||
| M | 1 | West | 1 | Wall | Doorways | Brick | C | 2 | Mortar pointing is deteriorating in places and voids provide ingress for weathering and water. Expanding foam is visible above the frame | ||||
| M | 1 | West | 1 | Wall | Doors | Metal | B | 2 | Small amount of oxidisation is visible below the powder coated finish | ||||
| M | 1 | West | 1 | Wall | Fixings | Services | B | 2 | Gas pipe surface mounted | ||||
| M | 1 | West | 1 | Wall | Fixings | Metal | B | 2 | Handrail fixings are corroding | ||||
| M | 1 | West | 1 | Wall | Pathways | Concrete | B | 2 | Remedial grading to the doorway is starting to break‐up |
| M‐1 Roof 1 | Flat Roof | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| M | 1 | Roof | 1 | Item | Element | Material | % | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| M | 1 | Roof | 1 | Roof | Cover | GRP | C | 2 | Several repairs appear to have been undertaken to the roof covering, however the covering is generally clean order | ||||
| M | 1 | Roof | 1 | Roof | Eaves/Fascia | UPVC | A | 3 | |||||
| M | 1 | Roof | 1 | Roof | Soffit | UPVC | A | 3 | |||||
| M | 1 | Roof | 1 | Roof | Valley | GRP | A | 3 | |||||
| M | 1 | Roof | 1 | Roof | Roof Terminals | Services | A | 3 |
| O‐1 South 1 | Single Story Wall Elevation (Temporary Building) | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| O | 1 | South | 1 | Item | Element | Material | % | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| O | 1 | South | 1 | Wall | Cover | Weather Brd | C | 1 | Weather board fixings are starting pull through the board, losing their security. Boards are beginning it break‐up local to fixing failures | ||||
| O | 1 | South | 1 | Wall | Cover | Timber | C | 1 | Timber sole plate paint is stained and timber is beginning to deteriorate | ||||
| O | 1 | South | 1 | Wall | Cover | Timber | C | 1 | Timber pelmet around the temporary building is in the process of collapse |
| O‐1 East 1 | Single Story Wall Elevation (Temporary Building) | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| O | 1 | East | 1 | Item | Element | Material | % | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| O | 1 | East | 1 | Wall | Cover | Weather Brd | C | 1 | Weather board fixings are pulling through the board widespread, losing their security | ||||
| O | 1 | East | 1 | Wall | Cover | Timber | B | 1 | Timber sole plate paint is stained and timber is beginning to deteriorate | ||||
| O | 1 | East | 1 | Wall | Cover | Timber | C | 1 | Timber pelmet around the temporary building is in the process of collapse | ||||
| O | 1 | East | 1 | Wall | Windows | UPVC | B | 2 | |||||
| O | 1 | East | 1 | Wall | Doors | Timber | C | 1 | Paint is delaminating generally, wood is deteriorating and or rotting, furniture is corroding or oxidising | ||||
| O | 1 | East | 1 | Wall | RWP Downpipes | Plastic | C | 1 | Rain water is discharging to the ground without drainage | ||||
| O | 1 | East | 1 | Wall | Fixings | Proprietary | C | 1 | Light fittings are deteriorating and PIR covers are broken | ||||
| O | 1 | East | 1 | Wall | Ramps | Timber | C | 1 | Railing are deteriorating some repairs have been undertaken |
| O‐1 North 1 | Single Story Wall Elevation (Temporary Building) | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| O | 1 | North | 1 | Item | Element | Material | % | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| O | 1 | North | 1 | Wall | Cover | Weather Brd | C | 1 | Weather board fixings are starting pull through the board, losing their security | ||||
| O | 1 | North | 1 | Wall | Cover | Timber | B | 1 | Timber sole plate paint is stained and timber is beginning to deteriorate | ||||
| O | 1 | North | 1 | Wall | Cover | Timber | C | 1 | Timber pelmet around the temporary building is in the process of collapse |
| O‐1 West 1 | Single Story Wall Elevation (Temporary Building) | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| O | 1 | West | 1 | Item | Element | Material | % | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| O | 1 | West | 1 | Wall | Cover | Weather Brd | C | 1 | Weather board fixings are starting pull through the board, losing their security | ||||
| O | 1 | West | 1 | Wall | Cover | Timber | C | 1 | Timber sole plate paint is stained and timber is beginning to deteriorate | ||||
| O | 1 | West | 1 | Wall | Cover | Timber | C | 1 | Timber pelmet around the temporary building is in the process of collapse | ||||
| O | 1 | West | 1 | Wall | Windows | UPVC | C | 2 | |||||
| O | 1 | West | 1 | Wall | Doors | Timber | D | 1 | Paint is delaminating generally, wood is deteriorating and or rotting, furniture is corroding or oxidising | ||||
| O | 1 | West | 1 | Wall | RWP Downpipes | Plastic | C | 1 | Rain water is discharging to the ground without drainage | ||||
| O | 1 | West | 1 | Wall | Fixings | Proprietary | C | 1 | Light fittings are deteriorating and PIR covers are broken | ||||
| O | 1 | West | 1 | Wall | Ramps | Timber | C | 1 | Railing are deteriorating some repairs have been undertaken |
| O‐1 Roof 1 | Flat Roof (Temporary Building) | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| O | 1 | Roof | 1 | Item | Element | Material | % | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| O | 1 | Roof | 1 | Roof | Cover | GRP | B | 3 | Lichen grown is visible | ||||
| O | 1 | Roof | 1 | Roof | Eaves/Fascia | GRP | B | 3 | Lichen grown is visible | ||||
| O | 1 | Roof | 1 | Roof | RWP Guttering | Plastic | A | 3 | |||||
| O | 1 | Roof | 1 | Roof | Penetrations | Plastic | A | 3 |
| O‐2 South 1 | Single Story Wall Elevation (Temporary Building) | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| O | 2 | South | 1 | Item | Element | Material | % | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| O | 2 | South | 1 | Wall | Cover | Weather Brd | D | 1 | Weather cladding panels have broken along some joints and the sub‐structure timber is exposed to the weather. The plywood pelmet around ground level has corroding fittings and unpainted end grain exposed. Corroding fixings on the weather bars over the windows | ||||
| O | 2 | South | 1 | Wall | Windows | UPVC | A | 2 | |||||
| O | 2 | South | 1 | Wall | Doors | UPVC | A | 2 | |||||
| O | 2 | South | 1 | Wall | RWP Downpipes | Plastic | C | 2 | Support bracket missing from the downpipe | ||||
| O | 2 | South | 1 | Wall | Fixings | Proprietary | A | 3 | (Light fitting) | ||||
| O | 2 | South | 1 | Wall | Ramps | Timber | A | 3 |
| O‐2 East 1 | Single Story Wall Elevation (Temporary Building) | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| O | 2 | East | 1 | Item | Element | Material | % | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| O | 2 | East | 1 | Wall | Cover | Weather Brd | C | 1 | Weather cladding panels have started surface delamination, exposing the underlying wooden panel to the weather in several places. The plywood pelmet around ground level has corroding fittings and unpainted end grain exposed. | ||||
| O | 2 | East | 1 | Wall | Fixings | Metal | B | 2 | Weather monitor |
| O‐2 North 1 | Single Story Wall Elevation (Temporary Building) | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| O | 1 | North | 1 | Item | Element | Material | % | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| O | 1 | North | 1 | Wall | Cover | Weather Brd | C | 1 | The plywood pelmet around ground level has corroding fittings and unpainted end grain exposed. | ||||
| O | 1 | North | 1 | Wall | Windows | UPVC | B | 2 | |||||
| O | 1 | North | 1 | Wall | Doors | Timber | C | 1 | Paint is delaminating from the door and frame, rot is extensive to the threshold and head of the frame | ||||
| O | 1 | North | 1 | Wall | RWP Downpipes | Plastic | A | 3 | |||||
| O | 1 | North | 1 | Wall | Fixings | Proprietary | A | 3 | Light fitting | ||||
| O | 1 | North | 1 | Wall | Ramps | Timber | D | 1 | Railings to the ramp are breaking away, remedial works have been undertaken to some sections. Areas remain unsafe |
| O‐2 West 1 | Single Story Wall Elevation (Temporary Building) | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| O | 2 | West | 1 | Item | Element | Material | % | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| O | 2 | West | 1 | Wall | Cover | Weather Brd | C | 1 | The plywood pelmet around ground level has corroding fittings and unpainted end grain exposed. | ||||
| O | 2 | West | 1 | Wall | Windows | UPVC | A | 2 |
| O‐2 Roof 1 | Flat Roof (Temporary Building) | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| O | 2 | Roof | 1 | Item | Element | Material | % | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| O | 2 | Roof | 1 | Roof | Cover | GRP | A | 2 | |||||
| O | 2 | Roof | 1 | Roof | Eaves/Fascia | GRP | A | 2 | |||||
| O | 2 | Roof | 1 | Roof | RWP Guttering | UPVC | E | 1 | Gutters are missing on the South elevation, and there is an end cap missing from the North elevation | ||||
| O | 2 | Roof | 1 | Roof | Penetrations | Plastic | B | 2 | Vent pipe |
| O‐3 South 1 | Single Story Wall Elevation (Temporary Building) | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| O | 3 | South | 1 | Item | Element | Material | % | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| O | 3 | South | 1 | Wall | Cover | Metal | A | 2 | |||||
| O | 3 | South | 1 | Wall | Windows | Metal | C | 2 | Corrosion to the cage fixings | ||||
| O | 3 | South | 1 | Wall | RWP Downpipes | Plastic | A | 2 |
| O‐3 East 1 | Single Story Wall Elevation (Temporary Building) | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| O | 3 | East | 1 | Item | Element | Material | % | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| O | 3 | East | 1 | Wall | Cover | Metal | B | 2 | Small dents and spot corrosion on the metal panels and corrosion to the posts | ||||
| O | 3 | East | 1 | Wall | Windows | Metal | C | 2 | One broken/unsecured bracket on the window cage, and corrosion on the cage | ||||
| O | 3 | East | 1 | Wall | Doors | UPVC | C | 1 | Door mechanism appears to be not fully functional | ||||
| O | 3 | East | 1 | Wall | Pathways | Slabs | A | 3 |
| O‐3 North 1 | Single Story Wall Elevation (Temporary Building) | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| O | 3 | North | 1 | Item | Element | Material | % | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| O | 3 | North | 1 | Wall | Cover | Metal | B | 2 | |||||
| O | 3 | North | 1 | Wall | Windows | Metal | B | 2 | |||||
| O | 3 | North | 1 | Wall | RWP Downpipes | Plastic | C | 3 | Broken downpipe bracket and corroding fixings |
| O‐3 West 1 | Single Story Wall Elevation (Temporary Building) | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| O | 3 | West | 1 | Item | Element | Material | % | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| O | 3 | West | 1 | Wall | Cover | Metal | B | 2 | Small dents and corrosion to the posts | ||||
| O | 3 | West | 1 | Wall | Windows | Metal | A | 2 | |||||
| O | 3 | West | 1 | Wall | Doors | Metal | A | 2 | |||||
| O | 3 | West | 1 | Wall | Pathways | Concrete | A | 3 |
| O‐3 Roof 1 | Flat Roof (Temporary Building) | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| O | 3 | Roof | 1 | Item | Element | Material | % | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| O | 3 | Roof | 1 | Roof | Cover | Metal | C | 2 | Stones and detritus on the roof | ||||
| O | 3 | Roof | 1 | Roof | Eaves/Fascia | Metal | C | 3 | Corrosion on some sections of fascia | ||||
| O | 3 | Roof | 1 | Roof | RWP Guttering | Metal | B | 3 | Vegetation is growing in the guttering | Yes |
| P‐1 South 1 | Multi‐Story Wall Elevation | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| P | 1 | South | 1 | Item | Element | Material | % | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| P | 1 | South | 1 | Wall | Cover | Dash | 90% | B | 3 | Corrosion is visible widespread to the undersides of the bell‐ cast render molding | |||
| P | 1 | South | 1 | Wall | Cover | Brick | 10% | A | 3 | ||||
| P | 1 | South | 1 | Wall | Doorways | Rendered | A | 3 | |||||
| P | 1 | South | 1 | Wall | Doors | Timber | C | 3 | Wooden door has delaminated paint to large amount of the surface area | ||||
| P | 1 | South | 1 | Wall | Doors | Timber | C | 3 | Door furniture is corroding | ||||
| P | 1 | South | 1 | Wall | RWP Downpipes | Metal | B | 3 | Minor corrosion is visible | ||||
| P | 1 | South | 1 | Wall | Fixings | Proprietary | B | 3 | (Light fitting) | ||||
| P | 1 | South | 1 | Wall | Pathways | Concrete | A | 3 |
| P‐1 South 2 | Single Story Wall Elevation | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| P | 1 | South | 2 | Item | Element | Material | % | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| P | 1 | South | 2 | Wall | Cover | Dash | A | 3 | |||||
| P | 1 | South | 2 | Wall | Windows | UPVC | B | 2 | Trim have become displaced above the window head in one section | ||||
| P | 1 | South | 2 | Wall | Doorways | Rendered | C | 3 | Render has broken away from the doorframe in places and there is no mastic seal | ||||
| P | 1 | South | 2 | Wall | Doors | Metal | A | 3 | |||||
| P | 1 | South | 2 | Wall | RWP Downpipes | Metal | C | 3 | Corrosion on the cast iron downpipe | ||||
| P | 1 | South | 2 | Wall | Penetrations | Plastic | C | 3 | Waste pipes need to be sealed around the openings | ||||
| P | 1 | South | 2 | Wall | Fixings | Metal | C | 3 | Corroding metal fixings | ||||
| P | 1 | South | 2 | Wall | Fixings | Metal | B | 3 | (Light fittings) | ||||
| P | 1 | South | 2 | Wall | Fixings | Metal | B | 3 | (School bell) | ||||
| P | 1 | South | 2 | Wall | Pathways | Concrete | A | 3 |
| P‐1 East 1 | Rooftop Wall Elevation Gable, above P‐3 | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| P | 1 | East | 1 | Item | Element | Material | % | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| P | 1 | East | 1 | Wall | Cover | Brick | 10% | A | 3 | ||||
| P | 1 | East | 1 | Wall | Cover | Dash | 90% | A | 3 |
| P‐1 North 1 | Multi‐Story Wall Elevation partly above P‐4 | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| P | 1 | North | 1 | Item | Element | Material | % | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| P | 1 | North | 1 | Wall | Cover | Brick | 10% | A | 3 | ||||
| P | 1 | North | 1 | Wall | Cover | Dash | 90% | A | 3 | ||||
| P | 1 | North | 1 | Wall | RWP Downpipes | Metal | C | 3 | Corrosion is visible to the upper sections of the downpipes | ||||
| P | 1 | North | 1 | Wall | Fixings | Proprietary | C | 2 | Lightning conductor straps and light fittings have brackets disconnected above P‐4 Roof | ||||
| P | 1 | North | 1 | Wall | Pathways | Concrete | A | 3 |
| P‐1 West 1 | Multi‐Story Wall Elevation Gable | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| P | 1 | West | 1 | Item | Element | Material | % | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| P | 1 | West | 1 | Wall | Cover | Brick | 10% | A | 3 | ||||
| P | 1 | West | 1 | Wall | Cover | Dash | 90% | B | 3 | Corrosion is visible widespread to the undersides of the bell‐ cast render molding | |||
| P | 1 | West | 1 | Wall | RWP Downpipes | Metal | A | 3 | |||||
| P | 1 | West | 1 | Wall | Fixings | Proprietary | B | 2 | Decorative panels and CCTV / comms equipment / Lightning conduction straps | ||||
| P | 1 | West | 1 | Wall | Fixings | Proprietary | B | 2 | Non stainless steel fixings are corroding | ||||
| P | 1 | West | 1 | Wall | Pathways | Concrete | 50% | A | 3 | ||||
| P | 1 | West | 1 | Wall | Pathways | Macadam | 50% | A | 3 |
| P‐1 West 2 | Multi‐Story Wall Elevation Half Gable | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| P | 1 | West | 2 | Item | Element | Material | % | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| P | 1 | West | 2 | Wall | Cover | Dash | A | 3 | |||||
| P | 1 | West | 2 | Wall | Windows | UPVC | A | 2 | |||||
| P | 1 | West | 2 | Wall | Sills | Concrete | A | 3 | |||||
| P | 1 | West | 2 | Wall | Penetrations | Proprietary | B | 2 | Incoming Gas Service / Meter Box |
| P‐1 Roof 1 | Pitched Roof | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| P | 1 | Roof | 1 | Item | Element | Material | % | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| P | 1 | Roof | 1 | Roof | Cover | Metal | A | 3 | |||||
| P | 1 | Roof | 1 | Roof | Ridge | Metal | A | 3 | |||||
| P | 1 | Roof | 1 | Roof | Eaves/Fascia | Metal | A | 3 | |||||
| P | 1 | Roof | 1 | Roof | Soffit | Soffit Brd | C | 3 | Fixings are corroding | ||||
| P | 1 | Roof | 1 | Roof | Barge Board | Aluminium | A | 3 | Minor deflections in the barge panels | ||||
| P | 1 | Roof | 1 | Roof | RWP Guttering | Aluminium | B | 3 | Vegetation is growing in the box guttering | Yes | |||
| P | 1 | Roof | 1 | Roof | Roof Terminals | Services | A | 3 |
| P‐2 South 1 | Single Story Wall Elevation partly above P‐4 | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| P | 2 | South | 1 | Item | Element | Material | % | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| P | 2 | South | 1 | Wall | Cover | Dash | C | 3 | Damage/holes to wall by bib tap and fascia, adjacent to P‐4 West 1 | ||||
| P | 2 | South | 1 | Wall | Cover | Dash | C | 1 | Damage to render locally above P‐4 Roof 1 Flashings | Yes | |||
| P | 2 | South | 1 | Wall | Fixings | Proprietary | C | 1 | Light fitting cover has broken, internals are exposed to the weather | Yes |
| P‐2 East 1 | Single Story Wall Elevation | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| P | 2 | East | 1 | Item | Element | Material | % | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| P | 2 | East | 1 | Wall | Cover | Dash | B | 3 | There are redundant holes and fixings that require removal and filling suitably. Small sections of render band have broken away at ground level | Yes | |||
| P | 2 | East | 1 | Wall | Windows | UPVC | C | 2 | Reveals and sills have not been completed following window replacement, packers and foam filler is exposed | ||||
| P | 2 | East | 1 | Wall | Sills | Concrete | B | 2 | Reveals and sills have not been completed following window replacement, packers and foam filler is exposed | ||||
| P | 2 | East | 1 | Wall | RWP Downpipes | Metal | C | 3 | Corrosion on the cast iron downpipe | Yes | |||
| P | 2 | East | 1 | Wall | RWP Downpipes | Metal | B | 2 | Plastic gutters connecting to cast iron downpipes | ||||
| P | 2 | East | 1 | Wall | Fixings | Metal | B | 2 | CCTV housing has deterioration evident |
| P‐2 North 1 | Single Story Wall Elevation | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| P | 2 | North | 1 | Item | Element | Material | % | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| P | 2 | North | 1 | Wall | Cover | Dash | B | 2 | Several cracks are visible in the dash wall covering, and lichen is growing locally | ||||
| P | 2 | North | 1 | Wall | Penetrations | Proprietary | C | 1 | Extraction grille/housing has failed fixings and is dislodged from the face of the wall | ||||
| P | 2 | North | 1 | Wall | Pathways | Macadam | B | 3 | Wear and tear |
| P‐2 West 1 | Single Story Wall Elevation | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| P | 2 | West | 1 | Item | Element | Material | % | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| P | 2 | West | 1 | Wall | Cover | Dash | B | 3 | Several cracks are visible in the dash wall covering, and to the lower render band | ||||
| P | 2 | West | 1 | Wall | Windows | Timber | B | 2 | Yes | ||||
| P | 2 | West | 1 | Wall | Sills | Concrete | B | 3 | Some local damage and cracks are visible | ||||
| P | 2 | West | 1 | Wall | RWP Downpipes | Metal | C | 3 | Cast iron down pipes and fixings have corrosion (note there is no guttering fixed here see P‐2 Roof 1 | ||||
| P | 2 | West | 1 | Wall | Fixings | Proprietary | A | 3 | (School bell) |
| P‐2 Roof 1 | Pitched Roof | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| P | 2 | Roof | 1 | Item | Element | Material | % | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| P | 2 | Roof | 1 | Roof | Cover | Concrete | C | 1 | Two or more tiles are displaced, moss is growing local to roof cowls | Yes | |||
| P | 2 | Roof | 1 | Roof | Ridge | Concrete | A | 3 | |||||
| P | 2 | Roof | 1 | Roof | Hip | Concrete | C | 2 | Mortar bed is deteriorating, hip tiles have started to debonded in places | ||||
| P | 2 | Roof | 1 | Roof | Eaves/Fascia | UPVC | A | 3 | |||||
| P | 2 | Roof | 1 | Roof | Soffit | UPVC | A | 3 | |||||
| P | 2 | Roof | 1 | Roof | RWP Guttering | Plastic | B | 3 | Plastic gutters connecting to cast iron downpipes | ||||
| P | 2 | Roof | 1 | Roof | RWP Guttering | Plastic | E | 2 | There is no guttering fixed along the P‐1 North 1, P‐1 West 1, P‐1 South 1 elevations | ||||
| P | 2 | Roof | 1 | Roof | Roof Terminals | Proprietary | C | 1 | Vegetation is starting grow in the detritus accumulated above some installations | Yes |
| P‐3 West 1 | Single Story Wall Elevation | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| P | 3 | West | 1 | Item | Element | Material | % | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| P | 3 | West | 1 | Wall | Cover | Brick | A | 3 | |||||
| P | 3 | West | 1 | Wall | RWP Downpipes | Metal | C | 3 | Cast iron down pipes and fixings have corrosion | ||||
| P | 3 | West | 1 | Wall | Penetrations | B | Five service are routed through the fascia board | ||||||
| P | 3 | West | 1 | Wall | Fixings | Timber | C | 3 | There is a Plywood box housing services which pass to the Fascia into the building | ||||
| P | 3 | West | 1 | Wall | Pathways | Concrete | B | 3 | Wear and tear |
| P‐3 Roof 1 | Flat Roof abutting C‐2, P‐1 & part of P‐4 | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| P | 3 | Roof | 1 | Item | Element | Material | % | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| P | 3 | Roof | 1 | Roof | Cover | GRP | A | 3 | |||||
| P | 3 | Roof | 1 | Roof | Eaves/Fascia | Timber | C | 3 | Soft wood has delaminated paint and corroding fixings | ||||
| P | 3 | Roof | 1 | Roof | Eaves/Fascia | Timber | C | 3 | Five No. services are routed through the fascia board at P‐3 West 1 | ||||
| P | 3 | Roof | 1 | Roof | RWP Guttering | Plastic | A | 3 | |||||
| P | 3 | Roof | 1 | Roof | RWP Guttering | GRP | C | 1 | Outlets on rooftop box guttering are small and have no sieve fitted, they are at risk of blockage | Yes | |||
| P | 3 | Roof | 1 | Roof | Flashing | Lead | C | 2 | Flashing are poorly trimmed in places, incomplete on a couple of corners, lifting in places and upstand is < 150mm on places | ||||
| P | 3 | Roof | 1 | Roof | Roof Lights | Proprietary | A | 3 |
| P‐4 East 1 | Single Story Wall Elevation | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| P | 4 | East | 1 | Item | Element | Material | % | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| P | 4 | East | 1 | Wall | Doorways | Brick | A | 3 | |||||
| P | 4 | East | 1 | Wall | Doors | Metal | A | 3 | |||||
| P | 4 | East | 1 | Wall | RWP Downpipes | Metal | B | 2 | Corrosion locally | ||||
| P | 4 | East | 1 | Wall | Fixings | Proprietary | A | 3 | (Bib tap) | ||||
| P | 4 | East | 1 | Wall | Fixings | Proprietary | A | 3 | (Light fitting) | ||||
| P | 4 | East | 1 | Wall | Pathways | Macadam | A | 3 |
| P‐4 West 1 | Single Story Wall Elevation | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| P | 4 | West | 1 | Item | Element | Material | % | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| P | 4 | West | 1 | Wall | Cover | Brick | A | 3 | |||||
| P | 4 | West | 1 | Wall | Doorways | Brick | B | 2 | Corrosion is evident to the lintel over the doorway | ||||
| P | 4 | West | 1 | Wall | Doors | Metal | A | 3 | |||||
| P | 4 | West | 1 | Wall | RWP Downpipes | Metal | C | 2 | Corroding cast iron downpipe and fixings | ||||
| P | 4 | West | 1 | Wall | Fixings | Proprietary | A | 3 | |||||
| P | 4 | West | 1 | Wall | Pathways | Concrete | A | 3 |
| P‐4 Roof 1 | Flat Roof abutting P‐1, P‐2, C‐2 and part of P‐3 Roof | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| P | 4 | Roof | 1 | Item | Element | Material | % | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| P | 4 | Roof | 1 | Roof | Cover | GRP | B | 1 | Detritus and litter present, no sieve fitted and there is a risk of blockage | ||||
| P | 4 | Roof | 1 | Roof | Eaves/Fascia | UPVC | C | 3 | Fascia (West side only) still has plastic covering to be removed | ||||
| P | 4 | Roof | 1 | Roof | Eaves/Fascia | Timber | C | 3 | Painted timber soffit has flaky paint and likely rot at gutter fixings | ||||
| P | 4 | Roof | 1 | Roof | Soffit | Soffit Brd | A | 3 | |||||
| P | 4 | Roof | 1 | Roof | RWP Guttering | Metal | C | 2 | Cast iron gutter (fitted to West side only) is corroding including the fixings | ||||
| P | 4 | Roof | 1 | Roof | Flashing | Lead | C | 3 | Lead flashing needs dressing down in places | ||||
| P | 4 | Roof | 1 | Roof | Flashing | Lead | C | 2 | Flashing are poorly trimmed in places, incomplete on a couple of corners and the pointing has started to deteriorate on the brickwork course adjacent to installation |
| GH Ex Central Z | Greenhouse Area | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| GH | Ex | Central | Z | Item | Element | Material | Finish | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| GH | Ex | Central | Z | Pedestrian Area | Greenhouse | Aluminium | C | 1 | Greenhouse frame is aged guttering to the base has end covers missing and broken downpipe, there is one broken glass pain with tape holing it together. Any ferrous fixings are very likely to be corroded. The rendering to the base walls has delaminated to the opening and in other local areas | ||||
| GH | Ex | Central | Z | Pedestrian Area | Drainage Gullies | Steel | A | 3 | Gullies are worn corroded but serviceable | ||||
| GH | Ex | Central | Z | Pedestrian Area | Pathways | Concrete | C | 2 | Concrete paths have cracked in almost all areas, the joints are not displaced and are serviceable generally; there is one large recently installed area which is in a good condition | ||||
| GH | Ex | Central | Z | Pedestrian Area | Pathways | Macadam | C | 2 | Macadam sections have settled and become uneven in some areas, sections are poor but generally serviceable | ||||
| GH | Ex | Central | Z | Limited Access Area | Pathways | Slabs | B | 3 | The slabs are aged and generally serviceable (Slabbed area is used for storage and only partly visible for inspection) | ||||
| GH | Ex | Central | Z | Pedestrian Area | Walling | Brick | B | 3 | Walling adjacent to the Sports Hall door is aged but generally serviceable | ||||
| GH | Ex | Central | Z | Pedestrian Area | Planters | Brick | C | 3 | Planter to the side on the Greenhouse has a section where the brickwork has broken, approximately 20 bricks are missing; there is no capping to the top of this walling | ||||
| GH | Ex | Central | Z | Limited Access Area | Fencing | Timber | Not known | E | 1 | Fencing around the storage area has broken posts and panels | |||
| GH | Ex | Central | Z | Pedestrian Area | Shed/Out‐building | Timber | Not known | A | 3 | ||||
| GH | Ex | Central | Z | Pedestrian Area | Railings | Steel | Painted | B | 2 | Railings to ramps are aged and have corrosion to the fixings |
| CR Ex Central Z | Circulation Roundabout | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| CR | Ex | Central | Z | Item | Element | Material | Finish | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| CR | Ex | Central | Z | Vehicle Area | Roadway Surface | Macadam | A | 3 | Settlement has caused some local undulations to the surface which is evident against some of the Kerbs. The surface is generally is good condition | ||||
| CR | Ex | Central | Z | Vehicle Area | Road Kerbs | Concrete | B | 3 | Aged in all areas with some local fractures, generally sound; the upstand of the Kerbs is not consistent due presumably to the settlement. The design function of the Kerbs upstand to repel car wheels has been compromised particularly around the island | ||||
| CR | Ex | Central | Z | Vehicle Area | White Lines | Painted | B | 2 | Lines are worn in places | Yes | |||
| CR | Ex | Central | Z | Vehicle Area | Drainage Gullies | Steel | A | 3 | Aged but in a satisfactory condition | ||||
| CR | Ex | Central | Z | Vehicle Area | Drainage Covers | Steel | A | 3 | Aged but in a satisfactory condition | ||||
| CR | Ex | Central | Z | Pedestrian Area | Pathways | Macadam | A | 3 | Aged but in a satisfactory condition | ||||
| CR | Ex | Central | Z | Pedestrian Area | Pathways | Slabs | B | 2 | Paving to the central recreation area have broken and jointing has started to breakdown in several areas | Yes | |||
| CR | Ex | Central | Z | Pedestrian Area | Back Edge Kerbs | Concrete | A | 3 | Aged but in a satisfactory condition | ||||
| CR | Ex | Central | Z | Pedestrian Area | Street Furniture | Timber | Not known | D | 1 | Tables and seating are rotting in places, edge features to the sides of pathways have deteriorated and are falling apart | Yes | ||
| CR | Ex | Central | Z | Pedestrian Area | Walling | Natural Stone | A | 3 | Satisfactory condition |
| Cp/F Ex Central Z | Carpark School Frontage | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Cp/F | Ex | Central | Z | Item | Element | Material | Finish | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| Cp/F | Ex | Central | Z | Vehicle Area | Roadway Surface | Macadam | A | 3 | Settlement has caused some local undulations to the surface which is evident against some of the Kerbs. The surface is generally is good condition | ||||
| Cp/F | Ex | Central | Z | Vehicle Area | Road Kerbs | Concrete | B | 3 | Aged in all areas with some local fractures, generally sound; the upstand of the Kerbs is not consistent due presumably to the settlement | ||||
| Cp/F | Ex | Central | Z | Vehicle Area | White Lines | Painted | B | 2 | Lines are worn in places | ||||
| Cp/F | Ex | Central | Z | Vehicle Area | Parking Bay Surface | Macadam | A | 3 | Settlement has caused some local undulations to the surface which is evident against some of the Kerbs. The surface is generally is good condition, there is detritus and evidence of standing water areas | ||||
| Cp/F | Ex | Central | Z | Vehicle Area | Drainage Gullies | Steel | A | 3 | Aged but in a satisfactory condition | ||||
| Cp/F | Ex | Central | Z | Vehicle Area | Drainage Covers | Steel | A | 3 | Aged but in a satisfactory condition | ||||
| Cp/F | Ex | Central | Z | Pedestrian Area | Pathways | Macadam | C | 2 | Sections adjacent to Blocks J & K are uneven in places, settlement has occurred to a small degree and the surface is uneven in places. Path adjacent to the Tennis Court has sections missing which pose as trip hazards | ||||
| Cp/F | Ex | Central | Z | Pedestrian Area | Pathways | Slabs | A | 2 | A few local fractures / cracks but generally satisfactory | ||||
| Cp/F | Ex | Central | Z | Pedestrian Area | Pathways | Concrete | E | 1 | Concrete surface adjacent to the Kitchen has large cracks and substantial gaps which could cause a trip hazard | ||||
| Cp/F | Ex | Central | Z | Limited Access Area | Street Furniture | Timber | Painted | A | 2 | Flag Pole is very aged and has corrosion to metal parts | |||
| Cp/F | Ex | Central | Z | Limited Access Area | Hardstand | Gravel (Loose) | Painted | B | 2 | The ground cover is this area is uneven, with poor inset wooden treads | |||
| Cp/F | Ex | Central | Z | Pedestrian Area | Railings | Steel | Powder Coating | A | 3 | Colouring has faded significantly but the functionally is in satisfactory condition | |||
| Cp/F | Ex | Central | Z | Pedestrian Area | Bollards | Steel | Painted | A | 3 | Satisfactory condition | |||
| Cp/F | Ex | Central | Z | Pedestrian Area | Bollards | Timber | Treated | A | 3 | Satisfactory condition | |||
| Cp/F | Ex | Central | Z | Pedestrian Area | Seating | Steel | Powder Coating | A | 2 | Fixing down bolts are corroding | |||
| Cp/F | Ex | Central | Z | Pedestrian Area | Walling | Rendered | Painted | A | 3 | Satisfactory condition | |||
| Cp/F | Ex | Central | Z | Pedestrian Area | Walling | Rendered | D | 2 | The north boundary wall has hairline cracks and delaminating render local to the construction joints. The wall is starting to lean forward out of the vertical slightly | ||||
| Cp/F | Ex | Central | Z | Pedestrian Area | Walling | Rendered | D | 1 | The small retaining wall adjacent to the Triple Tennis Courts has cracking and several sections where the concrete capping has broken off and or been displaced. Broken materials are laying in the local grass | ||||
| Cp/F | Ex | Central | Z | Pedestrian Area | Steps | Brick | A | 3 | Satisfactory condition | ||||
| Cp/F | Ex | Central | Z | Pedestrian Area | Walling | Rendered | A | 3 | Satisfactory condition (Bin Store) |
| Cp/D Ex West Z | Carpark Block D | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Cp/D | Ex | West | Z | Item | Element | Material | Finish | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| Cp/D | Ex | West | Z | Vehicle Area | Roadway Surface | Concrete | E | 2 | The ramp access has an uneven surface with sections of old brick walling substructure forming the surface locally | ||||
| Cp/D | Ex | West | Z | Vehicle Area | Road Kerbs | Concrete | E | 2 | There is kerbing completely failed to the short Kerbs section of the ramp | ||||
| Cp/D | Ex | West | Z | Vehicle Area | Roadway Surface | Consolidated Stone | E | 2 | The consolidated stone has become pitted from continued vehicle turning, several pot‐holes and depressions are >100mm | ||||
| Cp/D | Ex | West | Z | Vehicle Area | Parking Bay Surface | Consolidated Stone | E | 2 | The consolidated stone has become pitted from continued vehicle turning, several pot‐holes and depressions are >100mm | ||||
| Cp/D | Ex | West | Z | Vehicle Area | Back Edge Kerbs | Timber | E | 2 | Timber strip edge between the stone surface and grass areas has become overgrown and has worn where visible | ||||
| Cp/D | Ex | West | Z | Vehicle Area | Walling | Rendered | D | 2 | The north boundary wall has hairline cracks and delaminating render local to the construction joints. The wall is starting to lean forward out of the vertical slightly | ||||
| Cp/D | Ex | West | Z | Vehicle Area | Drainage Covers | Steel | C | 2 | Inspection chamber cover is not suitably rated for vehicle passage, security screws are missing and the cover seating ring has not been encapsulated in concrete |
| TTC Ex Central Z | Triple Tennis Court | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| TTC | Ex | Central | Z | Item | Element | Material | Finish | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| TTC | Ex | Central | Z | Sports Area | Hardstand | Macadam | A | 3 | Surface has some settlement local to the perimeter Kerbs and undulation but remains satisfactory | ||||
| TTC | Ex | Central | Z | Sports Area | White Lines | Painted | A | 3 | Satisfactory condition | ||||
| TTC | Ex | Central | Z | Sports Area | Drainage Gullies | Steel | B | 3 | The gully grate is set approximately 100mm below the local surface level | ||||
| TTC | Ex | Central | Z | Sports Area | Back Edge Kerbs | Concrete | A | 3 | Satisfactory condition | ||||
| TTC | Ex | Central | Z | Sports Area | Fencing | Steel | Galvanised | C | 2 | Fencing support wires have broken at most posts, connection rings are corroding. There are gaps in the wiring on the gate |
| Cp/H Ex North Z | Carpark Horseshoe & Lane | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Cp/H | Ex | North | Z | Item | Element | Material | Finish | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| Cp/H | Ex | North | Z | Vehicle Area | Roadway Surface | Macadam | B | 2 | There is one section of the road surface which has started to break‐up | Yes | |||
| Cp/H | Ex | North | Z | Vehicle Area | Road Kerbs | Concrete | A | 3 | Satisfactory condition | ||||
| Cp/H | Ex | North | Z | Vehicle Area | White Lines | Painted | B | 2 | Paint has worn and may be indistinguishable is poor light and or wet conditions | ||||
| Cp/H | Ex | North | Z | Vehicle Area | Parking Bay Surface | Macadam | A | 3 | Satisfactory condition | ||||
| Cp/H | Ex | North | Z | Vehicle Area | Drainage Gullies | Steel | A | 3 | Satisfactory condition | ||||
| Cp/H | Ex | North | Z | Vehicle Area | Drainage Gullies | Concrete | B | 3 | There is one channel section to the roadside which has displaced and brakes the continuity of the channel | Yes | |||
| Cp/H | Ex | North | Z | Vehicle Area | Drainage Covers | Steel | A | 3 | Satisfactory condition | ||||
| Cp/H | Ex | North | Z | Pedestrian Area | Pathways | Macadam | B | 2 | There is a section of the pathway where the macadam appears to have been lain Thin, the material is beginning to break up. Some local settlement has occurred local to the sign posts | ||||
| Cp/H | Ex | North | Z | Pedestrian Area | Back Edge Kerbs | Concrete | A | 3 | Satisfactory condition | ||||
| Cp/H | Ex | North | Z | Pedestrian Area | Railings | Steel | Powder Coating | A | 3 | Satisfactory condition | |||
| Cp/H | Ex | North | Z | Pedestrian Area | Planters | Brick | B | 3 | Pointing has started to deteriorate local to the top capping header course | ||||
| Cp/H | Ex | North | Z | Pedestrian Area | Walling | Natural Stone | B | 2 | Small local sections of the stone walling along the north boundary have started to break‐up | Yes | |||
| Cp/H | Ex | North | Z | Pedestrian Area | Walling | Brick | D | 2 | Capping to the small retaining wall has been dislodged along sections of one wall | ||||
| Cp/H | Ex | North | Z | Pedestrian Area | Walling | Brick | C | 2 | Small section of pointing has started to deteriorate | ||||
| Cp/H | Ex | North | Z | Vehicle Area | Street Furniture | Steel | Painted | B | 2 | Overhead light column has corrosion on the neck of the column |
| MR Ex Central Z | Main Entrance Road | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| MR | Ex | Central | Z | Item | Element | Material | Finish | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| MR | Ex | Central | Z | Vehicle Area | Roadway Surface | Macadam | B | 3 | Macadam has started to break‐up along the junction with the Main Road | ||||
| MR | Ex | Central | Z | Vehicle Area | Road Kerbs | Concrete | A | 3 | some chips/crack to Kerbs but generally satisfactory condition | ||||
| MR | Ex | Central | Z | Vehicle Area | White Lines | Painted | B | 2 | Paint has worn and may be indistinguishable is poor light and or wet conditions | ||||
| MR | Ex | Central | Z | Vehicle Area | Drainage Gullies | Steel | A | 3 | Satisfactory condition | ||||
| MR | Ex | Central | Z | Vehicle Area | Drainage Covers | Steel | A | 3 | Satisfactory condition | ||||
| MR | Ex | Central | Z | Pedestrian Area | Pathways | Macadam | A | 3 | Satisfactory condition | ||||
| MR | Ex | Central | Z | Pedestrian Area | Walling | Natural Stone | A | 3 | Satisfactory condition |
| HP Ex Central Z | Hockey Pitch (Single) | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| HP | Ex | Central | Z | Item | Element | Material | Finish | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| HP | Ex | Central | Z | Sports Area | Hardstand | Macadam | A | 3 | Surface has some settlement local to the perimeter Kerbs and undulation but remains satisfactory. There is some detritus and evidence of standing water | ||||
| HP | Ex | Central | Z | Sports Area | White Lines | Painted | A | 3 | Satisfactory condition | ||||
| HP | Ex | Central | Z | Sports Area | Drainage Gullies | Steel | A | 3 | Satisfactory condition | ||||
| HP | Ex | Central | Z | Sports Area | Drainage Covers | Steel | A | 3 | Satisfactory condition | ||||
| HP | Ex | Central | Z | Sports Area | Back Edge Kerbs | Concrete | A | 3 | Satisfactory condition | ||||
| HP | Ex | Central | Z | Sports Area | Fencing | Steel | Galvanised | C | 2 | Fencing support wires have broken at most posts, connection rings are corroding. There are gaps in the wiring on the gate and there are two posts that have moved away from the vertical |
| BGR Ex North Z | Block G Road | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| BGR | Ex | North | Z | Item | Element | Material | Finish | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| BGR | Ex | North | Z | Vehicle Area | Roadway Surface | Macadam | B | 3 | There is some tearing local to one chamber cover but generally satisfactory | ||||
| BGR | Ex | North | Z | Vehicle Area | Parking Bay Surface | Macadam | A | 3 | Satisfactory condition | ||||
| BGR | Ex | North | Z | Vehicle Area | Road Kerbs | Concrete | A | 3 | Satisfactory condition | ||||
| BGR | Ex | North | Z | Vehicle Area | White Lines | Painted | A | 3 | Satisfactory condition | ||||
| BGR | Ex | North | Z | Vehicle Area | Drainage Gullies | Steel | A | 3 | Satisfactory condition | ||||
| BGR | Ex | North | Z | Vehicle Area | Drainage Covers | Steel | A | 3 | Satisfactory condition | ||||
| BGR | Ex | North | Z | Vehicle Area | Walling | Natural Stone | A | 3 | Satisfactory condition |
| EAR Ex East Z | East Access Road | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| EAR | Ex | East | Z | Item | Element | Material | Finish | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| EAR | Ex | East | Z | Vehicle Area | Roadway Surface | Macadam | C | 1 | Macadam has broken up is several local sections | ||||
| EAR | Ex | East | Z | Vehicle Area | Hardstand | Concrete | C | 2 | Cracking is widespread | ||||
| EAR | Ex | East | Z | Vehicle Area | Drainage Covers | Steel | B | 2 | One chamber has sunk and the cover has deflected | ||||
| EAR | Ex | East | Z | Vehicle Area | Drainage Gullies | Steel | A | 3 | Satisfactory condition | ||||
| EAR | Ex | East | Z | Vehicle Area | Walling | Natural Stone | D | 2 | The cement/concrete capping to the entire boundary wall has been displaced all the way along. One section adjacent to the MUA Substation has started to collapse | ||||
| EAR | Ex | East | Z | Vehicle Area | Walling | Brick | A | 3 | Old but generally functional |
| GC Ex East Z | Groundman's Compound | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| GC | Ex | East | Z | Item | Element | Material | Finish | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| GC | Ex | East | Z | Vehicle Area | Roadway Surface | Macadam | B | 3 | |||||
| GC | Ex | East | Z | Vehicle Area | Hardstand | Concrete | C | 2 | Cracking is widespread | ||||
| GC | Ex | East | Z | Vehicle Area | Drainage Covers | Steel | A | 3 | Old but satisfactory | ||||
| GC | Ex | East | Z | Vehicle Area | Walling | Brick | A | 3 | Old but generally functional. One brick missing from the top corner of one wall | ||||
| GC | Ex | East | Z | Vehicle Area | Walling | Natural Stone | C | 2 | The cement/concrete capping to the entire boundary wall has been displaced | ||||
| GC | Ex | East | Z | Vehicle Area | Gates | Steel | Galvanised | A | 3 | Adjustment required but generally functional | Yes |
| Cp/C Ex East Z | Carpark Block C | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Cp/C | Ex | East | Z | Item | Element | Material | Finish | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| Cp/C | Ex | East | Z | Vehicle Area | Roadway Surface | Consolidated Stone | E | 2 | The consolidated stone has become pitted from continued vehicle turning, several pot‐holes and depressions are >100mm | ||||
| Cp/C | Ex | East | Z | Vehicle Area | Road Kerbs | Concrete | B | 3 | Aged in all areas with some local fractures, generally sound | ||||
| Cp/C | Ex | East | Z | Vehicle Area | Parking Bay Surface | Consolidated Stone | E | 2 | The consolidated stone has become pitted from continued vehicle turning, several pot‐holes and depressions are >100mm | ||||
| Cp/C | Ex | East | Z | Vehicle Area | Drainage Covers | Steel | B | 2 | One cover cannot be lifted, but generally functional | ||||
| Cp/C | Ex | East | Z | Vehicle Area | Gates | Steel | Galvanised | A | 3 | Adjustment required but generally functional | Yes | ||
| Cp/C | Ex | East | Z | Vehicle Area | Walling | Natural Stone | C | 2 | The cement/concrete capping to the entire boundary wall has been displaced |
| IC/N Ex North Z | Internal Courtyard (between A‐5 & E‐6) | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| IC/N | Ex | North | Z | Item | Element | Material | Finish | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| IC/N | Ex | North | Z | Limited Access Area | Hardstand | Slabs | B | 2 | Worn and uneven surface | ||||
| IC/N | Ex | North | Z | Limited Access Area | Drainage Gullies | Steel | A | 2 | Worn but functional | ||||
| IC/N | Ex | North | Z | Limited Access Area | Drainage Covers | Steel | A | 2 | Worn but functional | ||||
| IC/N | Ex | North | Z | Limited Access Area | Walling | Rendered | A | 3 | Worn but functional |
| IC/S Ex South Z | Internal Courtyard (between B‐1 & E‐1) | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| IC/S | Ex | South | Z | Item | Element | Material | Finish | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| IC/S | Ex | South | Z | Pedestrian Area | Hardstand | Slabs | B | 2 | Worn but functional | ||||
| IC/S | Ex | South | Z | Pedestrian Area | Drainage Gullies | Steel | B | 2 | Worn but functional | ||||
| IC/S | Ex | South | Z | Pedestrian Area | Drainage Covers | Steel | B | 2 | Worn but functional | ||||
| IC/S | Ex | South | Z | Pedestrian Area | Back Edge Kerbs | Concrete | B | 2 | Worn but functional | ||||
| IC/S | Ex | South | Z | Pedestrian Area | Street Furniture | Timber | A | 3 |
| IC/W Ex West Z | Internal Courtyard (between J‐3 & D‐1) | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| IC/W | Ex | West | Z | Item | Element | Material | Finish | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| IC/W | Ex | West | Z | Pedestrian Area | Hardstand | Timber | Treated | A | 3 | ||||
| IC/W | Ex | West | Z | Pedestrian Area | Pathways | Timber | Treated | A | 3 | ||||
| IC/W | Ex | West | Z | Limited Access Area | Pathways | Gravel (Loose) | A | 3 | |||||
| IC/W | Ex | West | Z | Pedestrian Area | Fencing | Timber | Treated | A | 3 | ||||
| IC/W | Ex | West | Z | Pedestrian Area | Street Furniture | Timber | Treated | A | 3 | ||||
| IC/W | Ex | West | Z | Pedestrian Area | Drainage Covers | Steel | B | 2 | Worn but functional |
| AWP Ex South Z | All weather Sports Pitch | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| AWP | Ex | South | Z | Item | Element | Material | Finish | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| AWP | Ex | South | Z | Pedestrian Area | Pathways | Macadam | A | 3 | Some weeds are present but the surface is generally sound | ||||
| AWP | Ex | South | Z | Pedestrian Area | Back Edge Kerbs | Concrete | A | 3 | Satisfactory condition | ||||
| AWP | Ex | South | Z | Pedestrian Area | Fencing | Steel | Galvanised | A | 3 | There is widespread deposits to the powder coated fencing which appears to be salts, local areas where individual wires are bent. Two panels have been removed, presumably for access. There is some local patches where the paint has delaminated from Galvanised posts. Posts along the North elevation appear to have been re‐set into the ground. Generally in sound condition | |||
| AWP | Ex | South | Z | Pedestrian Area | Street Furniture | Steel | Galvanised | A | 3 | Sports Lighting Columns ‐ There is light surface corrosion staining in some locations, the columns are in sound condition generally | |||
| AWP | Ex | South | Z | Pedestrian Area | Steps | Slabs | B | 2 | There is one broken slab at the top of three steps out of the East side gate | ||||
| AWP | Ex | South | Z | Pedestrian Area | Hardstand | Astro‐turf | A | 3 | Surface is aged but generally sound, there is some local moss growth |
| GAS Ex West Z | Gas Building | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| GAS | Ex | West | Z | Item | Element | Material | Finish | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| GAS | Ex | West | Z | Wall | Cover | Rendered | B | 3 | Aggregate loss in places | ||||
| GAS | Ex | West | Z | Wall | Doorways | Rendered | A | 3 | |||||
| GAS | Ex | West | Z | Wall | Doors | Timber | A | 3 | |||||
| GAS | Ex | West | Z | Wall | RWP Downpipes | UPVC | B | 1 | Broken downpipe connections | ||||
| GAS | Ex | West | Z | Wall | Fixings | Proprietary | A | 2 | Lights | ||||
| GAS | Ex | West | Z | Wall | Penetrations | Brick | A | 3 | Multiple airbricks | ||||
| GAS | Ex | West | Z | Roof | Cover | Mineral Felt | A | 3 | |||||
| GAS | Ex | West | Z | Roof | Eaves/Fascia | UPVC | A | 3 | |||||
| GAS | Ex | West | Z | Roof | RWP Guttering | UPVC | A | 3 |
| OIL Ex Central Z | Oil Storage Building | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| OIL | Ex | Central | Z | Item | Element | Material | Finish | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| OIL | Ex | Central | Z | Wall | Cover | Dash | B | 2 | Several cracks and patchy loss of chippings but generally serviceable | ||||
| OIL | Ex | Central | Z | Wall | Doorways | Rendered | B | 2 | Not fully sealed around the frame | ||||
| OIL | Ex | Central | Z | Wall | Doors | Timber | C | 2 | Rotting door | ||||
| OIL | Ex | Central | Z | Wall | RWP Downpipes | UPVC | A | 2 | Aged but serviceable | ||||
| OIL | Ex | Central | Z | Wall | Parapets | Dash | B | 2 | Several cracks and patchy loss of chippings but generally serviceable | ||||
| OIL | Ex | Central | Z | Wall | Fixings | Services | A | 3 | Light fitting | ||||
| OIL | Ex | Central | Z | Wall | Steps | Metal | B | 2 | Corroding metalwork | ||||
| OIL | Ex | Central | Z | Roof | Cover | Corrigated Board | A | 3 | Possibly asbestos boards | ||||
| OIL | Ex | Central | Z | Roof | Cover | Concrete | A | 3 | |||||
| OIL | Ex | Central | Z | Roof | Eaves/Fascia | Concrete | A | 3 | |||||
| OIL | Ex | Central | Z | Roof | Eaves/Fascia | Timber | B | 2 | Delaminating paint, and wood is deteriorating | ||||
| OIL | Ex | Central | Z | Roof | Soffit | Concrete | A | 3 | |||||
| OIL | Ex | Central | Z | Roof | RWP Guttering | UPVC | A | 2 | Aged but serviceable, vegetation is present | ||||
| OIL | Ex | Central | Z | Roof | Flashing | Lead | A | 3 | |||||
| OIL | Ex | Central | Z | Roof | Side Abutment | Lead | A | 3 |
| BKR Ex South Z | Block K Road / Track | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| BKR | Ex | South | Z | Item | Element | Material | Finish | Condition | Priority | Cost | Comment | Maintenance Item | Future Attention Required |
| BKR | Ex | South | Z | Vehicle Area | Roadway Surface | Consolidated Stone | E | 2 | The consolidated stone has become pitted from continued vehicle use, extensively pot‐holed and depressions are >150mm | ||||
| BKR | Ex | South | Z | Vehicle Area | Road Kerbs | Concrete | B | 3 | Kerbs to one side of the rack only are old, work but serviceable | ||||
| BKR | Ex | South | Z | Vehicle Area | Parking Bay Surface | Consolidated Stone | E | 2 | The consolidated stone has become pitted from continued vehicle turning, several pot‐holes and depressions are >100mm | ||||
| BKR | Ex | South | Z | Vehicle Area | Parking Bay Surface | Concrete | A | 3 | Generally sat | ||||
| BKR | Ex | South | Z | Vehicle Area | Drainage Gullies | Steel | B | 2 | Worn but functional | ||||
| BKR | Ex | South | Z | Vehicle Area | Drainage Covers | Steel | C | 2 | Local erosion to the consolidated stone is resulting in one cover effectively above the ground level | ||||
| BKR | Ex | South | Z | Vehicle Area | Hardstand | Concrete | A | 3 |
| Notes Survey Key: N Isle of Man Survey Maps reproduced by Mullen Consulting Ltd with the permission and under licence (No. E21714) from the Department of Infrastructure, Isle of Man Government. Unauthorised reproduction in whole or in part is prohibited. © Crown Copyright. | Revision History: | Client: Department of Education & Children Job Title: Castle Rushen High School Web: Condition Survey E-mail: Tel: © Copy | SURVEYING & CLERK OF WORKS SERVICES www.mullenconsulting.im 10A Beech House Elm Tree Road, Onchan enquiries@mullenconsulting.im Isle of Man 01624 639188 IM3 4EF right of this drawing belongs to Mullen Consulting Ltd and may not be copied without written permission | Job Number: A302 | Drawing Number: EX-01 | Revision: 0 | ||||||
| Rev | Date | By | Description | |||||||||
| Scale: NTA | ||||||||||||
| Sheet Size: ISO A3 | Drawing Title: Survey Block Location Plan | |||||||||||
| Date: May 2017 | ||||||||||||
| Drawn By: MC | ||||||||||||
| 10 20 30 40 50 | 60 70 80 90mm |
| 10 20 30 40 50 60 ISO A3 CR EX Central Z CPF EX Central Z GH EX Central Z OIL EX Central Z C a CPF Central Z Hs ig tle h S R u CPD EX West Z c s hh oe on CPH EX North Z l MR EX Central Z HP EX Central Z BGR EX North Z P EAR EX East Z la y in 10 GC EX East Z g F ie CPC EX East Z ld 20 s ICN EX North Z 30 ICS EX South Z 40 ICW EX West Z 50 GAS EX West Z 60 BKR EX South Z AWP EX South Z 70 Floodlights 80 90mm Path Tk Tk Tk Tk 6 3 Tk 12 Tk 12a 1 41 CLOSE 15 CAIRBRE Floodlights hta P 01 31 mu( Notes Survey Key: Revision History: C)lient: Rev Date By Description Dept of Education & Children N SU Job Title: Castle Rushen High School Web: www.mul Condition Survey E-mail: enquiries Isle of Man Survey Maps reproduced by Mullen Consulting Ltd with the permission and under Tel: 01624 63 licence (No. E21714) from the Department of Infrastructure, Isle of Man Government. Unauthorised reproduction in whole or in part is prohibited. © Crown Copyright. © Copyright of th 10 20 30 40 50 60 | 10 20 30 40 50 60 | 70 80 90mm check this measurement block to confirm h aec curacy of plot | |||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|
| CR EX Central Z CPF EX Central Z GH EX Central Z OIL EX Central Z C CPF Central Z a Hs ig tle CPD EX West Z h S R u c s hh oe CPH EX North Z on l MR EX Central Z HP EX Central Z BGR EX North Z EAR EX East Z P la y in GC EX East Z g F ie CPC EX East Z ld s ICN EX North Z ICS EX South Z ICW EX West Z GAS EX West Z BKR EX South Z AWP EX South Z Floodlights Path Tk Tk Tk Tk 6 3 Tk 12 Tk 12a 1 41 CLOSE 15 CAIRBRE Floodlights hta P 01 31 mu( | W e in d m ill E l S u b S ta Path W a te r T P o n d H o u s o w e r e T e n n P a C a r R is rk G C o u N rts 4 c 3 3 0 7 5 F S Car Park Po S w im m o l ing W Lodg e sthill e W estham Brownedge Lodge 14 15 Ty'r Barilwr Tk Tk Tk Derriefield 13 15a A R B s 10 7 Norwood O R Y R O A D W estham Cottage 16 21 6 Tk F A R R 17 E S OL C Tk 11 A N T P The Haven W EL A M Tk Tk A R K Ormly Tk Tk 01 Westfield 1 Fa r r a nt H o u s e | ||||||||||
| Notes Survey Key: N Isle of Man Survey Maps reproduced by Mullen Consulting Ltd with the permission and under licence (No. E21714) from the Department of Infrastructure, Isle of Man Government. Unauthorised reproduction in whole or in part is prohibited. © Crown Copyright. | Revision History: | C)lient: Dept of Education & Children SU Job Title: Castle Rushen High School Web: www.mul Condition Survey E-mail: enquiries Tel: 01624 63 © Copyright of th | Tk RVEYING & CLERK OF WORKS SERVICES lenconsulting.im 10A Beech House Elm Tree Road, Onchan @mullenconsulting.im Isle of Man 9188 IM3 4EF is drawing belongs to Mullen Consulting Ltd and may not be copied without written permission | Job Number: Dra A302 E Scale: NTS | wing Number: X-02 | Revisio 0 | |||||
| Rev | Date | By | Description | ||||||||
| Sheet Size: Dra ISO A3 E Date: May 2017 L Drawn By: CM | wing Title: xternal Ground Areas ocation Plan | ||||||||||
| 10 20 30 40 50 60 | 70 80 90mm |
| re | |
|---|---|
| edacted |
| ISLE OF MAN GOVERNMENT Geoff Moorcroft - Director of Education, Dept. of Education, Sports and Culture Richard Collister - Director of Estates, Dept. of Education, Sports and Culture Paul Slinger - Director of Projects, Department of Infrastructure Emma Killip - Project Manager Dept. of Infrastructure | CASTLE RUSHEN HIGH SCHOOL Keith Winstanley - Head Teacher Nicola Kennedy - Deputy Head Helen Almond - Assistant Head / SEND John Danielson - Head of Sixth Form / Business Manager Helen Berry - Assistant Business Manager | |||
| TURNER & TOWNSEND Darren Clegg - Associate Director Phillip Jackson - Project Manager David Moorcroft - Cost Manager | SHEPPARD ROBSON James Jones - Project Partner Rupert Goddard - Partner Jasmin Eastwood - Architect Stuart Pavitt - Architectural Assistant | |||
| Target areas per room total |
|---|
| m2 m2 m2 62 744 93 186 31 62 9 18 10 20 |
| 1,030 62 372 93 93 31 31 9 9 10 10 |
| 515 62 372 93 93 31 31 9 9 10 10 |
| 515 62 372 93 93 31 31 9 9 10 10 |
| 515 93 744 62 124 93 186 31 62 9 9 93 93 10 10 |
| 1,228 |
| form- bases |
|---|
| 37 12 6 6 6 |
| space type analysis | ||||||
|---|---|---|---|---|---|---|
| gninrael | gninrael ecruoser | nimda | egarots | laicos gninid & | sllah | yrallicna |
| Target areas per room total |
|---|
| m2 m2 m2 |
| 93 279 41 41 93 93 93 186 109 218 41 41 109 218 93 93 31 31 9 9 4 4 45 45 10 40 10 10 |
| 1,308 62 124 93 93 93 93 62 62 15 15 10 10 8 32 16 16 8 8 15 15 15 15 31 31 32 64 |
| 578 62 124 93 93 690 690 360 360 30 30 8 16 20 20 10 10 50 50 10 10 10 10 30 30 10 10 4 4 72 288 8 16 |
| 1,761 |
| form- bases |
|---|
| 37 |
| 2 1 1 2 ance |
| space type analysis | ||||||
|---|---|---|---|---|---|---|
| gninrael | gninrael ecruoser | nimda | egarots | laicos gninid & | sllah | yrallicna |
| Target areas per room total |
|---|
| m2 m2 m2 |
| 62 62 31 31 |
| 93 47 94 12 48 9 9 25 25 176 30 30 20 20 47 47 47 47 12 24 20 20 25 25 20 20 20 20 5 5 15 30 9 9 12 12 3.5 4 3.5 4 7 14 12 12 6 6 12 12 12 12 |
| 10 20 |
| 10 10 8 16 418 70 70 35 35 6 6 3 3 5 5 119 47 47 15 15 9 18 9 9 12 12 3.5 4 3.5 4 10 10 118 |
| 831 |
| form- bases |
|---|
| 37 |
| 1 |
| space type analysis | ||||||
|---|---|---|---|---|---|---|
| gninrael | gninrael ecruoser | nimda | egarots | laicos gninid & | sllah | yrallicna |
| Target areas per room total |
|---|
| m2 m2 m2 |
| 15 120 31 31 31 31 124 124 182 182 12 12 12 12 6 6 10 10 7 14 3.5 4 |
| 546 125 125 6 6 150 150 318 318 62 62 6 6 16 16 32 32 200 200 350 350 310 310 |
| 1,575 31 31 12 12 9 9 16 16 16 16 3.5 4 7 7 6 6 16 16 31 31 31 31 3.5 4 6 6 6 6 |
| form- bases |
|---|
| 37 |
| be dinin |
| space type analysis | ||||||
|---|---|---|---|---|---|---|
| gninrael | gninrael ecruoser | nimda | egarots | laicos gninid & | sllah | yrallicna |
| Target areas per room total |
|---|
| m2 m2 m2 |
| 12 12 12 0 12 12 12 12 12 0 12 12 12 12 12 12 12 0 12 24 6 6 12 12 10 10 12 12 10 10 12 12 6 6 6 6 6 6 47 47 |
| 417 9 54 1.5 12 12 12 26 156 3.5 11 7 14 |
| 259 TOTAL BRIEFED AREA 11,170 |
| 3.0% 335 25 25 10 20 25.0% 2,793 5.0% 559 TOTAL NON-NET 3,731 |
| TOTAL GROSS AREA 14,901 |
| form- bases |
|---|
| 37 |
| bove |
| space type analysis | ||||||
|---|---|---|---|---|---|---|
| gninrael | gninrael ecruoser | nimda | egarots | laicos gninid & | sllah | yrallicna |
| 4,842 43% | 1,504 13% | 857 8% | 545 5% | 728 7% | 1,602 14% | 1,038 9% |
|---|---|---|---|---|---|---|
| gninrael | gninrael ecruoser | nimda | egarots | laicos gninid & | sllah | yrallicna |
| Notional 5 form entry | 11-16 (years 7 – 11) | Post 16 (years 12 – 13) | Total |
|---|---|---|---|
| Student numbers | 750 | 250 | 1,000 |
| Net areas | 4,825m2 | 1,725m2 | 6,550m2 |
| Gross areas (GIFA) | 6,996m2 | 2,501m2 | 9,497m2 |
| BB98 baseline | 9,497m2 | Running total |
|---|---|---|
| SEN | 1,105m2 | 10,602m2 |
| Additional specialist brief | 853m2 | 11,455m2 |
| Additional sports/PE brief | 769m2 | 12,224m2 |
| Central spaces | 1,037m2 | 13,261m2 |
| Collaboration spaces | 1,379m2 | 14,640m2 |
| BENCHMARK GIFA GIFA FROM SOA | 14,640m2 14,901m2 |
| ICT Element | Funding | Procurement Process |
|---|---|---|
| Management Information System (MIS), School office equipment e.g. PC, Printer, prior to opening | DfE Project Development Grant | School choice |
| Broadband installation and first year of service in permanent and any temporary sites | DFE Capital Funding Approval Letter (broadband) | School choice after providing DFE with three quotes |
| Passive network (cabling) | DFE Capital Funding Approval Letter (construction) | DFE to manage as part of the construction project |
| Servers and network equipment | DFE Capital Funding Approval Letter (ICT) | School to procure partner supported by DFE |
| User devices, classroom AV, software and peripherals | ||
| Educational consultancy on ICT and staff training | ||
| Initial technical support | ||
| Additional costs for moving equipment from any temporary to permanent sites | ||
| On-going technical support beyond the initial period | School Budget (Revenue) | School choice |
| Technical support Ongoing software licensing Renewal and replacement | School Budget (Revenue) | School choice |
| End Q219 | DESC/Treasury agreement on scope/budget |
|---|---|
| End Q319 | Design team appointments in place |
| End Q120 | Detailed brief and feasibility scheme; D1 complete. New pitches enabling phase – construction start |
| End Q320 | I1 complete/planning submitted. New pitches enabling phase – construction complete |
| End Q121 | Planning approval |
| End Q221 | Interim I2/1st stage tender |
| End Q321 | New pitches established and playable |
| End Q421 | 2nd stage tender. I2 and I3 complete |
| End Q122 | Motion to Tynwald/construction start |
| End Q324 | Phase 1 build complete/new school open |
| End Q325 | Phase 2 demolition/externals/sports facilities completed |
| £1 2 ,935,205 £2 1 ,370,919 £3 985,289 £4 1 ,650,359 £5 2 ,117,912 £6 3 ,954 | ||||||||
|---|---|---|---|---|---|---|---|---|
| Abnormals Preliminaries Overheads & Profit Description | £ 4 ,827 £ 2 ,676 £ 380 Stanley Park | ,489 £ 2 ,254 ,534 £ 1 ,250 Archbishop ,169 £ 177 Blanch | ,731 £ 1 ,619 ,104 £ 898 ,562 £ 127 Notre Dame | ,898 £ 2 ,713 ,162 £ 1 ,504 ,627 £ 213 St Ambrose | ,330 £ 3 ,48 ,421 £ 1 ,93 ,775 £ 27 Culcheth | 2,026 £ 3 ,251 0,629 £ 1 ,845 Dean Ardwick 4,339 £ 1 ,138 School | ||
| Design fees Construction Contingency Externals FF&E Abnormals Total Develpement Cost Preliminaries Overheads & Profit Inflation to 1Q2019 Design fees ContinCgeunrcryent Location Factor FF&E | redacted | |||||||
| Total | DDeevveelloppemmeenntt | CCoosstt uplifted to Q1 20 | ||||||
| InflatiGoInF At o( m12Q)2019 CurrenDte vLeolcoaptmioenn tF -a Cctoosrt per m2 | ||||||||
| No of Pupils (nr) Development Cost uplifted to Q1 2019 | ||||||||
| Cost per pupil | ||||||||
| GIFA (m2) Development - Cost per m2 | ||||||||
| No of Pupils (nr) | ||||||||
| Cost per pupil |
| £276 |
|---|
| £376 £210 £51 Avg £ per m2 |
| dacted |
| £1 2,935,205 £2 1,370,919 £3 985,289 £4 1,650,359 £5 2,117,912 £6 3,954,375 £7 621,726 £8 1,419,699 £9 1,419,699 1£ 0 1,737,625 1£ 1 1,597 | |||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|
| Abnormals Preliminaries DescrOipvteiorhneads & Profit | £ 4,827 £ 2,676 Stanle£y P a r 3k80 | ,489 £ 2,254 ,53A4rch£b i s h 1o,p2 50 ,169Bla£n c h 177 | ,731 £ 1,619 ,104 £ 898 ,5N62otre£ D a m e127 | ,898 £ 2,713 ,162 £ 1,504 ,62S7t Am£ b r o s e213 | ,330 £ 3,482 ,421 £ 1,930 ,775Culc£h e t h 274 | ,026 £ 3,251 ,6D2e9an A£ r d w 1i,c8k4 5 ,339Sc£h o o l1,138 | ,375 £ 1,819 ,438TI£B H S 966 ,02B0lac£k b u r n 64 | ,851 £ 1,877 Eden ,17M2anc£h e s t1e,0r 65 ,166(G£ir l s ) 193 | ,818 £ 1,877 Eden ,68M0anc£h e s t1e,0r 65 ,260(B£o y s ) 193 | ,818 £ 2,857 ,D68id0sbu£r y H 1i,g5h84 ,260Sc£h o o l 225 | ,846 £ 2,627 ,493 £ 1,456 ,058La£u r u s 206 |
| ConstrDuectsiiognn fees ExternCaolsntingency AbnormFFa&lsE (per pupil) Prelimi nTaortiaesl Develpement Cost Overheads & Profit Inflation to 1Q2019 Design fees ContinCgeunrrceynt Location Factor FF&E (per pupil) | redacted 1 | ||||||||||
| Total DDeevveelloppemmeenntt CCoosstt uplifted to Q1 20 | |||||||||||
| InflatiGoInF At o( m1Q2)2019 CurrenDte vLeolcoaptmioenn tF -a cCtoosrt per m2 | |||||||||||
| No of Pupils (nr) Development Cost uplifted to Q1 2019 | |||||||||||
| Cost per pupil | |||||||||||
| GIFA (m2) Development - Cost per m2 | |||||||||||
| No of Pupils (nr) Description | |||||||||||
| Construction Cost per pupil |
| £ 5,430,569 £ 310,470 £ 2,321,854 £ 1,573,731 £ 934,159 £ 4,518,515 £ 2,520,547 £ 2,563,268 £ 3,371,845 £ 1,486 12 13 14 15 16 17 18 19 20 21 | ||||||||||
|---|---|---|---|---|---|---|---|---|---|---|
| Preliminaries Overheads & Profit Design fees Description Contingency | £ 3,010 £ 427 £ 2,653 Anderson High £ 416 | ,903 £ 511 Kings ,662 £ 354 Leadership ,727 £ 565 Warrington ,596 £ 5 28,41 | ,130 £ 1,287 ,584 £ 182 Archbishop ,613 £ 1,134 Beck 9.25 £ 178 | ,365 £ 872 ,932 £ 123 ,725 £ 769 Sandymoor ,128 £ 120 | ,533 £ 1,836 ESLA ,933 £ 592 (Academy of ,027 £ 1,960 St Nicholas ,726 £ 927 | ,356 £ 2,505 ,660 £ 355 St Ninian's - ,314 £ 2,208 IOM ,376 £ 346 | ,227 £ 1,397 ,837 £ 198 City Academy ,038 £ 1,231 Norwich ,629 £ 193 | ,482 £ 1,421 ,495 £ 201 ,702 £ 1,252 Waingels ,359 £ 196 | ,168 £ 1,869 ,860 £ 265 Oasis ,579 £ 1,647 Academy ,636 £ 258 | ,472 £ 824 ,536 £ 117 ,702 £ 726 Campsmount ,665 £ 114 |
| Construction FF&E Externals Total Abnormals Preliminaries Inflation Overheads & Profit Design fees Current Location Factor Contingency FF&E | redacted | |||||||||
| Q1 2019, Location factor 1 - Total Total | ||||||||||
| GIFA (m2) Inflation Construction (Building) - Cost per m2 Current Location Factor | ||||||||||
| No of Pupils (nr) Q1 2019, Location factor 1 - Total | ||||||||||
| Cost per pupil GIFA (m2) Construction (Building) - Cost per m2 | ||||||||||
| No of Pupils (nr) | ||||||||||
| Cost per pupil |
| Castle Rushen High School | ||
|---|---|---|
| Base 1Q2019 329 Start on Site 1Q2022 374 | ||
| Budget Estimate Location Factor I | OM: 1.15 | |
| GIA (m2): 1 4,901 March 2019 Pupils (No): 1 ,000 | ||
| Rev A | ||
| CRHS School Project | ||
| A benchmarking exercise has been undertaken to determine the potential costs for constructing the new Castle Rushen High School. Turner & Townsend have worked with the UK DfE for a number of years and have completed many projects on their behalf. A selection of 21 Schools have been reviewed to produce this document, with 6 specific schools highlighted as 'Precedent' examples given their alignment to Client expectations. Typical Build Costs for the proposed Castle Rushen High School Scheme based on Precedent Schools are detailed below. From the data analysed there is a circa 8% uplift against the Typical Build Cost based on All Schools to achieve current design expectations. An inflation assessment to 1Q 2022 has been included below as an extra over sum. The Precedent schools contained a high overall percentage of abnormal costs which in having reviewed the site data for the proposed site we do not consider would be appropriate to allocate at the same percentage. | ||
| Typical Build Costs Based on Precedent Schools £/m2 £/m2 | ||
| 1Q 2019 Benchmarking Precedent Cost Split Proposed Castle Rushen Split | ||
| redacted redacted Construction Externals Abnormals Abnormal allowance reduced Preliminaries Overheads & Profit Design fees Contingency FF&E (Fixtures Fitting & Equipment) (per pupil) Total Typical Build Costs redacted |
| Castle Rushen High School | ||
|---|---|---|
| Base 1Q2019 329 Start on Site 1Q2022 374 | ||
| Budget Estimate Location Factor I | OM: 1.15 | |
| GIA (m2): 1 4,901 March 2019 Pupils (No): 1 ,000 | ||
| Rev A | ||
| CRHS School Project | ||
| Inflation to 1Q 2022 redacted Total Typical UK Build Costs (including inflation), UK Mean redacted Add Isle of Man indexation @ 15% redacted Cost per m2 redact ed Cost per pupil redacte d | ||
| General Notes: Allowance based on £/m2 of GIA Benchmarking allowance based on UK Mainland projects TPI index rate used to bring benchmark cost in line with current day Includes Isle of Man Indexation factor at 15% as advised Benchmark data used based on UK Mainland School cost data supplied by Sheppard Robson / Turner & Townsend The Precedent schools are those referred to in the Sheppard Robson Outline Brief Excluded Legal costs, Surveys, Sales & Marketing Costs, Local authority fees & charges. Base date 1Q2019 - Advised by client Forecasted Start on Site date 1Q2022 Abnormals are included at 10% of the Build & External Works Costs Excluded VAT FF&E allowance increased to £2,000 / pupil as referenced in the wider document This estimate excludes the new playing field on the land that has been gifted, which is progressing as a separate enabling works project |
| Target areas per room total |
|---|
| m2 m2 m2 |
| 62 744 |
| 93 186 |
| 31 62 9 18 10 20 |
| 1,030 |
| 62 372 |
| 93 93 |
| 31 31 9 9 10 10 |
| 515 |
| 62 372 |
| 93 93 |
| 31 31 9 9 10 10 |
| 515 62 372 |
| 93 93 |
| 31 31 9 9 10 10 |
| 515 93 744 |
| 62 124 |
| 93 186 |
| 31 62 9 9 93 93 10 10 |
| 1,228 |
| Reduction 1 Omit Hydrotherapy moo moor r .oN rep latot |
|---|
| m2 m2 m2 |
| 12 62 744 |
| 2 93 186 |
| 2 31 62 2 9 18 2 10 20 |
| 1,030 |
| 6 62 372 |
| 1 93 93 |
| 1 31 31 1 9 9 1 10 10 |
| 515 |
| 6 62 372 |
| 1 93 93 |
| 1 31 31 1 9 9 1 10 10 |
| 515 6 62 372 |
| 1 93 93 |
| 1 31 31 1 9 9 1 10 10 |
| 515 8 93 744 |
| 2 62 124 |
| 2 93 186 |
| 2 31 62 1 9 9 1 93 93 1 10 10 |
| 1,228 |
| Reduction 2 Omit Enhanced PE moo moor r .oN rep latot |
|---|
| m2 m2 m2 |
| 12 62 744 |
| 2 93 186 |
| 2 31 62 2 9 18 2 10 20 |
| 1,030 |
| 6 62 372 |
| 1 93 93 |
| 1 31 31 1 9 9 1 10 10 |
| 515 |
| 6 62 372 |
| 1 93 93 |
| 1 31 31 1 9 9 1 10 10 |
| 515 6 62 372 |
| 1 93 93 |
| 1 31 31 1 9 9 1 10 10 |
| 515 8 93 744 |
| 2 62 124 |
| 2 93 186 |
| 2 31 62 1 9 9 1 93 93 1 10 10 |
| 1,228 |
| Reduction 3 Omit enhanced central spaces moo moor r .oN rep latot |
|---|
| m2 m2 m2 |
| 12 62 744 |
| 2 93 186 |
| 2 31 62 2 9 18 2 10 20 |
| 1,030 |
| 6 62 372 |
| 1 93 93 |
| 1 31 31 1 9 9 1 10 10 |
| 515 |
| 6 62 372 |
| 1 93 93 |
| 1 31 31 1 9 9 1 10 10 |
| 515 6 62 372 |
| 1 93 93 |
| 1 31 31 1 9 9 1 10 10 |
| 515 8 93 744 |
| 2 62 124 |
| 2 93 186 |
| 2 31 62 1 9 9 1 93 93 1 10 10 |
| 1,228 |
| Reduction 4 Omit additional specialist moo moor r .oN rep latot |
|---|
| m2 m2 m2 |
| 12 62 744 |
| 2 93 186 |
| 2 31 62 2 9 18 2 10 20 |
| 1,030 |
| 6 62 372 |
| 1 93 93 |
| 1 31 31 1 9 9 1 10 10 |
| 515 |
| 6 62 372 |
| 1 93 93 |
| 1 31 31 1 9 9 1 10 10 |
| 515 6 62 372 |
| 1 93 93 |
| 1 31 31 1 9 9 1 10 10 |
| 515 8 93 744 |
| 0 62 0 |
| 2 93 186 |
| 2 31 62 1 9 9 1 93 93 1 10 10 |
| 1,104 |
| Target areas per room total |
|---|
| m2 m2 m2 |
| 93 279 41 41 |
| 93 93 |
| 93 186 109 218 41 41 109 218 |
| 93 93 |
| 31 31 9 9 4 4 |
| 45 45 10 40 |
| 10 10 |
| 1,308 62 124 93 93 93 93 |
| 62 62 |
| 15 15 10 10 8 32 16 16 8 8 15 15 15 15 31 31 32 64 |
| 578 |
| 62 124 |
| 93 93 690 690 |
| 360 360 |
| 30 30 8 16 20 20 10 10 50 50 10 10 10 10 |
| 30 30 |
| 10 10 4 4 |
| 72 288 |
| 8 16 |
| 1,761 |
| Omit Hydrotherapy moo moor r .oN rep latot |
|---|
| m2 m2 m2 |
| 3 93 279 1 41 41 |
| 1 93 93 |
| 2 93 186 2 109 218 1 41 41 2 109 218 |
| 1 93 93 |
| 1 31 31 1 9 9 1 4 4 |
| 1 45 45 4 10 40 |
| 1 10 10 |
| 1,308 2 62 124 1 93 93 1 93 93 |
| 1 62 62 |
| 1 15 15 1 10 10 4 8 32 1 16 16 1 8 8 1 15 15 1 15 15 1 31 31 2 32 64 |
| 578 |
| 2 62 124 |
| 1 93 93 1 690 690 |
| 1 360 360 |
| 1 30 30 2 8 16 1 20 20 1 10 10 1 50 50 1 10 10 1 10 10 |
| 1 30 30 |
| 1 10 10 1 4 4 |
| 4 72 288 |
| 2 8 16 |
| 1,761 |
| Omit Enhanced PE moo moor r .oN rep latot |
|---|
| m2 m2 m2 |
| 3 93 279 1 41 41 |
| 1 93 93 |
| 2 93 186 2 109 218 1 41 41 2 109 218 |
| 1 93 93 |
| 1 31 31 1 9 9 1 4 4 |
| 1 45 45 4 10 40 |
| 1 10 10 |
| 1,308 2 62 124 1 93 93 1 93 93 |
| 1 62 62 |
| 1 15 15 1 10 10 4 8 32 1 16 16 1 8 8 1 15 15 1 15 15 1 31 31 2 32 64 |
| 578 |
| 1 62 62 |
| 1 93 93 1 690 690 |
| 0 360 0 |
| 1 30 30 2 8 16 1 20 20 1 10 10 1 50 50 1 10 10 1 10 10 |
| 1 10 10 |
| 1 10 10 1 4 4 |
| 4 38 152 |
| 2 8 16 |
| 1,183 |
| Omit enhanced central spaces moo moor r .oN rep latot |
|---|
| m2 m2 m2 |
| 3 93 279 1 41 41 |
| 1 93 93 |
| 2 93 186 2 109 218 1 41 41 2 109 218 |
| 1 93 93 |
| 1 31 31 1 9 9 1 4 4 |
| 1 45 45 4 10 40 |
| 1 10 10 |
| 1,308 2 62 124 1 93 93 1 93 93 |
| 1 62 62 |
| 1 15 15 1 10 10 4 8 32 1 16 16 1 8 8 1 15 15 1 15 15 1 31 31 2 32 64 |
| 578 |
| 2 62 124 |
| 1 93 93 1 690 690 |
| 1 360 360 |
| 1 30 30 2 8 16 1 20 20 1 10 10 1 50 50 1 10 10 1 10 10 |
| 1 30 30 |
| 1 10 10 1 4 4 |
| 4 72 288 |
| 2 8 16 |
| 1,761 |
| Omit additional specialist moo moor r .oN rep latot |
|---|
| m2 m2 m2 |
| 2 93 186 0 41 0 |
| 1 93 93 |
| 1 93 93 1 109 109 0 41 0 1 109 109 |
| 1 93 93 |
| 1 31 31 1 9 9 1 4 4 |
| 1 34 34 2 10 20 |
| 1 10 10 |
| 791 2 62 124 1 93 93 1 93 93 |
| 1 62 62 |
| 1 15 15 1 10 10 4 8 32 1 16 16 1 8 8 1 15 15 1 15 15 1 31 31 2 32 64 |
| 578 |
| 2 62 124 |
| 1 93 93 1 690 690 |
| 1 360 360 |
| 1 30 30 2 8 16 1 20 20 1 10 10 1 50 50 1 10 10 1 10 10 |
| 1 30 30 |
| 1 10 10 1 4 4 |
| 4 72 288 |
| 2 8 16 |
| 1,761 |
| BB103 teaching spaces moo moor r .oN rep latot |
|---|
| m2 m2 m2 |
| 3 93 279 1 41 41 |
| 1 93 93 |
| 2 93 186 2 109 218 1 41 41 2 109 218 |
| 1 93 93 |
| 1 31 31 1 9 9 1 4 4 |
| 1 45 45 4 10 40 |
| 1 10 10 |
| 1,308 2 62 124 1 93 93 1 93 93 |
| 1 62 62 |
| 1 15 15 1 10 10 4 8 32 1 16 16 1 8 8 1 15 15 1 15 15 1 31 31 2 32 64 |
| 578 |
| 1 55 55 |
| 1 93 93 1 690 690 |
| 1 360 360 |
| 1 30 30 2 8 16 1 20 20 1 10 10 1 50 50 1 10 10 1 10 10 |
| 1 30 30 |
| 1 10 10 1 4 4 |
| 4 72 288 |
| 2 8 16 |
| 1,692 |
| Omit all collaborative space moo moor r .oN rep latot |
|---|
| m2 m2 m2 |
| 3 93 279 1 41 41 |
| 1 93 93 |
| 2 93 186 2 109 218 1 41 41 2 109 218 |
| 0 93 0 |
| 1 31 31 1 9 9 1 4 4 |
| 1 45 45 4 10 40 |
| 1 10 10 |
| 1,215 2 62 124 1 93 93 1 93 93 |
| 0 62 0 |
| 1 15 15 1 10 10 4 8 32 1 16 16 1 8 8 1 15 15 1 15 15 1 31 31 2 32 64 |
| 516 |
| 2 62 124 |
| 1 93 93 1 690 690 |
| 1 360 360 |
| 1 30 30 2 8 16 1 20 20 1 10 10 1 50 50 1 10 10 1 10 10 |
| 1 30 30 |
| 1 10 10 1 4 4 |
| 4 72 288 |
| 2 8 16 |
| 1,761 |
| Target areas per room total | |
|---|---|
| m2 m2 m2 | |
| 62 62 31 31 | |
| 93 47 94 12 48 9 9 25 25 otal 176 30 30 20 20 47 47 47 47 12 24 20 20 25 25 20 20 20 20 5 5 15 30 9 9 12 12 3.5 4 3.5 4 7 14 12 12 6 6 12 12 12 12 10 20 10 10 8 16 al 418 | |
| 70 70 35 35 6 6 3 3 5 5 | |
| Hydro sub-t | otal 119 |
| Omit Hydrotherapy moo moor r .oN rep latot |
|---|
| m2 m2 m2 |
| 1 62 62 1 31 31 |
| 93 2 47 94 4 12 48 1 9 9 1 25 25 SC1+2 sub-total 176 1 30 30 1 20 20 1 47 47 1 47 47 2 12 24 1 20 20 1 25 25 1 20 20 1 20 20 1 5 5 2 15 30 1 9 9 1 12 12 1 3.5 4 1 3.5 4 2 7 14 1 12 12 1 6 6 1 12 12 1 12 12 2 10 20 1 10 10 2 8 16 SC3 sub-total 418 |
| 0 70 0 0 35 0 0 6 0 0 3 0 0 5 0 |
| Hydro sub-total 0 |
| Omit Enhanced PE moo moor r .oN rep latot |
|---|
| m2 m2 m2 |
| 1 62 62 1 31 31 |
| 93 2 47 94 4 12 48 1 9 9 1 25 25 SC1+2 sub-total 176 1 30 30 1 20 20 1 47 47 1 47 47 2 12 24 1 20 20 1 25 25 1 20 20 1 20 20 1 5 5 2 15 30 1 9 9 1 12 12 1 3.5 4 1 3.5 4 2 7 14 1 12 12 1 6 6 1 12 12 1 12 12 2 10 20 1 10 10 2 8 16 SC3 sub-total 418 |
| 1 70 70 1 35 35 1 6 6 1 3 3 1 5 5 |
| Hydro sub-total 119 |
| Omit enhanced central spaces moo moor r .oN rep latot |
|---|
| m2 m2 m2 |
| 1 62 62 1 31 31 |
| 93 2 47 94 4 12 48 1 9 9 1 25 25 SC1+2 sub-total 176 1 30 30 1 20 20 1 47 47 1 47 47 2 12 24 1 20 20 1 25 25 1 20 20 1 20 20 1 5 5 2 15 30 1 9 9 1 12 12 1 3.5 4 1 3.5 4 2 7 14 1 12 12 1 6 6 1 12 12 1 12 12 2 10 20 1 10 10 2 8 16 SC3 sub-total 418 |
| 1 70 70 1 35 35 1 6 6 1 3 3 1 5 5 |
| Hydro sub-total 119 |
| Omit additional specialist moo moor r .oN rep latot |
|---|
| m2 m2 m2 |
| 1 62 62 1 31 31 |
| 93 2 47 94 4 12 48 1 9 9 1 25 25 SC1+2 sub-total 176 1 30 30 1 20 20 1 47 47 1 47 47 2 12 24 1 20 20 1 25 25 1 20 20 1 20 20 1 5 5 2 15 30 1 9 9 1 12 12 1 3.5 4 1 3.5 4 2 7 14 1 12 12 1 6 6 1 12 12 1 12 12 2 10 20 1 10 10 2 8 16 SC3 sub-total 418 |
| 1 70 70 1 35 35 1 6 6 1 3 3 1 5 5 |
| Hydro sub-total 119 |
| Omit all collaborative space moo moor r .oN rep latot |
|---|
| m2 m2 m2 |
| 1 62 62 1 31 31 |
| 93 2 47 94 4 12 48 1 9 9 1 25 25 SC1+2 sub-total 176 1 30 30 1 20 20 1 47 47 1 47 47 2 12 24 1 20 20 1 25 25 1 20 20 1 20 20 1 5 5 2 15 30 1 9 9 1 12 12 1 3.5 4 1 3.5 4 2 7 14 1 12 12 1 6 6 1 12 12 1 12 12 2 10 20 1 10 10 2 8 16 SC3 sub-total 418 |
| 1 70 70 1 35 35 1 6 6 1 3 3 1 5 5 |
| Hydro sub-total 119 1 47 47 1 15 15 2 9 18 1 9 9 1 12 12 1 3.5 4 1 3.5 4 1 10 10 SC4 sub-total 118 |
| 831 |
| Target areas per room total |
|---|
| m2 m2 m2 |
| 15 120 31 31 |
| 31 31 |
| 124 124 182 182 12 12 12 12 6 6 10 10 7 14 3.5 4 |
| 546 125 125 6 6 |
| 150 150 318 318 62 62 |
| 6 6 16 16 32 32 |
| 200 200 |
| 350 350 310 310 |
| 1,575 31 31 12 12 9 9 16 16 16 16 3.5 4 7 7 6 6 16 16 31 31 31 31 3.5 4 6 6 6 6 |
| Omit Hydrotherapy moo moor r .oN rep latot |
|---|
| m2 m2 m2 |
| 8 15 120 1 31 31 |
| 1 31 31 |
| 1 124 124 1 182 182 1 12 12 1 12 12 1 6 6 1 10 10 2 7 14 1 3.5 4 |
| 546 1 125 125 1 6 6 |
| 1 150 150 1 318 318 1 62 62 |
| 1 6 6 1 16 16 1 32 32 |
| 1 200 200 |
| 1 350 350 1 310 310 |
| 1,575 1 31 31 1 12 12 1 9 9 1 16 16 1 16 16 1 3.5 4 1 7 7 1 6 6 1 16 16 1 31 31 1 31 31 1 3.5 4 1 6 6 1 6 6 |
| Omit Enhanced PE moo moor r .oN rep latot |
|---|
| m2 m2 m2 |
| 8 15 120 1 31 31 |
| 1 31 31 |
| 1 124 124 1 182 182 1 12 12 1 12 12 1 6 6 1 10 10 2 7 14 1 3.5 4 |
| 546 1 125 125 1 6 6 |
| 1 150 150 1 318 318 1 62 62 |
| 1 6 6 1 16 16 1 32 32 |
| 1 200 200 |
| 1 350 350 1 310 310 |
| 1,575 1 31 31 1 12 12 1 9 9 1 16 16 1 16 16 1 3.5 4 1 7 7 1 6 6 1 16 16 1 31 31 1 31 31 1 3.5 4 1 6 6 1 6 6 |
| Omit enhanced central spaces moo moor r .oN rep latot |
|---|
| m2 m2 m2 |
| 8 15 120 1 31 31 |
| 1 31 31 |
| 1 124 124 1 182 182 1 12 12 1 12 12 1 6 6 1 10 10 2 7 14 1 3.5 4 |
| 546 1 125 125 1 6 6 |
| 0 150 0 1 200 200 1 35 35 |
| 1 6 6 1 16 16 1 32 32 |
| 0 200 0 |
| 1 250 250 1 125 125 |
| 795 1 31 31 1 12 12 1 9 9 1 16 16 1 16 16 1 3.5 4 1 7 7 1 6 6 1 16 16 1 31 31 1 31 31 1 3.5 4 1 6 6 1 6 6 |
| Omit additional specialist moo moor r .oN rep latot |
|---|
| m2 m2 m2 |
| 8 15 120 1 31 31 |
| 1 31 31 |
| 1 124 124 1 182 182 1 12 12 1 12 12 1 6 6 1 10 10 2 7 14 1 3.5 4 |
| 546 1 125 125 1 6 6 |
| 1 150 150 1 318 318 1 62 62 |
| 1 6 6 1 16 16 1 32 32 |
| 1 200 200 |
| 1 350 350 1 310 310 |
| 1,575 1 31 31 1 12 12 1 9 9 1 16 16 1 16 16 1 3.5 4 1 7 7 1 6 6 1 16 16 1 31 31 1 31 31 1 3.5 4 1 6 6 1 6 6 |
| BB103 teaching spaces moo moor r .oN rep latot |
|---|
| m2 m2 m2 |
| 8 15 120 1 31 31 |
| 1 31 31 |
| 1 124 124 1 182 182 1 12 12 1 12 12 1 6 6 1 10 10 2 7 14 1 3.5 4 |
| 546 1 125 125 1 6 6 |
| 1 150 150 1 318 318 1 62 62 |
| 1 6 6 1 16 16 1 32 32 |
| 1 200 200 |
| 1 350 350 1 310 310 |
| 1,575 1 31 31 1 12 12 1 9 9 1 16 16 1 16 16 1 3.5 4 1 7 7 1 6 6 1 16 16 1 31 31 1 31 31 1 3.5 4 1 6 6 1 6 6 |
| Omit all collaborative space moo moor r .oN rep latot |
|---|
| m2 m2 m2 |
| 8 15 120 1 31 31 |
| 0 31 0 |
| 1 124 124 1 182 182 1 12 12 1 12 12 1 6 6 1 10 10 2 7 14 1 3.5 4 |
| 515 1 125 125 1 6 6 |
| 1 150 150 1 318 318 1 62 62 |
| 1 6 6 1 16 16 1 32 32 |
| 0 200 0 |
| 1 350 350 1 310 310 |
| 1,375 1 31 31 1 12 12 1 9 9 1 16 16 1 16 16 1 3.5 4 1 7 7 1 6 6 1 16 16 1 31 31 1 31 31 1 3.5 4 1 6 6 1 6 6 |
| Target areas per room total |
|---|
| m2 m2 m2 |
| 12 12 12 0 12 12 12 12 12 0 12 12 12 12 12 12 12 0 12 24 6 6 12 12 10 10 12 12 10 10 12 12 6 6 6 6 6 6 47 47 |
| 417 ve) 9 54 1.5 12 12 12 26 156 3.5 11 7 14 |
| 259 TOTAL BRIEFED AREA 11,170 |
| 3.0% 335 25 25 10 20 25.0% 2,793 5.0% 559 TOTAL NON-NET 3,731 |
| TOTAL GROSS AREA 14,901 |
| Omit Hydrotherapy moo moor r .oN rep latot |
|---|
| m2 m2 m2 |
| 1 12 12 0 12 0 1 12 12 1 12 12 0 12 0 1 12 12 1 12 12 1 12 12 0 12 0 2 12 24 1 6 6 1 12 12 1 10 10 1 12 12 1 10 10 1 12 12 1 6 6 1 6 6 1 6 6 1 47 47 |
| 417 6 9 54 8 1.5 12 1 12 12 6 26 156 3 3.5 11 2 7 14 |
| 259 TOTAL BRIEFED AREA 11,051 |
| 3.0% 332 1 25 25 2 10 20 25.0% 2,763 5.0% 553 TOTAL NON-NET 3,692 |
| TOTAL GROSS AREA 14,743 |
| NET REDUCTION 119 |
| GROSS REDUCTION 158 |
| Omit Enhanced PE moo moor r .oN rep latot |
|---|
| m2 m2 m2 |
| 1 12 12 0 12 0 1 12 12 1 12 12 0 12 0 1 12 12 1 12 12 1 12 12 0 12 0 2 12 24 1 6 6 1 12 12 1 10 10 1 12 12 1 10 10 1 12 12 1 6 6 1 6 6 1 6 6 1 47 47 |
| 417 6 9 54 8 1.5 12 1 12 12 6 26 156 3 3.5 11 2 7 14 |
| 259 TOTAL BRIEFED AREA 10,592 |
| 3.0% 318 1 25 25 2 10 20 25.0% 2,648 5.0% 530 TOTAL NON-NET 3,540 |
| TOTAL GROSS AREA 14,132 |
| NET REDUCTION 578 |
| GROSS REDUCTION 769 |
| Omit enhanced central spaces moo moor r .oN rep latot |
|---|
| m2 m2 m2 |
| 1 12 12 0 12 0 1 12 12 1 12 12 0 12 0 1 12 12 1 12 12 1 12 12 0 12 0 2 12 24 1 6 6 1 12 12 1 10 10 1 12 12 1 10 10 1 12 12 1 6 6 1 6 6 1 6 6 1 47 47 |
| 417 6 9 54 8 1.5 12 1 12 12 6 26 156 3 3.5 11 2 7 14 |
| 259 TOTAL BRIEFED AREA 10,390 |
| 3.0% 312 1 25 25 2 10 20 25.0% 2,598 5.0% 520 TOTAL NON-NET 3,474 |
| TOTAL GROSS AREA 13,864 |
| NET REDUCTION 780 |
| GROSS REDUCTION 1,037 |
| Omit additional specialist moo moor r .oN rep latot |
|---|
| m2 m2 m2 |
| 1 12 12 0 12 0 1 12 12 1 12 12 0 12 0 1 12 12 1 12 12 1 12 12 0 12 0 2 12 24 1 6 6 1 12 12 1 10 10 1 12 12 1 10 10 1 12 12 1 6 6 1 6 6 1 6 6 1 47 47 |
| 417 6 9 54 8 1.5 12 1 12 12 6 26 156 3 3.5 11 2 7 14 |
| 259 TOTAL BRIEFED AREA 10,529 |
| 3.0% 316 1 25 25 2 10 20 25.0% 2,632 5.0% 526 TOTAL NON-NET 3,520 |
| TOTAL GROSS AREA 14,049 |
| NET REDUCTION 641 |
| GROSS REDUCTION 853 |
| BUDGET ESTIMATE: FEASIBILITY OPTIONS REPORT | |
|---|---|
| Option 1 Omit Hydrotherapy Cost | |
| 1 Construction redacted 2 Externals £0 3 Abnormals £0 4 Preliminaries redacte d 5 Overheads & Profit redact ed 6 Design Team Fees redacte d 7 Contingency reda cted 8 Inflation (Based Date to Start on Site) redacte d Development Saving UK Mean - Sub Total redacted | |
| Development Saving IOM - Sub Total | redacted |
| GIA Effect -119 m2 |
| BUDGET ESTIMATE: FEASIBILITY OPTIONS REPORT | |
|---|---|
| Option 2 Omit Enhanced PE Cost | |
| 1 Building Elements redacted 2 External Works £0 3 Abnormal Costs £0 4 Preliminaries redacte d 5 Overheads & Profit redact ed 6 Design Team Fees redacte d 7 Contingency reda cted 8 Inflation (Based Date to Start on Site) redacte d Development Saving UK Mean - Sub Total redacted | |
| Development Saving IOM - Sub Total | redacted |
| GIA Effect -578 m2 |
| BUDGET ESTIMATE: FEASIBILITY OPTIONS REPORT | ||||||||
|---|---|---|---|---|---|---|---|---|
| Option 3 Omit Enhanced Central Spaces Cost | ||||||||
| 25% Reduction 50% Reduction 75% Reduction 100% Reduction 1 Building Elements redacted 2 External Works £0 £0 £0 £0 3 Abnormal Costs £0 £0 £0 £0 4 Preliminaries redacted ) 5 Overheads & Profit redacted ) 6 Design Team Fees redacted ) 7 Contingency redacted ) 8 Inflation (Based Date to Start on Site) redacted ) Development Saving UK Mean - Sub Total redacted ) | ||||||||
| Development Saving IOM - Sub Total | redacted | ) |
| BUDGET ESTIMATE: FEASIBILITY OPTIONS REPORT | |||||||
|---|---|---|---|---|---|---|---|
| Option 4 Omit additional specialist teaching areas Cost | |||||||
| 25% Reduction 50% Reduction 75% Reduction 100% Reduction 1 Building Elements redacted 2 External Works £0 £0 £0 £0 3 Abnormal Costs £0 £0 £0 £0 4 Preliminaries redacted ) 5 Overheads & Profit redacted ) 6 Design Team Fees redacted ) 7 Contingency redacted ) 8 Inflation (Based Date to Start on Site) redacted ) Development Saving UK Mean - Sub Total redacted ) | |||||||
| Development Saving IOM - Sub Total | redacted | ) | |||||
| GIA Effect -160 m2 -321 m2 -481 m2 -641 m2 |
| BUDGET ESTIMATE: FEASIBILITY OPTIONS REPORT | |
|---|---|
| Option 5 Omit BB103 sized teaching spaces Cost | |
| 1 Building Elements redacted 2 External Works £0 3 Abnormal Costs £0 4 Preliminaries redacte d 5 Overheads & Profit redact ed 6 Design Team Fees redacte ) d 7 Contingency reda cted 8 Inflation (Based Date to Start on Site) redacte d Development Saving UK Mean - Sub Total redacted | |
| Development Saving IOM - Sub Total | redacted |
| GIA Effect -378 m2 |
| BUDGET ESTIMATE: FEASIBILITY OPTIONS REPORT | |||||||
|---|---|---|---|---|---|---|---|
| Option 6 Omit collaborative teaching spaces Cost | |||||||
| 25% Reduction 50% Reduction 75% Reduction 100% Reduction 1 Building Elements redacted ) 2 External Works £0 £0 £0 £0 3 Abnormal Costs £0 £0 £0 £0 4 Preliminaries redacted ) 5 Overheads & Profit redacted ) 6 Design Team Fees redacted ) 7 Contingency redacted ) 8 Inflation (Based Date to Start on Site) redacted ) Development Saving UK Mean - Sub Total redacted | |||||||
| Development Saving IOM - Sub Total | redacted | ) | |||||
| GIA Effect -259 m2 -519 m2 -778 m2 -1037 m2 |
| PPrrioiorr t too M Mititigigaattioionn | PPoosstt M Mititigigaattioionn | ||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| RRisiskk | RRisiskk D Deessccrirpiptitoionn/ / | PProrobbaabbiliiltiyty | ImImppaacctt | RRisiskk R Raatitningg | AAcctitoionn | AAcctitoionn | PProrobbaabbiliiltiyty | ImImppaacctt | RRisiskk R Raatitningg | ||||||
| RRisiskk I DID | CCaateteggooryry | TTitiltele | NNaarrraratitvivee | CCoonnsseeqquueenncceess R | Risiskk O Owwnneerr | SSttaattuuss | (1(1 - -5 5)) | (1(1 - -5 5)) | AAuutotoCCaall | MMitiitgigaatitningg A Acctitoionn | OOwwnneerr | DDaatete/ /U Uppddaatete P PMM | (1(1 - -5 5)) | (1(1 - -5 5)) | AAuutotoCCaall |
| 11 | SStrtarateteggicic | AAccaaddeemmicic SStrtarateteggyy | AAccaaddeemmicic S Strtarateteggyy nnoot ts suuppppoortretedd | PProrojejecct td deelalayyeedd o or r ccaanncceellleledd | CClileienntt | OOppeenn | 11 | 55 | 55 | AAccaaddeemmicic S Strtarateteggyy i sis b beeiningg sstrterennggththeenneedd t oto a addddreressss B BCC | 0011//0044//22001199 | 11 | 33 | 33 | |
| 22 | SStrtarateteggicic | PProrojejecct t SSppoonnssoorr | CChhaannggeess t oto P Prorojejecct t SSppoonnssoorr | PProrojejecct tl olosseess ssppoonnssoorsrshhipip ththrorouugghh i ninteternrnaal l ggoovveernrnaannccee pprorocceessss | CClileienntt | OOppeenn | 33 | 33 | 99 | EEnnssuurere r eregguulalar rP Prorojejecct tE Exxeecc mmeeeetitninggss a arere h heeldld, ,e eaarlryly aappppooinintmtmeenntsts f ofor rm meeeetitninggss t oto bbee p puut ti nin d diaiarireiess | 0011//0044//22001199 | 22 | 22 | 44 | |
| 33 | SStrtarateteggicic | AAccaaddeemmicic SStrtarateteggyy | AAccaaddeemmicic S Strtarateteggyy isis n noot tr ereaalilsiseedd | PProrojejecct tB Beenneefiftists n noot t rereaalilsiseedd | CClileienntt | OOppeenn | 33 | 44 | 1122 | BBeenneefiftists P Plalann t oto b bee d deevveeloloppeedd cc//ww m meeaassuurarabblele a anndd t itmimee-- ccoonnsstrtarainineedd o ouutctcoommeess | 0011//0044//22001199 | 2P2roject | - C33astle | Rus6h6en Hi | |
| 44 | MMaannaaggeemmeenntt | DDeefifninitiitoionn | PPoooor rt rtarannsslalatitoionn o of f AAccaaddeemmicic S Strtarateteggyy t inintoto p phhyyssicicaal ls sppaaccee rereqquuirieremmeenntsts | BBuuilidldiningg i sis o ovveer ro or r uunnddeer rs sizizeedd htheererefoforere i mimppaacctitningg oonn o oppeeraratitoionnss aanndd//oor rf ifninaanncceess | CClileienntt | OOppeenn | 44 | 44 | 1166 | AAccaaddeemmicic s sppaaccee r ereqquueesststs nneeeedd c chhaalllelenngginingg a anndd ccoonnvveertretedd i nintoto a ann A Arereaa SScchheedduulele t oto i ninfoformrm d deessigignn | 0011//0044//22001199 | 33 | 44 | 1122 | |
| 55 | MMaannaaggeemmeenntt | FFuunncctitoionnaall | FFaailiulurere t oto s saatitsisfyfy ppeerfroformrmaannccee eexxppeecctatatitoionnss o of f fafacciliiltiyty. . | CCoommpprorommisiseedd ooppeeraratitoionnss | CClileienntt | OOppeenn | 22 Date: April | 22 2019 | 44 t Rev | UUnnddeertratakkee s suufffifcicieiennt t sstatakkeehhooldldeer re ennggaaggeemmeennt t hthrorouugghh b brireiefifningg a anndd d deessigignn ssitsatioagngeess.. B | 0011//0044//22001199 | 11 | 22 Prior | 22 to Mitigatio | |
| 66 | MMaannaaggeemmeenntt | LLaatete CCoommppleletitoionn | DDeelalayy t oto a aggrereeedd ccoonnsstrturucctitoionn pproroggrarammmmee reressuultlitningg i nin d deelalayyeedd hhaannddoovveer rd daatete | DDeelalayyeedd ooppeeraratitoionnaal ls statatutuss | CClileienntt | OOppeenn | 22 Risk ID | 33 Category | 66 Risk t Title | CCoonntitninggeennccyy p plalannss t oto b bee ddeevveeloloppeedd a anndd c coonntitninggeennccyy ppeeriroiodd t oto b bee a alllolowweedd w witihthinin Risk Description/ hthee p proroggrarammmmee Co Narrative | nsequenc | 0011//0044//22001199 es Risk Owner | 11 Pr Status | obab33ility | Impa3c3t Ris |
| 77 | MMaannaaggeemmeenntt | PProroggrarammmmee | UUnnaabblele t oto a acchhieievvee SSeepptetemmbbeer r2 2002244 ooppeenniningg | DDeefeferrreredd o or rp paartr t ooppeenniningg d duuee t oto ddeelalayyss w witihth aappppooinintitningg d deessigignn teteaamm | CClileienntt | OOppeenn | 22 1 | 55 Strategic | 1A10c0ademif Strategyt | MMaainintatainin p proroggrarammmmee d daatetess cof or ra appAppcooainidntemtmmeiencn tS to tofr afd tdeeesgsiygig nn Proj eteaamm. . not supported P | ect delaye cancelled roject los | d o00r1 1//0044//22001199 Client es | 22 Open | (1 - 5) 33 1 | (1 - 5) A 66 5 |
| 88 | MMaannaaggeemmeenntt | InInteternrnaal l aapppprorovvaalsls | FFaailiulurere t oto p proroggreressss ggaatetewwaayyss t hthrorouugghh ggoovveernrnaannccee a anndd aapppprorovvaal ls syysstetemm t oto ssuuppppoortr tr ereqquuirieredd pproroggrarammmmee | DDeelalayy | CClileienntt | OOppeenn | 2 44 | Strategic 55 | Project Sponsor 2200 r Academi | s Changes to Project thr AAggrereee p prorogSgrparaommnmsmoere a anndd t htheenn g DDEESSCC i ninteternrnaal la apppprorovvaalsls ereqquuirieredd t oto s suuppppoortr tt hthisis c Academic Strategy Proje | ponsorshi ough inter overnanc process ct Benefit | p nal Client e 0011//0044//22001199 s not | Open 33 | 3 55 | 3 1155 |
| 99 | LLeeggaall | CCoonnsstrturucctitoionn ccoonntrtaracctt | RReedduucceedd a abbiliiltiyty t oto ininppuut ti nintoto b buuilidldiningg ccoonntrtaracct ta anndd ccoonnsstrturucctitoionn t eteaamm | RReedduucceedd d deessigignn ininflfulueennccee | CClileienntt | OOppeenn | 3 22 | Strategic 22 | Strategy 44 | is not realised SSeeeekk c clalarirtiyty i nin e eaarlryly l eleggaal l nneeggootitaiatitoionnss Buil Poor translation of | realised ding is ov | Client 0011//0044//22001199 er or | Open 22 | 3 22 | 4 44 |
| 1100 | FFininaanncciaiall | AAfffofordrdaabbiliiltiyty | PProrojejecct ti sis n noot t aafffofordrdaabblele w witihthinin aalllolotetedd f ufunnddiningg eennvveeloloppee | PProrojejecct tr ere--ssccooppeedd, , ddeelalayyeedd o or r ccaanncceellleledd | CClileienntt | OOppeenn | 4 M 55 | anagemen 55 | t Definitio l 2255 | u EEnnggaagAgecemamdeeennmt tw iwci tiShtht rA aActcaeadgdeyem micic n there eleaadd a iannndtod d pdehessyigisgnicn at etle asampma tc oteo o eennssuurere r erreeqqquuuiriierreemmmeeetntnnstss a arere an cchhaalllelennggeedd a anndd e exxppeecctatatitoionnss mmaannaaggFeeaddilure to satisfy | nder size fore impa n operatio d/or finan | d cting Client ns 0011//0044//22001199 ces | Open 44 | 4 55 | 4 2200 |
| RRRiiRssRRiskkiiisks s k kk | DRRiRiirRssRReiskkiciisks s tDDk kk D pee DDDessreosececsjcsrsreciirccppcrirrptittiipiipp toocitttoninoiiooon//s n nn/t /s// | (1 - 5) PPPrrPooPPrrobbrrooobaabbbabbabaaiilblbbiiitltiiiiylytlliiiytttyyy | (1 - 5) IImmImIIIpmpmmpaapppaccacatatctccttt | AutoCal RRRiiRssRRiskkiiisks s RRk kkR aa RRRattiaitaannitttngigiinnngggg | Appropriate budget setting | AAAccAAActticitccooitttoniniiooon nnn | AAAccAAActticitccooitttoniniiooon nnn | (1 - 5) PPPrrPooPPrrobbrrooobaabbbabbabaaiilblbbiiitltiiiiylytlliiiytttyyy | (1 - 5) IImmImIIIpmpmmpaapppaccacatatctccttt | AutoCal RRRiiRssRRiskkiiisks s R Rk kk R aa R R Rattiaitaannitttngigiinnngggg | |||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| RRRiiRssRRiskkiiisks s IIkD kkDI D IIIDDD 11 | CCCaaCCCatteaetaaegtgttegeeoogggorroyyoorryrryyy Financial | CapTTiTtiitTtaTTillteieliilt ttelclleeeosts | hNNiNagaNNNarrharrraaeaarrrrrrattrriai taavvtitttheveiiivevvaeeen budgeted Indirect project | ICCnCoocCCConrnoeoonssnannseessesqsqeeqeeuuq qqueeiunuuenne neeccDnnnceecEecscseSseesssC RR capital budget | RiiRRsRsiiskkiisssk kOOkk O wwOOOwwnnwwneennnerreeer Client | rSrrSSttSSSaattattttaauauttuttssuuussss Open | 2 ((11(1 ( ((--1 11 -5 5 ---5)) 5)55))) | 4 ((11(1 ( ((--1 11 -5 5 ---5)) 5)55))) | 8 AAAuuAAAuttooutuuoCCtttoCooaaCCCallalaalll | MMMiiMtMMtiiitgigiiitttgaiaiigggattiaitaannitttngigiinnng AgAgg A cc AAActticitccooitttoniniiooonnnn and contingency required to allow for unforeseen costs Early negotiations to support | OOOwwOOOwnnwwwneennnerrereerrr | DDDaaDDDatt0eaetaae/t1/tt eU/eeU/ /0U// pp UUU4pddp/ppdaad2ddatteae0taae t 1ttPPe ee9P MM PPPMMMM | 2 ((11(1 ( ((--1 11 -5 5 ---5)) 5)55))) | 3 ((11(1 ( ((--1 11 -5 5 ---5)) 5)55))) | 6 AAAuuAAAuttooutuuoCCtttoCooaaCCCallalaalll |
| 12 111111111111 | Financial FFFiinFnFiFniaaiinnnannaaanccnnniciaaciccaliliiaaallll | Revenue costs CCCaaCCCappaaapiipttppiaatiiitalltt a aalcc lllo co cocscsootostssstsststtsss | DDDiiDrcrDDieeoriiireccrrseteecttc stccppt tt prhr poopprirgojjrroeeoohjjeccjjeeteectrc tcc cct ttto coh cocscsaootostnssstsst s tts ss hhhiihggbhhigihhuiigggheedhhherrge eertter rrhh tt thaeatthhhandnaaan nnn bbbuubbbudduuudggdddgeegggetteeeeetteddtteeedddd | Higher long term IInnIInccIInnnrcrfcieerccnreaarreaeeassanaeasesce ss eieiee nn i ni c iinDDnn o D E sEDDDEtSSEsEESCCSSSC CCC ccacacacpcpaaapiipttppiaatiiitalltt a aalbb lll buu bbbudduuudggdddgeegggetteeetttt | Client CCCllCiiCCleeillelniniieeenttnnntttt | Open OOOppOOOpeepppenneeennnn | 2 222222 | 4 444444 | 8 A 888888 aa aa | appropriate budget setting, AAppAAAppppppprrpoopprropprroooprrpiippraarirratitiiaeeaatte ttebbee buu bbbudduuudggdddgeegggette eetsst tte se setsstetteetiittnntttittniggiinnng ggg contingency and monitoring annaaanddnnnd dccdd o co cocncnooonttniinntnntittniggiinnngeegggenneeenccnnnycycy cc yrryy ee r reqqrreeequuqqquiiurruuieeriiireddrreeed dttdd oo t to ttooo thereof alllalaaloolllolwlwllooow wwwff oo f forrffo ooruur rr unn uuunffnoonnfforrffoeeoorressrreeeeseseesseeeeenneeen nccnn o co cocscsootostssstsststtsss | 01/04/2019 000110001//10011//044//0004//42244//200//2220110001991119999 | 2 222222 | 3 333333 | 6 666666 | |
| 111221112222 13 | FFFiinFnFiFniaaiinnnannaaanccnnniciaaciccaliliiaaallll Financial | RRReeRRRevveeeveevvvenneeenuunnnueeuuue eccee o co cocscsootostssstsststts Equipment Costs | IInnIInddIInnndiidrrddieeriiireccrreteectc tccppt tt prr poopprrojjrroeeoojjeccjjeteectc tcct tt ssRccocoiscocscskootost ssstssot s tthfsh ss hiie hgghhisgihhiigcggheeahhherrle aeerttr trrhh ti thoaatthhhannnaaan ninn n fit obubbuutb bbuddauuudggndddgeedgggett eeeeetbteddtteeeedsdddpoke | Increased project cHHoHiiHsggHHitgihhiigsgghee hhhwerre eerillr toorr lh onlnllo oonggpnnng ogttgg tee t eterrttenmmeerrmtrrm i mma l fffiifonnfiffrniaaiin nnannianaanccnsnneceuce cc eccfee fo coi ccocscsoiotostessstssntsttstss standard or | CCCllCiiCCleeillelniniieeenttnnntttt Client | OOOppOOOpeepppenneeen nnn Open | 222222 3 | 444444 2 | EE aa 888888 cc 6 tt | EaaEEEarrallaaryyrlrry l llynnyy nee nnneggeeegoogggottoiiootaatittatitiiaiiaatootittoniniiooonssnnn s tst ssoo t to ttossoo u su sussppuuupppppppooppporrottoor rtrrt tt appaaappppppprrpoopprropprroooprrpiippraarirratitiiaeeaatte ttebbee buu bbbudduuudggdddgeegggette eetsst tte se setsstetteetiittnntttittniggiinnng,,g gg,, ,, ocDococncneooontttniinntenntittrniggiimnnngeegggenineneenccnennycyc y cc wyaayy anhn aaandadnnndt dm mdd e m moqommonunoooniiintptnniootimiitorrttoiioorennrirrnniggiintnng ggg i s hhtntheettehhherreeeeeerdreoorreeeeoffodooff fffrom the design | 000110001//10011//044//0004//42244//200//2220110001991119999 01/04/2019 | 222222 2 | 333333 2 | 666666 4 | |
| 111331113333 14 | FFFiinFnFiFniaaiinnnannaaanccnnniciaaciccaliliiaaallll Financial | EEEqqEEEquuqqquiiuppuuipimmiipppmmeemmenneeenttn nntt tt CCCooCCCossootostssstsststtsss Affordability | equipment costs cc RRRiiRssRRikskiiisk ss kookk off o oofeef ff ess eceescsacasscaclclaaaaalatltllaiiaatootittoniniiooon niinn nn i ni iinnn Extent ofsite ffiifttfi fftiooiit tt ouu ooouttu uutaat tt ann aaanddnnnd dbbdd bee bbbessepeespspssoopppokkoookeekkke eee remediation and eeeqqeeequuqqquiiuppuuipimmiipppmmeemmenneeenttn nntcct tto co cocscsootostssstsststtsss service diversion costs included in the | quantity of IInnIeInccIInqnnrcruceerccreiaarrpeeeassmaaeasesedssdeeeed ndppdd t prr pooppurrojjrrsoeeoojejeccjjedteectc . tcc t tt ocococscsootostssstsst s ttwsw ss w iiwtwwtihhtiiith tthpphh poo pppottoeeoottenntteeenttniinntaatittalilii a aal l ffoofforrffo ooriir nnrr i nissiinnnususussffuffuufiiffccfffifficiieiiecicceniniieeenttn nntt tt sststsaatsstannttaaanddnnndaadddarraddaarrd rrdoodd orr o oorr rr Reduction in qqquuqqquaauuuannaaanttniinnttttiyytttiiity ttyooyy off o ooff ff construction eeeqqeeequuqqquiiuppuuipimmiipppmmeemmenneeenttn nntuut tt uss uuuesesedssdeeed..d dd.. .. budget | ll CCCllCiiCCleeillelniniieeenttnnntttt Client | OOOppOOOpeepppenneeen nnn Open | 333333 4 | 222222 5 | 666666 nn 20 | DDDeeDDDetteeeeetterrttemmeerrmrrmiimmnninieeiinnne ewwee w hhwwwhaahhhatta aateet tt eqq eeequuqqquiiuppuuipimmiipppmmeemmenneeenttn nntiit sstt i s iiis neennneeeeeeeddeeedeedddeddeeed dffdd rr f oofrffrommrrooomm mmtt hh t theetthhhe eddee dee dddesseieesiggsissginniigggn nnn Appropriate budget setting and contingency required to allow for unforeseen costs | ss | 000110001//10011//044//0004//42244//200//2220110001991119999 01/04/2019 | 222222 3 | 222222 5 | 444444 15 |
| 111441114444 15 | FFFiinFnFiFniaaiinnnannaaanccnnniciaaciccaliliiaaallll Commercial | AAAffAffAAfoFofffffoirrffnoddoorradaarrdnddabbacaabiibllibbiiialtitiiilylyltli iityttyyy cc capacity | project are not EEExxEEExttxaeexxttecnntteceenttnu nntoot rtt offa ossooftifsieffttsisseetiiite tteee rreerremmrreeemmeemmeddeeediidaaddiatitiiaiiaatootittoniniiooon naann ann aaanddnnnd ddd sseseserssrevveerrviirrcvcvvieceiiice cc eddee dii dvvddiveieiivvverresseerrisirroosissoniniiooon nnn Lack of internal ocococscsootostssstsst s ttisi ssnn i nicciinnnlcluuclcculddlluuudeedddeddeeed diidd nn i ni iinttnn hh t theetthhhe e Financial capacity ppprrpoopprrojjrroeeoojjeccjjeteectc tccaat tt arr aeeaarre rrennee noo nnnotto oott tt aaaccaacacccucucccuccrruaauurrattrraeeaattetteee | RRReeRRReddeeeduuddduccuuutctciitccootittoniniiooon niinn nn i ni iinnn Delays in ccocococncnooonssnnntstsrrtssuutrttruccrruuutctciitccootittoniniiooon nnn ee financials/ bbbuubbbudduuudggdddgeegggetteeetttt negotiation process | CCCllCiiCCleeillelniniieeenttnnntttt Client | OOOppOOOpeepppenneeennnn Opem | 444444 3 | 555555 4 | A 222002220000 aa 12 aa | AAppAAAppppppprrpoopprropprroooprrpiippraarirratitiiaeeaatte ttebbee buu bbbudduuudggdddgeegggette eetsst tte se setsstetteetiittnntttittniggiinnng ggg annaaanddnnnd dccdd o co cocncnooonttniinntnntittniggiinnngeegggenneeenccnnnycycy cc yrryy ee r reqqrreeequuqqquiiurruuieeriiireddrreeed dttdd oo t to ttooo Appoint external support alllalaaloolllolwlwllooow wwwff oo f forrffo ooruur rr unn uuunffnoonnfforrffoeeoorressrreeeeseseesseeeeenneeen nccnn o co cocscsootostssstsststtsss | 000110001//10011//044//0004//42244//200//2220110001991119999 01/04/2019 | 333333 2 | 555555 4 | 111551115555 8 | |
| 11115511156555 | CCMCooCCCaommonoommmmammmgmeemmeerremcceerricirraaceiccalilniiaaaltlll | FFFiinFnFiFniaaiinnnannaaanccnnniciaaciccalilii a aal lll Definition ccacacacpcpaaapaapppaccaaiacittciccyytiiityttyyy | Staff requirements LLLaaLaLLccaakackck cc kookk off o oofiif nnff i nittiineenntterrttenneerrnaarrnnnall a aal lll exceed space FFFiinFnFiFniaaiinnnannaaanccnnniciaaciccalilii a aalcc llla ca cacpcpaaapaapppaccaaiacittciccyytiiityttyyy allocated in design | BuDiDlDdeeDDDiellnaeaeelgaylylla aayssdy yys iosi ssnn ie ni iinsnn no meeffiitfnnf iffniraaiinennannaqaanccnunniciaaciiccraliliisaesaal/s/lmlls /ss/ e// nts nnneeannneggneeegoogdggotto iiootiaatsittatit iiaiiauatootittnoniniiodoon nppenn prrr poopp rsroccrroioeocezcesccseeseessdsssss | CCCCllCiiCClleeiilleelniniieeennttnnnttttt ss | OOOOppOOOpeeppppemmeeeemnmmm | 3343333 | 4454444 | 11212211102222 A | Challenge staff requirements early in the design process to AAppAAApppppppoopppoiinonooinittiin nnteet tt exx eeexttxeexxtterrttenneerrnaarrnnnall a aalss lllu su sussppuuupppppppooppporrottoorrtrrttt ensure they are met within the building design | 00001100011//10011///0044//00044//42244///2200//2220011000119911199999 | 2232222 | 4454444 | 88185888 | |
| OOOOppOOOpeeppppemmeeeemnmmm | |||||||||||||||
| 11116611176666 | MMMMaaMMMaannaaannaannnaaggaaaggeegggeemmeeemmmeemmeenneeennttnnnttttt | DDPDreeDoDDeffegiieefnnfirffniiiaiinttnniimitiooiitittoninmiiooonnenn | SSSCttSaaSStotaffttnaffaaf tffrrffrf ffee ra reqqrrceeequutqoqquiiurrruuieersiiiremm rredeemmeeommenn eneenttnssonntt s ttts ss buyeee xxeieexccnxexxcetcoeecceeeee ddepeed drssdd op sp sgpssaaprppaccaaaeacecme cc eee m e aaalllalaaloolllolclcllooaocacactctaeeaattedddtteeeda diidd tnn ie ni iinsddnn dee dddesseieesiggsissginniigggnnnn | Agreement of BBBuuBBBuiiulluuiddliidiliilldnnddiniggiinnng gddgg doo dddoeeoooesse ees nsn ss noo nnno ooo contract is delayed mmmmeemmeeeeeeette eetrrt ttee r reqqrreeequuqqquiiurruuieeriiiremmrreeemmeemmenneeenttnssnntt s tts ss and opening is aaannaaanddnnnd diidd ss i s iiiusu ss unn uuunddnnndeeddderre eerssr rri si zzsissezeiiizedzzdeeedddd delayed | CCCCllCiiCClleeiilleelniniieeennttnnnttttt | OOOOppOOOppeepppeenneeenn nnn | 4434444 | 5545555 | C ee 22120022220000 ee tt | CEChhCCCahaahrhhallllalaalyeelllel nlnlleeeenggnnnngeegggge eassee t stg saatssetaffttmaffaaf ffrrfffe ffee r n reqqrreteequu qqqwuiiurruuieieritiiremmhrreeem meemmenneeenttnssnntt s tts ss ceaaeoeearrallnaaryyrlsrry l llytiiyy nnr i cni iinttunn hh tt theeitthohhe enddee de e dpddesseaieesiggsrissgitnniignggn npepnn prrr posopprr occrrtooeoceocesccs eseesss s sstst ssoo t to tto eenneeennssnnnussusuussrrueeuurrree rrettee hh t tpheetthhrheyyeoeey ygaayy arrr aeaeaarre m rremmee mm meemmettee eet wwt dtt w iaiwtwwtithhtieiithiitthnsnhhi ni iinnn hhattheettrhhhee ebbee rbuu bebbuiiulaluuiddlilidiliiilldnsndditniggiininngc gddgg dee dddesseieesiggsissginniigggnnnn | oo | 00001100011//10011///0044//00044//42244///2200//2220011000119911199999 | 3323333 | 5545555 | 1115581115555 |
| 11117711187777 | MMMaaMMMannFaaanaainnnnaggaaaageegnggemmeceemmieemmaennleeenttnnntttt | PPAPrrPoofPPrfroggrroooogrrrgaaggrdrammrraaaambmmmmmimlmeiemmteyeeeb | Increased costs due CCCooCCConnotoonttonrrnnt aatrtvtraccrraaatactcrootccitorrattossoortr s irrdsdo ss doon dddo sonnoo n/oo n nnotto oott tt bbcuubhbbuyyuauuy yiinyy nn i g nittiinooenntto sttoppoo prrr peoopprroqggrrooogurrgaaggrerammrrsaaamtmmmemmmdmeemm e /e maddrdaakdddatteaeeaatttess tteceessosssts | AAAggAAAgrrgeeggrreeerreeeemmeeemmeemmenneeenttn nntoot tt off o ooff ff ccocococncnooonttnrrnntaatrttraccrraatactc tcciit sstt i s iiidsd ss dee dddellaeaeelaylyllaaayeeyyyeddeeed ddd ee Project over spent aaannaaanddnnnd doodd opp ooopeepppenneeeniinnnnniniggiinnng giigg ss i s iiis ss dddeedddellaeaeelaylyllaaayeeyyyeddeeedddd | CCCCllCiiCClleeiilleelniniieeennttnnnttttt | OOOOppOOOppeepppeenneeenn nnn | 3333333 | 4445444 | EE cc 11112211125222 ee aa | EaaEEEarrallaaryyrlrry l llyeeyy enn eeenggnnngaagggaggaaageegggemmeeemmeemmenneeenttn nntwwt tt w iiwtwwtihhtiiith tthhh Manage expectations and ocococncnooonssnnntstsrrtsscctrttrucurrcuccttuiiuutootittoniniiooon nppnn paa ppparrattaarnnrtrrtneettnnnerresseerr s rrtst ssoo t to ttooo perform VE exercises when enneeenssnnnususussrrueeuurre rre ee pp prr poopprroggrrooogrrgaaggrrammrraaammmmmmmmeemme eddee daa dddattaeeaattesstte ees s ss required arraeeaarre rrerree ee r reaarreeealliaiaalssiltlsltiiisiitsscctittciiiccc | 00001100011//10011///0044//00044//42244///2200//2220011000119911199999 | 2223222 | 4444444 | 88182888 | |
| 111881118888 19 | FFFiinFnFiFniaaiinnnannaaanccnnniciaaciccaliliiaaallll Management | AAAffAffAAfooffffforrffoddoorrdaarrdddabbaaabiibllbbiiiltitiiilyyltliiityttyyycc Design | increasing IInnIInccIInnnrcrceerccreaarreeeassaaeasesedssdeeed dccdd o co cocscsootostssstsst s ttdsd ss duu dddueeuuue eee ttootto ttovvoo vaa vvvarraiiaaraarirratitiiaiiaatootittoniniiooonssnnn s /s/ ss / / // hchNchccaahohhannataangg nnngfeeguggesset ees ursr sseer r reeqqrre eequupqqqueeruuuessoeteestoseetssftedditteneed d//gdd / / mmmmaammtarhrakkaarerkeerr kkkedtte eetecct ttso co ciocscsgootostnssstsst s tts ss iinninicciinnnrcrceerccreaarreeeassaaiasinnsissniggiinnngggg | Project //PP PrrPooPPrrojjrrroeeoojejeccjjqeteectuc tccoot ittr ovv oeooveevmvverre eeressr rrnp sp spssetepsppenne eenttnnntttt become unaffordable | CCCllCiiCCleeillelniniieeenttnnntttt Client | OOOppOOOpeepppenneeennnn Open | 333333 3 | 555555 4 | 111551115555 pp 12 rr | Ensure the building has the MMMaaMMMannaaanaannnaggaaageeggge eeeee exx eeexppxxxpeepppecceteectcaatcctattttaiiaatootittoniniiooonssnnn s asa ss ann aaanddnnnd ddd functionality for future peeppperreffeeroorfrrforrffommoorrmrrm mmVV VEE VVVE EeeEE exx eeexeexxxerrecceerricirrsscicceseiiisesssse ees wsw ss w hhwwwheehhhenneeen nnn expansion of infrastructures eerreqqrreeequuqqquiiurruuieeriiireddrreeedddd rather than provide it as a | 000110001//10011//044//0004//42244//200//2220110001991119999 01/04/2019 | 333333 3 | 444444 3 | 111221112222 9 | |
| 111991119999 20 | MMMaaMMMannaaanaannnaggaaageegggemmeeemmeemmenneeenttnnntttt Strategic | DDDeeDDDesseieesiggsissginniigggnnnn Stakeholders | Definition and NNNooNNNottco ootofft uttu fn futtfffuuuuutirturrttmueeuurre rraeppee t prr ipoopporrooornrooooff oiiooofnnfifffnigg iinnng ggg tthhtrtheettohhhe leddeee dee sdddess eaieesiggsnissginniidgggn nnn responsibilities of | PPPrrPooPPrrojjrroeeoojjeccjjeteectc tcct tt Dirrreeerreqqcrreeeqtuuqiqquiiourruuineeriiire mmrreieemsmeemm uenneeennttnssnntct s lttse ss a r and bbdbeebebbeccecoeecoicocmscmooiomomeemmne esee are noutu unnmuuunaanannaffaffdaafooffeffforrffo,ddoor rdaarrrdeddabbasaabllbeeubblelllleteeing | CCCllCiiCCleeillelniniieeenttnnntttt Client | OOOppOOOpeepppenneeennnn Open | 333333 4 | 444444 4 | EE ff 111221112222 ee 16 rr bb | base line EnnEEEnssnnnususussrrueeuurre rrettee hh t theetthhhe ebbee buu bbbuiiulluuiddliidiliilldnnddiniggiinnng ghhgg haa hhhassaa as tst sshh t theetthhhe eee uuffunnffuuunccnnntctciitccootittoniniiooonaannnalliaiaalttilyyltliiity ttyffyy oo f forrffo oorffr rruu f futtffuuuuutturrttueeuurre rreee Agree a PEP early in the exxeeexppxxxpaapppannaaanssnnnisioosissoniniiooon noonn off o oofiif nnff i niffiinrrnnfaafrffrassrraatastsrrtssuutrttruccrruuutctcuutccturrttueeuurressrre ees s ss project. Set up a Project aarrattrrahhaattheetthhherre eerttr rrhh t thaatthhhannaaan nppnn prr poopprrovvrroooviidvdvvidieeiiddde eiiee tt i tiaaiit tt ass aa as asa ss a aaa Executive to identify and baabbbassaaeasese ss ellee ii lnn illnlieeiinnneeee | 000110001//10011//044//0004//42244//200//2220110001991119999 01/04/2019 | 333333 3 | 333333 4 | 999999 12 | |
| 222002220000 21 | SSSttSrrSStaatrttrattrraeeaatteggtteeegiigccggiciiiccc Strategic | SSSttSaaSSttakkttaaakeekkkehheeehoohhholldodooldleellddderresseerrsrrsss Masterplan | stakeholders is not DDDeeDDDeffeiieefnnfiaffniiiiintgtnniiitirooiitiettoniniioeoon ndaann ann aaanddnnnd ddd ccocococncnooonffniinnfrrfimmffriiirmrrmaammattaiiaatootittoniniiooon noonn off o ooff ff rroorrollrreoeooleslslle ees asa ss ann aaanddnnnd ddd rreerressrrepeespspssooppponnooonssnnnisibbsissbiiiiibllbbiiiltitiiiliiltlieeiitittesisiie ees oso ss off o ooff ff n Planning approval is sststsaatsstakkttaaakeekkkehheeehoohhholldodooldleellddderresseerr s rrisi ssss i s iiinsn ss noo nnnotto oott tt not achieved aaaggaaagrrgeeggrreeerreeeeddeeedddd | in project delays DDDiiDrrDDieeriiireccrreteectciitccootittoniniiooon niinn ss i s iiiusu ss unn uuunccnnnlcleeclccealalleeearra aarr aaannaaanddnnnd ddddd dee dddecceieecissciccisiioiiosissoniniiooonssnnn s asa ss arr aeeaarre rreee nnoonnnotto ootmmt tt m maammaddaaadeeddde,,e ee,rr, ,,ee r ressrreueesususslluttuuliitlnnlltittniggiinnng g iiPnninri iinpopnn prjr peoopprrcojjrroeetooj jeccjjietesectc tccddtd tt deee dddelllaeaaeelaylyyllaaaysseyyysdsss | rr CCCllCiiCCleeillelniniieeenttnnntttt gg Client | OOOppOOOpeepppenneeennnn Open | 444444 2 | 444444 5 | A pp 111661116666 EE 10 aa | agree R&Rs AAggAAAgrrgeeggrreeerreeee eaaee a aPPaa PEE PPPEPPEEEP PeePP eaa eeearrallaaryyrlrry l llyiiyy nn i ni iinttnn hh t theetthhhe eee Early engagement with prrpoopprrojjrroeeoojjeccjjeteectc..tcc t.tStS. .. See SSSette eetuut tt upp uuup paapp a aPPaa Prr PooPPrrojjrroeeoojjeccjjeteectc tcct tt planners to enusre buy in to ExxEEExeexxxecceueecucuccttuiiuutvvtittveieiivvve ettee oo t to ttoiioo dd i dieeiidddenneeenttniinntfftiyyttfiiify ffyaayy ann aaanddnnnd ddd the scheme and any aggaaagrrgeeggrreeerreeee eRRee R&& RRR&RR&&&RssRRRssss concerns (eg rights of light | 000110001//10011//044//0004//42244//200//2220110001991119999 01/04/2019 | 333333 2 | 444444 4 | 111221112222 8 | |
| 222112221111 | SSSttSrrSStaatrttrattrraeeaatteggtteeegiigccggiciiiccc | MMMaaMMMassaatastseetssterrtteppeerrpllrrpaapplanlnllaaannnn | PPPllaPaPPlanlnllaaannnnnnniinnnnniniggiinnng gaagg app aaappppppprrpoopprrovvrrooovaavvvall a aalii lssll i s iiis nnnoonnnotto ootaat tt acc aahachchcciiheehhieviviieeeveevvveddeeedddd | ss PPPrrPooPPrrojjrroeeoojjeccjjeteectc tcciit sstt i s iiidsd ss dee dddellaeaeelaylyllaaayeeyyyeddeeedddd | CCCllCiiCCleeillelniniieeenttnnntttt | OOOppOOOpeepppenneeennnn | 222222 | 555555 | EE pp tt 111001110000 cc tt aa | to neighbouring properties) EaaaEEErarraellaaryyr lrrya l llyeeyy d enn deeenggrnnngaaegggaggsaaagseegeggemmedeemmee mmiennneeentt n nnttwwth tt w eiiwtwwti hhtidiith ttehhh s ign pllpaapplanlnllaaannnnnnneennnerresseerr s rrtst ssoo t to ttoeeoo enn eeenuunnnussuuursrseerssre rrebbee buu bbbuyyuuuy yiiyy nn i ni iinttnn oo t to ttooo hhttheetthhhe essee c sc shchsschcceehhhemmeeemmeemme eaaee ann aaanddnnnd daadd ann aaanyynnny yyy ocococncnooonccnnnececerccrenneerrnssrrnnn s (s( ssee ( (egg((eeeg grrgg ii rgg rirrgihhiiggghtthsshhtt s ttoso ss off o oofllf iiff lgg illglihhiiggghtth hhtt tt ootto ttonnoo nee nnneiigegeeigihhiiggghbbhhhboobbbouuooourruiiuurnnrirrniggiinnng gppgg prr poopprropprrooopeeppperretteeriirterretittesisiie)ees)s )ss) )) arraeeaarre rreaaee add aaadddddddrrdeeddrressrreseesssesesssedssdeeed diidd nn i ni iinttnn hh t theetthhhe eddee dee dddesseieesiggsissginniigggnnnn | 000110001//10011//044//0004//42244//200//2220110001991119999 | 222222 | 444444 | 888888 |
| RRRRRiiiisssisskkkkk | RRRRRiiiisssisskkkkk DDD DDeeeeessssscccccrrrririiipppippttttitiiioooioonnnnn//// / | PPPPPrrrroroooobbbbbaaaaabbbbbiiiillliliiilitttitytyyyy | IIIImmmImmpppppaaaaacccccttttt | RRRRRiiiisssisskkkkk RRR RRaaaaattttitiiinnninnggggg | AAAAAcccccttttitiiioooioonnnnn | AAAAAcccccttttitiiioooioonnnnn | PPPPPrrrroroooobbbbbaaaaabbbbbiiiillliliiilitttitytyyyy | IIIImmmImmpppppaaaaacccccttttt | RRRRRiiiisssisskkkkk R R R R Raaaaattttitiiinnninnggggg | ||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| RRRRRiiiisssisskkkkk III IDDDIDD | CCCCCaaaaatttteteeeegggggooooorrrryryyyy | TTTTTiiiitttitltllleeelee | NNNNNaaaaarrrrrrrrraraaaattttitiiivvvivveeeee | CCCCCooooonnnnnssssseeeeeqqqqquuuuueeeeennnnnccccceeeeesssss R | RRRRiiiisisssskkkkk O OOOOwwwwwnnnnneeeeerrrrr | SSSSStttttaaaaatttttuuuuusssss | ((((1(1111 --- - - 555 55))))) | ((((1(1111 --- - - 555 55))))) | AAAAAuuuuuttttoootooCCCCCaaaaalllll | MMMMMiiiitttititiiigggiggaaaaattttitiiinnninnggggg AAA AAcccccttttitiiioooioonnnnn | OOOOOwwwwwnnnnneeeeerrrrr | DDDDDaaaaatttteteeee//// / UUU UUpppppdddddaaaaatttteteeee PPP PPMMMMM | ((((1(1111 --- - - 555 55))))) | ((((1(1111 --- - - 555 55))))) | AAAAAuuuuuttttoootooCCCCCaaaaalllll |
| 2222222222 | CCCCCooooommmmmmmmmmeeeeerrrrcrcccciiiiaaaiaalllll | PPPPPrrrroroooocccccuuuuurrrrereeeemmmmmeeeeennnnnttttt | AAAAAgggggrrrrereeeeeeeeemmmmmeeeeennnnntttt t o ooooffff f aaaaappppppppppoooooiiiinnninnttttmtmmmmeeeeennnnntttt t mmmmmeeeeetttththhhhoooooddddd i iiisssiss d ddddeeeeellllaaalaayyyyyeeeeeddddd | AAAAAppppppppppoooooiiiinnninnttttmtmmmmeeeeennnnntttt t o ooooffff f t ttththhhheeeee dddddeeeeesssssiiiigggiggnnnnn t ttteteeeeaaaaammmmm a aaaannnnnddddd mmmmmaaaaaiiiinnninn c ccccooooonnnnnttttrtrrraraaaacccccttttotoooorrrr r dddddeeeeellllaaalaayyyyyeeeeeddddd a aaaannnnnddddd ppppprrrroroooojjjjejeeeeccccctttt t d ddddeeeeellllaaalaayyyyyeeeeeddddd | CCCCClllliiilieeeieennnnnttttt | OOOOOpppppeeeeennnnn | 44444 | 44444 | 1111166666 t | EEEEEaaaaarrrrlrlllyyylyy e eeeennnnngggggaaaaagggggeeeeemmmmmeeeeennnnntttt t w wwwwiiiitttiththhhh l llleeeleegggggaaaaallll l aaaaannnnnddddd p pppprrrroroooocccccuuuuurrrrereeeemmmmmeeeeennnnntttt t c ccccooooollllllllleeeleeaaaaaggggguuuuueeeeesssss tttotoooo r rrrereeeeddddduuuuuccccceeeee a aaaannnnnyyyyy d ddddeeeeellllaaalaayyyyysssss t tttotoooo aaaaappppppppppoooooiiiinnninnttttmtmmmmeeeeennnnnttttstssss | 0000011111/////0000044444/////22222000001111199999 | 33333 | 33333 | 99999 | |
| 2222233333 | SSSSSttttrtrrraraaaatttteteeeegggggiiiicccicc | PPPPPrrrroroooogggggrrrraraaaammmmmmmmmmeeeee | IIIInInnnnsssssuuuuufffffffffifiiicccicciiiieeeieennnnntttt t t tttitiiimmmimmeeeee aaaaavvvvvaaaaaiiiilllilaaalaabbbbblllleeelee f fffofoooorrrr r k kkkkeeeeeyyyyy sssssttttataaaakkkkkeeeeehhhhhooooolllldddlddeeeeerrrrsrssss t tttotoooo iiiinnninnpppppuuuuutttt t i iiinnninnttttotoooo p pppprrrroroooojjjjejeeeeccccctttt t ddddduuuuueeeee t tttotoooo o ooootttththhhheeeeerrrr r cccccooooommmmmmmmmmiiiitttitmtmmmmeeeeennnnnttttstssss | PPPPPrrrroroooojjjjejeeeeccccctttt t d ddddeeeeellllaaalaayyyyyeeeeeddddd | CCCCClllliiilieeeieennnnnttttt | OOOOOpppppeeeeennnnn | 44444 | 44444 | 1111166666 | OOOOObbbbbttttataaaaiiiinnninn c ccccooooommmmmmmmmmiiiitttitmtmmmmeeeeennnnntttt t f fffrfrrroroooommmmm a aaaalllllllll l kkkkkeeeeeyyyyy s ssssttttataaaakkkkkeeeeehhhhhooooolllldddlddeeeeerrrrsrssss t ttththhhhrrrroroooouuuuuggggghhhhh aaaaagggggrrrrereeeeeeeeemmmmmeeeeennnnntttt t o ooooffff f P PPPPEEEEEPPPPP | 0000011111/////0000044444/////22222000001111199999 | 33333 | 33333 | 99999 | |
| 2222244444 | SSSSSttttrtrrraraaaatttteteeeegggggiiiicccicc | PPPPPllllaaalaannnnnnnnnniiiinnninnggggg | O OOOObbbbbjjjjejeeeecccccttttitiiioooioonnnnnsssss t tttotoooo pppppllllaaalaannnnnnnnnniiiinnninnggggg..... | DDDDDeeeeellllaaalaayyyyy p ppppllllaaalaannnnnnnnnniiiinnninnggggg,,,, , ppppprrrroroooojjjjejeeeeccccctttt t c ccccooooouuuuulllldddldd b bbbbeeeee dddddeeeeellllaaalaayyyyyeeeeeddddd..... | CCCCClllliiilieeeieennnnnttttt | OOOOOpppppeeeeennnnn | 33333 | 44444 | 1111122222 r | EEEEEaaaaarrrrlrlllyyylyy c ccccooooommmmmmmmmmsssss s ssssttttrtrrraraaaatttteteeeegggggyyyyy t tttotoooo b bbbbeeeee aaaaadddddoooooppppptttteteeeeddddd a aaaannnnnddddd c ccccooooonnnnnsssssuuuuulllltttlteteeeeddddd o oooonnnnn a aaaa rrrereeeeggggguuuuullllaaalaarrrr r b bbbbaaaaasssssiiiisssiss w wwwwiiiitttiththhhh t ttththhhheeeee sssssttttataaaakkkkkeeeeehhhhhooooolllldddlddeeeeerrrrsrssss..... | 0000011111/////0000044444/////22222000001111199999 | 11111 | 33333 | 33333 | |
| 2222255555 | FFFFFiiiinnninnaaaaannnnnccccciiiiaaaiaalllll | DDDDDeeeeesssssiiiigggiggnnnnn | GGGGGIIII I r rrrereeeepppppooooorrrrtrttt t r rrrereeeeqqqqquuuuuiiiirrrirereeeeddddd aaaaatttt t D DDDD11111 t tttotoooo i iiinnninnffffofoooorrrrmrmmmm ffffofoooouuuuunnnnndddddaaaaattttitiiioooioonnnnn d ddddeeeeesssssiiiigggiggnnnnn | IIIInInnnncccccrrrrereeeeaaaaassssseeeeeddddd C CCCCooooosssssttttstssss ooooovvvvveeeeerrrr r a aaaannnnnddddd a aaaabbbbbooooovvvvveeeee wwwwwhhhhhaaaaatttt t h hhhhaaaaasssss b bbbbeeeeeeeeeennnnn aaaaallllllllloooloowwwwweeeeeddddd f fffofoooorrrr r i iiinnninn t ttththhhheeeee bbbbbuuuuudddddgggggeeeeetttt.t.... | CCCCClllliiilieeeieennnnnttttt | OOOOOpppppeeeeennnnn | 33333 | 55555 | 1111155555 i | EEEEEnnnnnsssssuuuuurrrrereeee G GGGGIIII I I IIInInnnntttteteeeerrrrprppppuuuuuttttitiiivvvivveeeee r rrrereeeepppppooooorrrrtrttt t iiisssiss c ccccooooommmmmmmmmmiiiisssisssssssiiiioooioonnnnneeeeeddddd a aaaatttt t t ttththhhheeeee s ssssttttataaaarrrrtrttt t oooooffff f D DDDD11111 | 0000011111/////0000044444/////22222000001111199999 | 11111 | 33333 | 33333 | |
| 2222266666 | FFFFFiiiinnninnaaaaannnnnccccciiiiaaaiaalllll | PPPPPrrrroroooogggggrrrraraaaammmmmmmmmmeeeee | SSSSSiiiitttiteteeee m mmmmaaaaayyyyy h hhhhaaaaavvvvveeeee aaaaarrrrcrcccchhhhhaaaaaeeeeeooooolllloooloogggggiiiiccciccaaaaallll l v vvvvaaaaalllluuuluueeeee | DDDDDeeeeellllaaalaayyyyy t tttotoooo p pppprrrroroooojjjjejeeeecccccttttt | CCCCClllliiilieeeieennnnnttttt | OOOOOpppppeeeeennnnn | 22222 | 55555 | 1111100000 | EEEEEaaaaarrrrlrlllyyylyy c ccccooooonnnnnsssssuuuuulllltttltataaaattttitiiioooioonnnnn r rrrereeeeqqqqquuuuuiiiirrrirereeeeddddd ddddduuuuurrrririiinnninnggggg D DDDD11111 t tttotoooo e eeeesssssttttataaaabbbbblllliiilisssisshhhhh r rrririiisssisskkkkk t tttotoooo ppppprrrroroooojjjjejeeeeccccctttt.t.... | 0000011111/////0000044444/////22222000001111199999 | 11111 | 22222 | 22222 | |
| 2222277777 | FFFFFiiiinnninnaaaaannnnnccccciiiiaaaiaalllll | DDDDDeeeeesssssiiiigggiggnnnnn | UUUUUnnnnnccccceeeeerrrrtrtttataaaaiiiinnninniiiitttitytyyyy aaaaassssssssssoooooccccciiiiaaaiaatttteteeeeddddd w wwwwiiiitttiththhhh uuuuuttttitiiillliliiilitttititiiieeeieesssss a aaaannnnnddddd e eeeennnnneeeeerrrrgrggggyyyyy sssssuuuuuppppppppppllllyyylyy | AAAAAddddddddddiiiitttititiiioooioonnnnniiiiaaaiaallll l C CCCCooooossssstttt t t tttotoooo tttththhhheeeee p pppprrrroroooojjjjejeeeeccccctttt.t.... | CCCCClllliiilieeeieennnnnttttt | OOOOOpppppeeeeennnnn | 33333 | 55555 | 1111155555 r t | FFFFFuuuuurrrrtrttththhhheeeeerrrr r d ddddeeeeettttataaaaiiiilllileeeleeddddd i iiinnninnvvvvveeeeesssssttttitiiigggiggaaaaattttitiiioooioonnnnn rrrereeeeqqqqquuuuuiiiirrrirereeeeddddd a aaaatttt t D DDDD11111 t tttotoooo a aaaasssssccccceeeeerrrrtrtttataaaaiiiinnninn ttththhhheeeee i iiinnninntttteteeeerrrrfrfffafaaaaccccceeeee r rrrereeeeqqqqquuuuuiiiirrrirereeeemmmmmeeeeennnnnttttstssss..... | 0000011111/////0000044444/////22222000001111199999 | 22222 | 33333 | 66666 | |
| 2222288888 | FFFFFiiiinnninnaaaaannnnnccccciiiiaaaiaalllll | DDDDDeeeeesssssiiiigggiggnnnnn | SSSSSuuuuusssssttttataaaaiiiinnninnaaaaabbbbbiiiillliliiilitttitytyyyy/////BBBBBrrrrereeeeeeeeeaaaaa mmmmm R RRRReeeeeqqqqquuuuuiiiirrrirereeeemmmmmeeeeennnnnttttstssss d ddddooooo nnnnnoooootttt t a aaaalllliiiligggiggnnnnn w wwwwiiiitttiththhhh cccccuuuuurrrrrrrrrereeeennnnntttt t b bbbbuuuuudddddgggggeeeeetttt t aaaaavvvvvaaaaaiiiilllilaaalaabbbbblllleeelee..... | IIIISISSSSSSSSSMMMMM S SSSSuuuuusssssttttataaaaiiiinnninnaaaaabbbbbiiiillliliiilitttitytyyyy ttttataaaarrrrgrggggeeeeettttstssss m mmmmaaaaayyyyy n nnnneeeeeeeeeeddddd ttttotoooo b bbbbeeeee d ddddeeeeerrrroroooogggggaaaaatttteteeeeddddd o oooorrrr r VVVVVEEEEE u uuuunnnnndddddeeeeerrrrtrtttataaaakkkkkeeeeennnnn | Project - CCCCClllliiilieeeieennnnnttttt | Castle R OOOOOpppppeeeeennnnn | ushen High 33333 | School 33333 | 99999 | DDDDD11111 d ddddeeeeesssssiiiigggiggnnnnn t tttotoooo t tttataaaakkkkkeeeee a aaaaccccccccccooooouuuuunnnnntttt t o ooooffff f DDDDDEEEEESSSSSCCCCC s ssssuuuuusssssttttataaaaiiiinnninnaaaaabbbbbiiiillliliiilitttitytyyyy v vvvviiiisssissiiiioooioonnnnn aaaaannnnnddddd c ccccooooossssstttt t p ppppllllaaalaannnnn i iiinnninnffffofoooorrrrmrmmmmeeeeeddddd..... | 0000011111/////0000044444/////22222000001111199999 | 11111 | 11111 | 11111 | |
| tego2222r29y9999 | Risk FFFFFiiiinTnninnaiaaatanlnnnenccccciiiiaaaiaalllll | Risk Descriptio PPPPPrrrrorooooggggNgrrrraaraaaarmmmmrmammmmtmiveeeeee | nLLLLL/aaa aaccccckkkkk o ooooffff f c ccccooooonnnnnttttrtrrraraaaacccccttttitiiinnninnggggg rrrrereeeesssssooooouuuuurrrrcrcccCceeeeeo o oonoonnnsnn e I IIIqsIsssslullleeeleee no oooocffff f e s MMMMMaaaaannnnn | IIIIsIssssR a aaaia s r rrrkiriiisssis skOkkkk tw tttotoooon c cccecooooorssssstttt tS ta aaaaannnnnddddd p pppprrrroroooogggggrrrraraaaammmmmmmmmmeeeee | Proba tuCCCsCClllliiilieeeieennnnnttttt (1 - | bility Im OOOOOpppppeeeeennnnn 5) ( | pact Risk 55555 1 - 5) Aut | Rating 55555 Mit oCal | igatin222g22555 55Action t | EEEEEaaaaarrrrlrlllyyylyy C CCCCooooonnnnnttttrtrrraraaaacccccttttotoooorArrr r cI IIInIntnnnivovvvvoonoooll llvvvlvveeeeemmmmmeeeeennnnnttttAt CCCCCooooonnnnnsssssiiiidddiddeeeeerrrr r U UUUUKKKKK c ccccooooonnnOnnttttwrtrrraraaanaccccecttttrotoooorrrrsrssss Da aaaatattt t t e/ ttteteeeennnnndddddeeeeerrrrr | ction Update PM | Probability Im 0000011111/////0000044444/////22222000001111199999 (1 - 5) (1 | pact Risk R 33333 - 5) Auto | ating 33333 Cal | 99999 |
| 3333300000 | MMMMMaaaaannnnnaaaaagggggeeeeemmmmmeeeeennnnnttttt | DDDDDeeeeesssssiiiigggiggnnnnn Agreement o | DDDDDeeeeesssssiiiigggiggnnnnn t ttteteeeeaaaaammmmm aaaaAappppppppppppooooooiiiitttiitmtnmmmmtemeeeennnnnetttttnt of f design team an | LLLLLaaaaatttteteeee a aaaappppppppppoooooiiiinnninnttttmtmmmmeeeeennnnntttt t oooooffff f t ttththhhheeeee D DDDDeeeeesssssiiiigggiggnnnnn T TTTTeeeeeaaaaammmmm the cccccooooouuuuulllldddldd a aaaafffffffffefeeeeccccctttt t d ppppprrrroroooogggggrrrraraaaammmmmmmmmmeeeee..... | CCCCClllliiilieeeieennnnnttttt | OOOOOpppppeeeeennnnn | 33333 | 33333 Ear | 99999 i ly engagemei | DDDDDeeeeesssssiiiigggiggnnnnn t ttteteeeeaaaaammmmm t tttotoooo b bbbbeeeee a aaaappppppppppoooooiiiinnninntttteteeeeddddd iiinnninn g ggggooooooooooddddd t tttitiiimmmimmeeeee - ---- I IIITITTTTTTTTT t tttotoooo b bbbbeeeee niiisssistssss ssuwuuuueeeieetddddhd Q QQQlQe3333g3 2a 22220l000 01111199999 | 0000011111/////0000044444/////22222000001111199999 | 11111 | 11111 | 11111 | |
| mercial | Procurement | appointment method is delay | main contracto ed delayed and project delaye | r Client Op d | en 4 | TTTTToooootttttaaaaalllll | 4 1 | an 6 to ap | d procuremen reduce any de pointments | t colleagues 01/0 lays to | 4/2019 | 3 TTTTToooootttttaaaaalllll | 3 9 |
| Organisation | Name & Position | Address | Telephone | |
|---|---|---|---|---|
| Numbers | ||||
| Isle of Man Government | Richard Collister Director of Estates | Department of Education, Sport and Culture Hamilton House, Peel Road, Douglas, Isle of Man, IM1 5EZ | email address | phone number |
| Isle of Man Government | Geoff Moorcroft Director of Education | Department of Education, Sport and Culture Hamilton House, Peel Road, Douglas, Isle of Man, IM1 5EZ | email address 2 | phone number |
| Isle of Man Government | Paul Slinger Director of Projects | Sea Terminal, Department of Infrastructure, Douglas, IOM IM1 2RF | email address | phone number |
| Isle of Man Government | Emma Kilip Project Manager | Sea Terminal, Department of Infrastructure, Douglas, IOM IM1 2RF | email address | 0phone number |
| Isle of Man Government | Keith Winstanley Head Teacher Castle Rushen High School | Castle Rushen High School,Arbory Road Castletown Isle of ManIM9 1RE | email address | phone number |
| Isle of Man Government | John Danielson Business Manager and Head of Sixth Form | Castle Rushen High School,Arbory Road Castletown Isle of ManIM9 1RE | email address | phone number |
| Organisation | Business Manager and HeNaadm ofe S &ix Ptho Fsoitrimon | Road Castletown Isle ofA MddanreIsMs9 1RE | Telephone | |
|---|---|---|---|---|
| Numbers | ||||
| TIsulern oefr M&a n TGoowvenrsnemndent | DRiacrhraernd C Cleogllgister ADsirseocctioart eo fD Eirsetcattoers | 6Dtehp aFlrotmore, n5t5 o f SEdpuricnagt iGona,r dSepnosr,t Manadn cChuelstuterer, M2 2HBaYmilton House, Peel Road, Douglas, | email address k 3 | phone number |
| Turner & Townsend Isle of Man Government | Philip Jackson Associate Director Geoff Moorcroft | Isle of Man, IM1 65tEhZ Floor, 55 Spring Gardens, Manchester, M2 Department of 2EBduYcation, Sport | Pemail address Geoff.Moorcroft@sch.im | phone number 01624693834 |
| Turner & Townsend | Director of Education Mark Abbott Project Director | and Culture 6Htahm Fillotoonr, H5o5u se, SPeperiln Rgo Gada,r dDeonusg, las, MIsalen cohf eMsatenr,, IMM21 25BEZY | email address | 07624460341 phone number |
| Sheppard Robson | James Jones Partner | City Tower Piccadilly Plaza Manchester M1 4BT | Jemail address | phone number |
| Sheppard Robson | Rupert Goddard Partner | City Tower Piccadilly Plaza Manchester M1 4BT | email address | phone number |
| Sheppard Robson | JasminEastwood Architect | City Tower Piccadilly Plaza Manchester M1 4BT | Jemail address | 0phone number |
| Sheppard Robson | Stuart Pavitt ArchitecturalAssistant | City Tower Piccadilly Plaza Manchester M1 4BT | email address | 0phone number |
| s. 30 (2)(b) | |
|---|---|
| s. 30 (2)(b) |
| sco |
|---|
| pe |
Full Response Text
Corporate Services Division Department of Education, Sport and Culture Hamilton House Peel Road, Douglas IM1 5EZ Telephone: (01624) 685808 Website: www.gov.im/dec Email: dec@foi.gov.im Our ref: 1922397 23 September 2021
Dear ###,
We write further to your request which was received on 26 July 2021 and which states:
"With reference to the proposed new CRHS I seek the following information: Further to the DESCs Minister's statement in the House of Keys 18th Dec 2018 (www.tynwald.org.im/business/OPHansardIndex1821/2876.pdf#search = %22castletown%22) on the subject of the progress with regard to the new school in Castletown, I request a copy of the finalised reports referred by him to in his response to Mr Moorhouse's question; and Copies of all correspondence, relevant extracts from minutes of meetings and any other information relating to the 'early dialogue with Treasury to ensure that the project is ultimately allocated an appropriate budget'; A copy of any design and business case(s) compiled as part of the new school project; Details of financial expenditure incurred to date regarding the new school, broken down by cost area e.g. ground works, design fees etc; Details of such financial expenditure as has been approved but which is yet to be incurred; Such information as is held relating to commencement of the building works for the new school building(s), and current estimated timeframe for the project (including key milestones)."
Our response to your request is as follows: Finalised report We have enclosed a copy of the following information held: • Castle Rushen High School (CRHS) strategic brief
While our aim is to provide information whenever possible, in this instance some of the information is exempt from disclosure under section 30 (2) (b) of the Act as disclosure would prejudice the commercial interests of person (including a company, partnership or another public body – in this case the Department). Disclosure of the cost estimates and details of the option appraisals for the CRHS project would prejudice the tendering process which has not yet taken place and which is based upon commercial competition. As section 30 is a qualified exemption, it is subject to a public interest test. The public interest must be something that is of serious concern and benefit to the public at large.
Factors in favour of disclosure
•
Disclosure of the information would support transparency and promote
openness and accountability to the general public in relation to the
development of CRHS project.
•
Accountability for the spending of public funds.
•
The cost estimates generated so far are not the final costs which will be
included as part of the tendering process.
•
Disclosure of the information would allow the public to see the details of each
of the options considered by the Department and how much each option could
cost.
Factors in favour of withholding
•
Ensuring that the Government and the Department is getting value for money
when purchasing goods and services within this competitive tendering process.
It is not in the public interest for information to be disclosed that could impact
Government and Departmental expenditure.
•
Disclosing the information would prejudice the tendering process in terms of
bids received from contractors and this could put some contractors at an unfair
advantage, and others at a disadvantage.
•
The costs of capital programme future schemes within the Isle of Man
Government’s 2021/22 budget have not been released. Disclosure may set a
precedent for estimated costings to be disclosed by Government pre-tender
exercise. The cumulative impact of this on Government’s ability to achieve
value for money when purchasing services could be substantial and this would
not be in the public interest.
•
Disclosure of the information would likely impact the bids received through the
tender exercise, with the cost of the works either being over or underestimated
by those bidding for the works, which could have an impact on the overall
outcome of the project works.
•
The upcoming general election is likely to result in a new Minister being
appointed to DESC and following this the Department may wish to revise the
chosen approach to this scheme. Therefore disclosure of the option appraisals
would likely impact the bids received through the tender exercise as there is a
possibility that the option which has been chosen as part of the CRHS project
may change.
In taking these factors into account the Department of Education, Sport and Culture determined that the factors in favour of maintaining the exemption outweigh the factors in favour of disclosing the information.
As well as section 30 some of the information is also exempt under section 35 (c) of the Act, as disclosure would prejudice the effective conduct of public business. Disclosure of the cost estimates and details of the option appraisals for the CRHS project would prejudice the tendering process which the Department is required to undertake. The tender process has not yet taken place. As section 35 is a qualified exemption, it is subject to a public interest test. The public interest must be something that is of serious concern and benefit to the public at large.
Factors in favour of disclosure
•
Disclosure of the information would support transparency and promote
openness and accountability to the general public in relation to the
development of the new Castle Rushen school project.
•
Disclosure of the information would allow the public to see the details of each
of the options considered by the Department and how much each option could
cost
Factors in favour of withholding
•
Ensuring that the Government and the Department is getting value for money
when purchasing goods and services within this competitive tendering process.
It is not in the public interest for information to be disclosed that would impact
Government and Departmental expenditure.
•
Disclosure of the information would likely impact the tender exercise, with the
cost of the works either being over or underestimated by those bidding for the
works, which could have an impact on the overall outcome of the project
works.
•
The exemption is time sensitive, at the point in time the tender exercise is
complete and an organisation has been appointed to undertake the work it may
be possible to disclose the information.
•
The upcoming general election is likely to result in a new Minister being
appointed to DESC and following this the Department may wish to revise the
chosen approach to this scheme. Therefore disclosure of the option appraisals
would likely impact the tender exercise as there is a possibility that the option
which has been chosen as part of the CRHS project may change.
In taking these factors into account the Department of Education, Sport and Culture determined that the factors in favour of maintaining the exemption outweigh the factors in favour of disclosing the information. Early dialogue with Treasury We have enclosed copies of the following information held: • Extracts from DESC department reports • Extracts from DESC department monthly meetings
• Email correspondence with Treasury • CRHS presentation to Treasury While our aim is to provide information whenever possible, in this instance some of the information is exempt from disclosure under section 30 (2) (b) of the Act as disclosure would prejudice the commercial interests of person (including a company, partnership or another public body – in this case the Department). Disclosure of the cost estimates and details of the option appraisals for the CRHS project would prejudice the tendering process which has not yet taken place and which is based upon commercial competition. As section 30 is a qualified exemption, it is subject to a public interest test. The public interest must be something that is of serious concern and benefit to the public at large.
Factors in favour of disclosure
•
Disclosure of the information would support transparency and promote
openness and accountability to the general public in relation to the
development of CRHS project.
•
Accountability for the spending of public funds.
•
The cost estimates generated so far are not the final costs which will be
included as part of the tendering process.
•
Disclosure of the information would allow the public to see the details of each
of the options considered by the Department and how much each option could
cost.
Factors in favour of withholding
•
Ensuring that the Government and the Department is getting value for money
when purchasing goods and services within this competitive tendering process.
It is not in the public interest for information to be disclosed that could impact
Government and Departmental expenditure.
•
Disclosing the information would prejudice the tendering process in terms of
bids received from contractors and this could put some contractors at an unfair
advantage, and others at a disadvantage.
•
The costs of capital programme future schemes within the Isle of Man
Government’s 2021/22 budget have not been released. Disclosure may set a
precedent for estimated costings to be disclosed by Government pre-tender
exercise. The cumulative impact of this on Government’s ability to achieve
value for money when purchasing services could be substantial and this would
not be in the public interest.
•
Disclosure of the information would likely impact the bids received through the
tender exercise, with the cost of the works either being over or underestimated
by those bidding for the works, which could have an impact on the overall
outcome of the project works.
•
The upcoming general election is likely to result in a new Minister being
appointed to DESC and following this the Department may wish to revise the
chosen approach to this scheme. Therefore disclosure of the option appraisals
would likely impact the bids received through the tender exercise as there is a
possibility that the option which has been chosen as part of the CRHS project
may change.
In taking these factors into account the Department of Education, Sport and Culture determined that the factors in favour of maintaining the exemption outweigh the factors in favour of disclosing the information.
As well as section 30 some of the information is also exempt under section 35 (c) of the Act, as disclosure would prejudice the effective conduct of public business. Disclosure of the cost estimates and details of the option appraisals for the CRHS project would prejudice the tendering process which the Department is required to undertake. The tender process has not yet taken place. As section 35 is a qualified exemption, it is subject to a public interest test. The public interest must be something that is of serious concern and benefit to the public at large.
Factors in favour of disclosure
•
Disclosure of the information would support transparency and promote
openness and accountability to the general public in relation to the
development of the new Castle Rushen school project.
•
Disclosure of the information would allow the public to see the details of each
of the options considered by the Department and how much each option could
cost
Factors in favour of withholding
•
Ensuring that the Government and the Department is getting value for money
when purchasing goods and services within this competitive tendering process.
It is not in the public interest for information to be disclosed that would impact
Government and Departmental expenditure.
•
Disclosure of the information would likely impact the tender exercise, with the
cost of the works either being over or underestimated by those bidding for the
works, which could have an impact on the overall outcome of the project
works.
•
The exemption is time sensitive, at the point in time the tender exercise is
complete and an organisation has been appointed to undertake the work it may
be possible to disclose the information.
•
The upcoming general election is likely to result in a new Minister being
appointed to DESC and following this the Department may wish to revise the
chosen approach to this scheme. Therefore disclosure of the option appraisals
would likely impact the tender exercise as there is a possibility that the option
which has been chosen as part of the CRHS project may change.
In taking these factors into account the Department of Education, Sport and Culture determined that the factors in favour of maintaining the exemption outweigh the factors in favour of disclosing the information. Business case We have enclosed a copy of the following information held: • CRHS redevelopment business case
While our aim is to provide information whenever possible, in this instance some of the information is exempt from disclosure under section 30 (2) (b) of the Act as disclosure would prejudice the commercial interests of person (including a company, partnership or another public body – in this case the Department). Disclosure of the cost estimates and details of the option appraisals, including the business case appendices, for the CRHS project would prejudice the tendering process which has not yet taken place and which is based upon commercial competition. As section 30 is a qualified exemption, it is subject to a public interest test. The public interest must be something that is of serious concern and benefit to the public at large.
Factors in favour of disclosure • Disclosure of the information would support transparency and promote openness and accountability to the general public in relation to the development of the new Castle Rushen school project. • Accountability for the spending of public funds. • The cost estimates generated so far are not the final costs which will be included as part of the tendering process.
Factors in favour of withholding
•
Ensuring that the Government and the Department is getting value for money
when purchasing goods and services within this competitive tendering process.
It is not in the public interest for information to be disclosed that could impact
Government and Departmental expenditure.
•
Disclosing the information would prejudice the tendering process in terms of
bids received from contractors, depending on which option is progressed, and
this could put some contractors at an unfair advantage, and others at a
disadvantage.
•
Disclosure of the information would likely impact the tender exercise, with the
cost of the works either being over or underestimated by those bidding for the
works, which could have an impact on the overall outcome of the project
works.
•
Disclosure of the information could inhibit the Department’s ability to seek
competitive tenders with a consequent impact on its ability to make best use of
public funds.
•
The exemption is time sensitive, at the point i